Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON1$840.00$840.00 to $840.00
Bids
  • 2024-12-05 · MDT · 05C24 · $840.00 per TON · qty 393.0 · bid tab
curb gutterGAL1$375.00$375.00 to $375.00
Bids
  • 2024-12-05 · MDT · 05C24 · $375.00 per GAL · qty 48.0 · bid tab
curb gutterLNFT1$120.00$120.00 to $120.00
Bids
  • 2024-12-05 · MDT · 05C24 · $120.00 per LNFT · qty 743.6 · bid tab
inlet headwallEACH1$6,300.00$6,300.00 to $6,300.00
Bids
  • 2024-12-05 · MDT · 05C24 · $6,300.00 per EACH · qty 5.0 · bid tab