Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON11$214.00$60.79 to $1,009.00
Bids
  • 2025-01-09 · MDT · 01125 · $972.90 per TON · qty 86.0 · bid tab
  • 2025-01-09 · MDT · 01125 · $706.47 per TON · qty 358.9 · bid tab
  • 2025-01-09 · MDT · 01125 · $117.70 per TON · qty 468.0 · bid tab
  • 2025-01-09 · MDT · 01125 · $85.60 per TON · qty 6165.0 · bid tab
  • 2024-06-27 · MDT · 09624 · $60.79 per TON · qty 14468.0 · bid tab
  • 2024-06-27 · MDT · 09624 · $852.70 per TON · qty 244.9 · bid tab
  • 2024-06-27 · MDT · 09624 · $753.50 per TON · qty 779.1 · bid tab
  • 2024-06-27 · MDT · 09624 · $90.79 per TON · qty 379.0 · bid tab
  • 2023-11-16 · MDT · 03B23 · $90.95 per TON · qty 12073.0 · bid tab
  • 2023-11-16 · MDT · 03B23 · $214.00 per TON · qty 2185.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
curb gutterGAL1$374.50$374.50 to $374.50
Bids
  • 2023-11-16 · MDT · 03B23 · $374.50 per GAL · qty 20.0 · bid tab
curb gutterLNFT2$85.00$70.00 to $100.00
Bids
  • 2023-11-16 · MDT · 03B23 · $100.00 per LNFT · qty 54.3 · bid tab
  • 2023-11-16 · MDT · 03B23 · $70.00 per LNFT · qty 3484.8 · bid tab
excavation embankmentCUYD2$10.07$8.38 to $11.75
Bids
  • 2025-01-09 · MDT · 01125 · $8.38 per CUYD · qty 74875.0 · bid tab
  • 2023-11-16 · MDT · 03B23 · $11.75 per CUYD · qty 64036.0 · bid tab
fire hydrantEACH1$9,802.00$9,802.00 to $9,802.00
Bids
  • 2023-11-16 · MDT · 03B23 · $9,802.00 per EACH · qty 10.0 · bid tab
inlet headwallEACH2$4,125.00$1,750.00 to $6,500.00
Bids
  • 2023-11-16 · MDT · 03B23 · $6,500.00 per EACH · qty 1.0 · bid tab
  • 2023-11-16 · MDT · 03B23 · $1,750.00 per EACH · qty 25.0 · bid tab
lime cement stabilizationSQYD3$4.11$1.80 to $7.00
Bids
  • 2025-01-09 · MDT · 01125 · $4.11 per SQYD · qty 361.0 · bid tab
  • 2024-06-27 · MDT · 09624 · $7.00 per SQYD · qty 1452.0 · bid tab
  • 2023-11-16 · MDT · 03B23 · $1.80 per SQYD · qty 29979.0 · bid tab
lime cement stabilizationTON3$283.98$257.60 to $358.45
Bids
  • 2025-01-09 · MDT · 01125 · $283.98 per TON · qty 86.3 · bid tab
  • 2024-06-27 · MDT · 09624 · $257.60 per TON · qty 208.0 · bid tab
  • 2023-11-16 · MDT · 03B23 · $358.45 per TON · qty 200.0 · bid tab
manholeEACH3$13,000.00$10,000.00 to $16,233.29
Bids
  • 2025-01-09 · MDT · 01125 · $16,233.29 per EACH · qty 1.0 · bid tab
  • 2023-11-16 · MDT · 03B23 · $10,000.00 per EACH · qty 38.0 · bid tab
  • 2023-11-16 · MDT · 03B23 · $13,000.00 per EACH · qty 6.0 · bid tab
sewer serviceEACH1$2,687.00$2,687.00 to $2,687.00
Bids
  • 2023-11-16 · MDT · 03B23 · $2,687.00 per EACH · qty 12.0 · bid tab
sidewalkEACH1$1,500.00$1,500.00 to $1,500.00
Bids
  • 2023-11-16 · MDT · 03B23 · $1,500.00 per EACH · qty 1.0 · bid tab
water serviceEACH1$2,738.00$2,738.00 to $2,738.00
Bids
  • 2023-11-16 · MDT · 03B23 · $2,738.00 per EACH · qty 49.0 · bid tab
water serviceLNFT1$44.00$44.00 to $44.00
Bids
  • 2023-11-16 · MDT · 03B23 · $44.00 per LNFT · qty 1555.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.