PadstakeGet the fee reports
Menu

Site-work prices, Carbon County, MT

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$421.50$65.00 to $875.00
Bids
  • 2024-01-11 · MDT · 10823 · $65.00 per TON · qty 35206.0 · bid tab
  • 2024-01-11 · MDT · 10823 · $875.00 per TON · qty 379.2 · bid tab
  • 2024-01-11 · MDT · 10823 · $175.00 per TON · qty 678.0 · bid tab
  • 2024-01-11 · MDT · 10823 · $668.00 per TON · qty 1935.8 · bid tab
excavation embankmentCUYD2$33.42$8.84 to $58.00
Bids
  • 2026-06-25 · MDT · 10626 · $8.84 per CUYD · qty 57533.0 · bid tab
  • 2024-01-11 · MDT · 10823 · $58.00 per CUYD · qty 1918.0 · bid tab
lime cement stabilizationSQYD1$3.50$3.50 to $3.50
Bids
  • 2024-01-11 · MDT · 10823 · $3.50 per SQYD · qty 3037.0 · bid tab
lime cement stabilizationTON1$272.00$272.00 to $272.00
Bids
  • 2024-01-11 · MDT · 10823 · $272.00 per TON · qty 502.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.