PadstakeGet the fee reports
Menu

Site-work prices, Big Horn County, MT

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON6$725.00$83.00 to $1,000.00
Bids
  • 2026-01-15 · MDT · 09R25 · $800.00 per TON · qty 940.3 · bid tab
  • 2025-10-23 · MDT · 07R25 · $800.00 per TON · qty 919.6 · bid tab
  • 2024-10-24 · MDT · 09R24 · $83.00 per TON · qty 33771.0 · bid tab
  • 2024-10-24 · MDT · 09R24 · $175.00 per TON · qty 1156.0 · bid tab
  • 2024-10-24 · MDT · 09R24 · $1,000.00 per TON · qty 686.0 · bid tab
  • 2024-10-24 · MDT · 09R24 · $650.00 per TON · qty 1817.0 · bid tab
lime cement stabilizationSQYD2$4.00$4.00 to $4.00
Bids
  • 2026-01-15 · MDT · 09R25 · $4.00 per SQYD · qty 1053.0 · bid tab
  • 2024-10-24 · MDT · 09R24 · $4.00 per SQYD · qty 5235.0 · bid tab
lime cement stabilizationTON1$350.00$350.00 to $350.00
Bids
  • 2024-10-24 · MDT · 09R24 · $350.00 per TON · qty 473.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.