Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| curb gutter | EA | 6 | $4,800.68 | $3,600.00 to $5,148.05 | Bids- 2026-05-15 · MoDOT · 260515-D03 · $4,100.00 per EA · qty 4.0 · bid tab
- 2026-03-20 · MoDOT · 260320-D01 · $5,030.46 per EA · qty 12.0 · bid tab
- 2026-03-20 · MoDOT · 260320-D01 · $5,030.46 per EA · qty 4.0 · bid tab
- 2025-03-14 · MoDOT · 250314-D04 · $4,570.91 per EA · qty 4.0 · bid tab
- 2025-02-21 · MoDOT · 250221-D01 · $3,600.00 per EA · qty 4.0 · bid tab
- 2024-08-16 · MoDOT · 240816-D01 · $5,148.05 per EA · qty 4.0 · bid tab
|
| curb gutter | LF | 1 | $40.00 | $40.00 to $40.00 | Bids- 2026-05-15 · MoDOT · 260515-D03 · $40.00 per LF · qty 483.0 · bid tab
|
| excavation embankment | CUYD | 7 | $10.00 | $5.00 to $22.65 | Bids- 2026-05-15 · MoDOT · 260515-D03 · $5.00 per CUYD · qty 6272.0 · bid tab
- 2026-05-15 · MoDOT · 260515-D03 · $10.00 per CUYD · qty 8475.0 · bid tab
- 2026-05-15 · MoDOT · 260515-D03 · $13.50 per CUYD · qty 94225.0 · bid tab
- 2026-05-15 · MoDOT · 260515-D05 · $10.00 per CUYD · qty 505.0 · bid tab
- 2025-02-21 · MoDOT · 250221-D01 · $22.65 per CUYD · qty 2810.0 · bid tab
- 2025-02-21 · MoDOT · 250221-D01 · $15.30 per CUYD · qty 1087.0 · bid tab
- 2025-02-21 · MoDOT · 250221-D01 · $5.00 per CUYD · qty 946.0 · bid tab
|
| sidewalk | EA | 1 | $5,295.23 | $5,295.23 to $5,295.23 | Bids- 2026-03-20 · MoDOT · 260320-D01 · $5,295.23 per EA · qty 1.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.