Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementSQYD1$120.00$120.00 to $120.00
Bids
  • 2025-03-14 · MoDOT · 250314-H01 · $120.00 per SQYD · qty 8050.3 · bid tab
curb gutterEA3$4,200.00$4,000.00 to $4,200.00
Bids
  • 2025-02-21 · MoDOT · 250221-H03 · $4,000.00 per EA · qty 4.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-H04 · $4,200.00 per EA · qty 5.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-H04 · $4,200.00 per EA · qty 3.0 · bid tab
curb gutterLF4$86.50$30.00 to $165.00
Bids
  • 2025-03-14 · MoDOT · 250314-H01 · $118.00 per LF · qty 107.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-H01 · $55.00 per LF · qty 759.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-H01 · $30.00 per LF · qty 1819.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-H04 · $165.00 per LF · qty 430.0 · bid tab
excavation embankmentCUYD2$1.50$1.00 to $2.00
Bids
  • 2024-05-17 · MoDOT · 240517-H04 · $2.00 per CUYD · qty 48003.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-H04 · $1.00 per CUYD · qty 3412.0 · bid tab
inlet headwallEA1$135.00$135.00 to $135.00
Bids
  • 2025-03-14 · MoDOT · 250314-H01 · $135.00 per EA · qty 30.0 · bid tab
inlet headwallFT3$1,140.00$696.00 to $1,990.00
Bids
  • 2025-03-14 · MoDOT · 250314-H01 · $1,140.00 per FT · qty 29.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-H01 · $696.00 per FT · qty 42.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-H01 · $1,990.00 per FT · qty 18.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.