PadstakeGet the fee reports
Menu

Site-work prices, Shelby County, MO

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementSQYD1$202.61$202.61 to $202.61
Bids
  • 2026-02-20 · MoDOT · 260220-B02 · $202.61 per SQYD · qty 266.0 · bid tab
curb gutterEA1$4,000.00$4,000.00 to $4,000.00
Bids
  • 2025-02-21 · MoDOT · 250221-B06 · $4,000.00 per EA · qty 4.0 · bid tab
curb gutterLF2$75.25$65.09 to $85.41
Bids
  • 2026-02-20 · MoDOT · 260220-B02 · $85.41 per LF · qty 726.0 · bid tab
  • 2026-02-20 · MoDOT · 260220-B02 · $65.09 per LF · qty 212.0 · bid tab
excavation embankmentCUYD2$4.40$2.80 to $6.00
Bids
  • 2025-01-17 · MoDOT · 250117-B02 · $6.00 per CUYD · qty 846.0 · bid tab
  • 2024-04-19 · MoDOT · 240419-B01 · $2.80 per CUYD · qty 115.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.