PadstakeGet the fee reports
Menu

Site-work prices, Ray County, MO

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementSQYD2$57.23$9.75 to $104.71
Bids
  • 2025-11-14 · MoDOT · 251114-C01 · $9.75 per SQYD · qty 1818.0 · bid tab
  • 2025-02-21 · MoDOT · 250221-C01 · $104.71 per SQYD · qty 72.5 · bid tab
curb gutterEA2$3,760.00$3,760.00 to $3,760.00
Bids
  • 2025-11-14 · MoDOT · 251114-C01 · $3,760.00 per EA · qty 4.0 · bid tab
  • 2025-11-14 · MoDOT · 251114-C01 · $3,760.00 per EA · qty 3.0 · bid tab
curb gutterLF1$119.00$119.00 to $119.00
Bids
  • 2025-11-14 · MoDOT · 251114-C01 · $119.00 per LF · qty 15.0 · bid tab
excavation embankmentCUYD2$21.62$17.00 to $26.25
Bids
  • 2025-12-12 · MoDOT · 251212-C03 · $17.00 per CUYD · qty 106.0 · bid tab
  • 2025-02-21 · MoDOT · 250221-C01 · $26.25 per CUYD · qty 259.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.