Site-work prices, Polk County, MO
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| curb gutter | EA | 3 | $4,000.00 | $232.21 to $4,395.21 | Bids- 2026-02-20 · MoDOT · 260220-G01 · $4,000.00 per EA · qty 2.0 · bid tab
- 2024-04-19 · MoDOT · 240419-G04 · $4,395.21 per EA · qty 4.0 · bid tab
- 2024-04-19 · MoDOT · 240419-G04 · $232.21 per EA · qty 60.0 · bid tab
|
| curb gutter | LF | 5 | $64.00 | $38.00 to $177.63 | Bids- 2024-04-19 · MoDOT · 240419-G04 · $177.63 per LF · qty 435.0 · bid tab
- 2024-02-16 · MoDOT · 240216-G08 · $64.00 per LF · qty 216.0 · bid tab
- 2024-02-16 · MoDOT · 240216-G08 · $38.00 per LF · qty 497.0 · bid tab
- 2024-02-16 · MoDOT · 240216-G08 · $41.00 per LF · qty 2482.0 · bid tab
- 2024-02-16 · MoDOT · 240216-G08 · $66.00 per LF · qty 97.0 · bid tab
|
| excavation embankment | CUYD | 2 | $8.15 | $8.00 to $8.30 | Bids- 2026-02-20 · MoDOT · 260220-G01 · $8.00 per CUYD · qty 1936.0 · bid tab
- 2026-02-20 · MoDOT · 260220-G01 · $8.30 per CUYD · qty 4259.0 · bid tab
|
| inlet headwall | EA | 1 | $150.00 | $150.00 to $150.00 | Bids- 2024-02-16 · MoDOT · 240216-G08 · $150.00 per EA · qty 12.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $79.90 | $79.90 to $79.90 | Bids- 2026-02-20 · MoDOT · 260220-G01 · $79.90 per LF · qty 358.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.