PadstakeGet the fee reports
Menu

Site-work prices, Mississippi County, MO

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementSQYD2$50.85$10.70 to $91.00
Bids
  • 2026-03-20 · MoDOT · 260320-H04 · $10.70 per SQYD · qty 10239.0 · bid tab
  • 2024-02-16 · MoDOT · 240216-H03 · $91.00 per SQYD · qty 2454.4 · bid tab
curb gutterEA1$4,200.00$4,200.00 to $4,200.00
Bids
  • 2025-04-18 · MoDOT · 250418-H05 · $4,200.00 per EA · qty 2.0 · bid tab
excavation embankmentCUYD8$15.00$9.00 to $185.00
Bids
  • 2025-04-18 · MoDOT · 250418-H05 · $185.00 per CUYD · qty 3.0 · bid tab
  • 2025-04-18 · MoDOT · 250418-H05 · $9.00 per CUYD · qty 113.0 · bid tab
  • 2025-04-18 · MoDOT · 250418-H05 · $15.00 per CUYD · qty 59.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-H02 · $15.00 per CUYD · qty 346.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-H02 · $57.00 per CUYD · qty 1376.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-H02 · $45.00 per CUYD · qty 7.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-H02 · $10.00 per CUYD · qty 139.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-H02 · $10.00 per CUYD · qty 223.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.