Site-work prices, Miller County, MO

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementSQYD2$87.43$84.38 to $90.48
Bids
  • 2024-05-17 · MoDOT · 240517-D12 · $84.38 per SQYD · qty 952.9 · bid tab
  • 2024-05-17 · MoDOT · 240517-D12 · $90.48 per SQYD · qty 274.6 · bid tab
curb gutterEA1$3,093.47$3,093.47 to $3,093.47
Bids
  • 2024-10-18 · MoDOT · 241018-D2A · $3,093.47 per EA · qty 7.0 · bid tab
curb gutterLF6$47.62$43.11 to $70.01
Bids
  • 2024-05-17 · MoDOT · 240517-D12 · $51.87 per LF · qty 374.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-D12 · $43.56 per LF · qty 376.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-D12 · $47.17 per LF · qty 329.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-D12 · $70.01 per LF · qty 77.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-D12 · $48.08 per LF · qty 520.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-D12 · $43.11 per LF · qty 145.0 · bid tab
excavation embankmentCUYD1$272.08$272.08 to $272.08
Bids
  • 2024-10-18 · MoDOT · 241018-D2A · $272.08 per CUYD · qty 18.0 · bid tab
inlet headwallEA1$210.58$210.58 to $210.58
Bids
  • 2024-05-17 · MoDOT · 240517-D12 · $210.58 per EA · qty 20.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.