Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| concrete pavement | SQYD | 1 | $146.04 | $146.04 to $146.04 | Bids- 2025-12-12 · MoDOT · 251212-A03 · $146.04 per SQYD · qty 711.2 · bid tab
|
| curb gutter | EA | 4 | $3,550.22 | $3,278.00 to $3,822.43 | Bids- 2025-12-12 · MoDOT · 251212-A01 · $3,822.43 per EA · qty 4.0 · bid tab
- 2025-12-12 · MoDOT · 251212-A01 · $3,822.43 per EA · qty 8.0 · bid tab
- 2023-11-17 · MoDOT · 231117-A01 · $3,278.00 per EA · qty 1.0 · bid tab
- 2023-11-17 · MoDOT · 231117-A01 · $3,278.00 per EA · qty 16.0 · bid tab
|
| curb gutter | LF | 5 | $24.65 | $24.65 to $125.00 | Bids- 2025-12-12 · MoDOT · 251212-A01 · $125.00 per LF · qty 14.0 · bid tab
- 2025-11-14 · MoDOT · 251114-A01 · $24.65 per LF · qty 1031.0 · bid tab
- 2025-11-14 · MoDOT · 251114-A01 · $24.65 per LF · qty 263.0 · bid tab
- 2025-11-14 · MoDOT · 251114-A01 · $24.65 per LF · qty 269.0 · bid tab
- 2025-11-14 · MoDOT · 251114-A01 · $33.31 per LF · qty 202.0 · bid tab
|
| excavation embankment | CUYD | 2 | $72.50 | $45.00 to $100.00 | Bids- 2023-11-17 · MoDOT · 231117-A01 · $100.00 per CUYD · qty 1.0 · bid tab
- 2023-11-17 · MoDOT · 231117-A01 · $45.00 per CUYD · qty 12.0 · bid tab
|
| inlet headwall | EA | 1 | $192.50 | $192.50 to $192.50 | Bids- 2025-11-14 · MoDOT · 251114-A01 · $192.50 per EA · qty 13.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.