PadstakeGet the fee reports
Menu

Site-work prices, Lincoln County, MO

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementSQYD3$82.50$59.00 to $82.50
Bids
  • 2024-05-17 · MoDOT · 240517-B01 · $82.50 per SQYD · qty 14366.5 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $59.00 per SQYD · qty 7273.1 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $82.50 per SQYD · qty 15718.5 · bid tab
curb gutterEA1$3,500.00$3,500.00 to $3,500.00
Bids
  • 2025-12-12 · MoDOT · 251212-B03 · $3,500.00 per EA · qty 4.0 · bid tab
curb gutterLF2$43.12$28.00 to $58.25
Bids
  • 2026-04-17 · MoDOT · 260417-B02 · $58.25 per LF · qty 4410.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $28.00 per LF · qty 8009.0 · bid tab
excavation embankmentCUYD5$5.00$4.41 to $24.00
Bids
  • 2026-04-17 · MoDOT · 260417-B02 · $4.41 per CUYD · qty 40878.0 · bid tab
  • 2025-12-12 · MoDOT · 251212-B03 · $4.50 per CUYD · qty 804.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $10.00 per CUYD · qty 14322.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $5.00 per CUYD · qty 30118.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $24.00 per CUYD · qty 35554.0 · bid tab
fire hydrantEA1$11,459.00$11,459.00 to $11,459.00
Bids
  • 2026-04-17 · MoDOT · 260417-B02 · $11,459.00 per EA · qty 1.0 · bid tab
inlet headwallEA1$95.00$95.00 to $95.00
Bids
  • 2024-05-17 · MoDOT · 240517-B01 · $95.00 per EA · qty 33.0 · bid tab
inlet headwallFT5$780.00$750.00 to $1,583.86
Bids
  • 2026-04-17 · MoDOT · 260417-B02 · $1,583.86 per FT · qty 7.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $860.00 per FT · qty 4.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $750.00 per FT · qty 173.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $760.00 per FT · qty 35.0 · bid tab
  • 2024-05-17 · MoDOT · 240517-B01 · $780.00 per FT · qty 11.0 · bid tab
lime cement stabilizationSQFT1$40.00$40.00 to $40.00
Bids
  • 2024-05-17 · MoDOT · 240517-B01 · $40.00 per SQFT · qty 1316.0 · bid tab
storm pipe 38-inchLF1$192.74$192.74 to $192.74
Bids
  • 2026-04-17 · MoDOT · 260417-B02 · $192.74 per LF · qty 195.0 · bid tab
storm pipe (diameter not stated)LF6$801.74$586.19 to $1,431.26
Bids
  • 2026-04-17 · MoDOT · 260417-B02 · $795.63 per LF · qty 381.0 · bid tab
  • 2026-04-17 · MoDOT · 260417-B02 · $1,180.09 per LF · qty 45.0 · bid tab
  • 2026-04-17 · MoDOT · 260417-B02 · $1,431.26 per LF · qty 34.0 · bid tab
  • 2026-04-17 · MoDOT · 260417-B02 · $760.06 per LF · qty 353.0 · bid tab
  • 2026-04-17 · MoDOT · 260417-B02 · $586.19 per LF · qty 101.0 · bid tab
  • 2026-04-17 · MoDOT · 260417-B02 · $807.85 per LF · qty 100.0 · bid tab
water main 6-inchLF1$60.81$60.81 to $60.81
Bids
  • 2026-04-17 · MoDOT · 260417-B02 · $60.81 per LF · qty 1009.0 · bid tab
water main 8-inchLF1$57.90$57.90 to $57.90
Bids
  • 2026-04-17 · MoDOT · 260417-B02 · $57.90 per LF · qty 2688.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.