PadstakeGet the fee reports
Menu

Site-work prices, Greene County, MO

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementSQYD11$82.48$48.68 to $169.00
Bids
  • 2026-03-20 · MoDOT · 260320-G01 · $91.00 per SQYD · qty 82.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $82.48 per SQYD · qty 9816.2 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $48.68 per SQYD · qty 44986.9 · bid tab
  • 2025-08-15 · MoDOT · 250815-G02 · $139.00 per SQYD · qty 297.9 · bid tab
  • 2025-08-15 · MoDOT · 250815-G02 · $169.00 per SQYD · qty 18.1 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $70.00 per SQYD · qty 84719.7 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $66.75 per SQYD · qty 49981.8 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $67.50 per SQYD · qty 126229.6 · bid tab
  • 2024-11-15 · MoDOT · 241115-G3A · $153.50 per SQYD · qty 1192.7 · bid tab
  • 2024-11-15 · MoDOT · 241115-G3A · $90.90 per SQYD · qty 14362.3 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
curb gutterEA9$3,800.00$3,200.00 to $5,346.76
Bids
  • 2025-10-17 · MoDOT · 251017-G02 · $3,835.50 per EA · qty 4.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G04 · $3,920.00 per EA · qty 2.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G04 · $4,000.00 per EA · qty 2.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-G03 · $3,800.00 per EA · qty 2.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $3,300.00 per EA · qty 10.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $3,200.00 per EA · qty 12.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G3A · $3,600.00 per EA · qty 2.0 · bid tab
  • 2024-03-15 · MoDOT · 240315-G02 · $5,346.76 per EA · qty 4.0 · bid tab
  • 2023-12-15 · MoDOT · 231215-G01 · $3,600.00 per EA · qty 4.0 · bid tab
curb gutterLF30$55.45$3.65 to $159.50
Bids
  • 2026-03-20 · MoDOT · 260320-G01 · $44.00 per LF · qty 482.0 · bid tab
  • 2026-03-20 · MoDOT · 260320-G01 · $46.00 per LF · qty 252.0 · bid tab
  • 2026-03-20 · MoDOT · 260320-G01 · $124.00 per LF · qty 11.0 · bid tab
  • 2026-03-20 · MoDOT · 260320-G01 · $61.00 per LF · qty 328.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $28.30 per LF · qty 460.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $3.65 per LF · qty 355.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $24.86 per LF · qty 10482.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $67.02 per LF · qty 493.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G04 · $159.50 per LF · qty 37.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G04 · $55.90 per LF · qty 606.0 · bid tab
(10 most recent of 30 shown; all in the Hubstake feed)
excavation embankmentCUYD24$6.75$4.90 to $100.00
Bids
  • 2025-10-17 · MoDOT · 251017-G02 · $6.39 per CUYD · qty 14865.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $6.37 per CUYD · qty 5224.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $15.12 per CUYD · qty 182712.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G04 · $7.00 per CUYD · qty 6983.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G04 · $8.50 per CUYD · qty 5264.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G04 · $32.10 per CUYD · qty 4615.0 · bid tab
  • 2025-08-15 · MoDOT · 250815-G02 · $100.00 per CUYD · qty 133.0 · bid tab
  • 2025-08-15 · MoDOT · 250815-G02 · $100.00 per CUYD · qty 46.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-G03 · $7.70 per CUYD · qty 12711.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-G03 · $5.80 per CUYD · qty 16974.0 · bid tab
(10 most recent of 24 shown; all in the Hubstake feed)
inlet headwallEA14$187.16$95.60 to $6,200.00
Bids
  • 2026-03-20 · MoDOT · 260320-G01 · $180.32 per EA · qty 5.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $164.66 per EA · qty 80.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G04 · $252.50 per EA · qty 1.0 · bid tab
  • 2025-08-15 · MoDOT · 250815-G02 · $150.00 per EA · qty 16.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-G03 · $1,260.00 per EA · qty 4.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-G03 · $150.00 per EA · qty 4.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $150.00 per EA · qty 40.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $150.00 per EA · qty 72.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G3A · $6,200.00 per EA · qty 1.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G3A · $2,950.00 per EA · qty 8.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
inlet headwallFT25$956.50$637.06 to $8,000.00
Bids
  • 2025-10-17 · MoDOT · 251017-G02 · $1,066.74 per FT · qty 3.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $711.99 per FT · qty 69.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $637.06 per FT · qty 932.0 · bid tab
  • 2025-08-15 · MoDOT · 250815-G02 · $1,500.00 per FT · qty 14.0 · bid tab
  • 2025-08-15 · MoDOT · 250815-G02 · $1,000.00 per FT · qty 3.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-G03 · $908.00 per FT · qty 15.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $750.00 per FT · qty 8.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $8,000.00 per FT · qty 14.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $5,600.00 per FT · qty 7.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $850.00 per FT · qty 110.0 · bid tab
(10 most recent of 25 shown; all in the Hubstake feed)
inlet headwallLF1$1,243.00$1,243.00 to $1,243.00
Bids
  • 2026-03-20 · MoDOT · 260320-G01 · $1,243.00 per LF · qty 10.0 · bid tab
lime cement stabilizationSQFT8$82.00$80.00 to $155.00
Bids
  • 2025-03-14 · MoDOT · 250314-G03 · $155.00 per SQFT · qty 3697.0 · bid tab
  • 2025-03-14 · MoDOT · 250314-G03 · $155.00 per SQFT · qty 2878.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $80.00 per SQFT · qty 3950.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $80.00 per SQFT · qty 3752.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $84.00 per SQFT · qty 4002.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $82.00 per SQFT · qty 5092.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $82.00 per SQFT · qty 3447.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $80.00 per SQFT · qty 3822.0 · bid tab
manholeEA4$5,222.00$900.00 to $8,764.00
Bids
  • 2026-03-20 · MoDOT · 260320-G01 · $7,844.00 per EA · qty 1.0 · bid tab
  • 2026-03-20 · MoDOT · 260320-G01 · $8,764.00 per EA · qty 1.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $900.00 per EA · qty 18.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $2,600.00 per EA · qty 3.0 · bid tab
sewer main (diameter not stated)LF2$470.54$90.34 to $850.74
Bids
  • 2025-10-17 · MoDOT · 251017-G02 · $90.34 per LF · qty 646.0 · bid tab
  • 2025-10-17 · MoDOT · 251017-G02 · $850.74 per LF · qty 408.0 · bid tab
sidewalkEA1$950.00$950.00 to $950.00
Bids
  • 2024-12-13 · MoDOT · 241213-G02 · $950.00 per EA · qty 1.0 · bid tab
sidewalkLF6$20.41$5.10 to $63.26
Bids
  • 2024-04-19 · MoDOT · 240419-G05 · $20.41 per LF · qty 1000.0 · bid tab
  • 2024-04-19 · MoDOT · 240419-G05 · $5.10 per LF · qty 7500.0 · bid tab
  • 2024-04-19 · MoDOT · 240419-G05 · $5.10 per LF · qty 5000.0 · bid tab
  • 2024-04-19 · MoDOT · 240419-G05 · $63.26 per LF · qty 109.0 · bid tab
  • 2024-04-19 · MoDOT · 240419-G05 · $20.41 per LF · qty 350.0 · bid tab
  • 2024-01-19 · MoDOT · 240119-G09 · $24.00 per LF · qty 16.0 · bid tab
storm pipe 19-inchLF1$135.00$135.00 to $135.00
Bids
  • 2024-11-15 · MoDOT · 241115-G3A · $135.00 per LF · qty 67.0 · bid tab
storm pipe 22-inchLF1$205.50$205.50 to $205.50
Bids
  • 2024-11-15 · MoDOT · 241115-G3A · $205.50 per LF · qty 41.0 · bid tab
storm pipe 24-inchLF1$172.50$172.50 to $172.50
Bids
  • 2024-11-15 · MoDOT · 241115-G3A · $172.50 per LF · qty 80.0 · bid tab
storm pipe 26-inchLF1$233.50$233.50 to $233.50
Bids
  • 2024-11-15 · MoDOT · 241115-G3A · $233.50 per LF · qty 11.0 · bid tab
storm pipe 29-inchLF1$346.00$346.00 to $346.00
Bids
  • 2026-03-20 · MoDOT · 260320-G01 · $346.00 per LF · qty 7.0 · bid tab
storm pipe 30-inchLF1$160.32$160.32 to $160.32
Bids
  • 2025-10-17 · MoDOT · 251017-G02 · $160.32 per LF · qty 255.0 · bid tab
storm pipe (diameter not stated)LF3$1,600.00$1,500.00 to $1,650.00
Bids
  • 2024-12-13 · MoDOT · 241213-G02 · $1,650.00 per LF · qty 140.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $1,600.00 per LF · qty 100.0 · bid tab
  • 2024-12-13 · MoDOT · 241213-G02 · $1,500.00 per LF · qty 200.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.