Site-work prices, Dunklin County, MO

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementSQYD1$195.00$195.00 to $195.00
Bids
  • 2025-08-15 · MoDOT · 250815-H04 · $195.00 per SQYD · qty 49.1 · bid tab
curb gutterEA5$4,200.00$3,900.00 to $4,756.96
Bids
  • 2025-08-15 · MoDOT · 250815-H04 · $4,756.96 per EA · qty 3.0 · bid tab
  • 2025-05-16 · MoDOT · 250516-H5A · $3,900.00 per EA · qty 23.0 · bid tab
  • 2025-04-18 · MoDOT · 250418-H01 · $4,200.00 per EA · qty 4.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-H02 · $4,000.00 per EA · qty 4.0 · bid tab
  • 2024-03-15 · MoDOT · 240315-H03 · $4,200.00 per EA · qty 6.0 · bid tab
curb gutterLF5$105.00$85.00 to $165.00
Bids
  • 2025-05-16 · MoDOT · 250516-H5A · $105.00 per LF · qty 636.0 · bid tab
  • 2025-05-16 · MoDOT · 250516-H5A · $85.00 per LF · qty 1320.0 · bid tab
  • 2025-05-16 · MoDOT · 250516-H5A · $101.00 per LF · qty 695.0 · bid tab
  • 2025-05-16 · MoDOT · 250516-H5A · $107.00 per LF · qty 612.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-H02 · $165.00 per LF · qty 314.0 · bid tab
excavation embankmentCUYD2$25.00$15.00 to $35.00
Bids
  • 2024-03-15 · MoDOT · 240315-H03 · $15.00 per CUYD · qty 289.0 · bid tab
  • 2024-03-15 · MoDOT · 240315-H03 · $35.00 per CUYD · qty 66.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.