Site-work prices, Dunklin County, MO
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| concrete pavement | SQYD | 1 | $195.00 | $195.00 to $195.00 | Bids- 2025-08-15 · MoDOT · 250815-H04 · $195.00 per SQYD · qty 49.1 · bid tab
|
| curb gutter | EA | 5 | $4,200.00 | $3,900.00 to $4,756.96 | Bids- 2025-08-15 · MoDOT · 250815-H04 · $4,756.96 per EA · qty 3.0 · bid tab
- 2025-05-16 · MoDOT · 250516-H5A · $3,900.00 per EA · qty 23.0 · bid tab
- 2025-04-18 · MoDOT · 250418-H01 · $4,200.00 per EA · qty 4.0 · bid tab
- 2024-11-15 · MoDOT · 241115-H02 · $4,000.00 per EA · qty 4.0 · bid tab
- 2024-03-15 · MoDOT · 240315-H03 · $4,200.00 per EA · qty 6.0 · bid tab
|
| curb gutter | LF | 5 | $105.00 | $85.00 to $165.00 | Bids- 2025-05-16 · MoDOT · 250516-H5A · $105.00 per LF · qty 636.0 · bid tab
- 2025-05-16 · MoDOT · 250516-H5A · $85.00 per LF · qty 1320.0 · bid tab
- 2025-05-16 · MoDOT · 250516-H5A · $101.00 per LF · qty 695.0 · bid tab
- 2025-05-16 · MoDOT · 250516-H5A · $107.00 per LF · qty 612.0 · bid tab
- 2024-11-15 · MoDOT · 241115-H02 · $165.00 per LF · qty 314.0 · bid tab
|
| excavation embankment | CUYD | 2 | $25.00 | $15.00 to $35.00 | Bids- 2024-03-15 · MoDOT · 240315-H03 · $15.00 per CUYD · qty 289.0 · bid tab
- 2024-03-15 · MoDOT · 240315-H03 · $35.00 per CUYD · qty 66.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.