PadstakeGet the fee reports
Menu

Site-work prices, Christian County, MO

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementSQYD2$127.50$100.00 to $155.00
Bids
  • 2025-05-16 · MoDOT · 250516-G04 · $155.00 per SQYD · qty 227.1 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $100.00 per SQYD · qty 6768.1 · bid tab
curb gutterLF13$47.35$1.45 to $185.00
Bids
  • 2026-04-17 · MoDOT · 260417-G01 · $47.35 per LF · qty 46.0 · bid tab
  • 2026-04-17 · MoDOT · 260417-G01 · $42.15 per LF · qty 1018.0 · bid tab
  • 2025-05-16 · MoDOT · 250516-G04 · $8.25 per LF · qty 56.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $50.00 per LF · qty 277.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $27.00 per LF · qty 361.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $55.00 per LF · qty 307.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $1.45 per LF · qty 1805.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $1.50 per LF · qty 306.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $50.00 per LF · qty 2211.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $47.00 per LF · qty 3973.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
excavation embankmentCUYD11$17.50$5.82 to $325.00
Bids
  • 2026-04-17 · MoDOT · 260417-G01 · $26.50 per CUYD · qty 10296.0 · bid tab
  • 2026-04-17 · MoDOT · 260417-G01 · $5.95 per CUYD · qty 4068.0 · bid tab
  • 2026-04-17 · MoDOT · 260417-G01 · $19.20 per CUYD · qty 5085.0 · bid tab
  • 2025-05-16 · MoDOT · 250516-G04 · $45.00 per CUYD · qty 191.0 · bid tab
  • 2025-05-16 · MoDOT · 250516-G04 · $325.00 per CUYD · qty 10.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $24.00 per CUYD · qty 4937.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $9.00 per CUYD · qty 3419.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $16.50 per CUYD · qty 11096.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $5.82 per CUYD · qty 10122.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $7.29 per CUYD · qty 10100.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
fire hydrantEA1$9,200.00$9,200.00 to $9,200.00
Bids
  • 2024-11-15 · MoDOT · 241115-G02 · $9,200.00 per EA · qty 2.0 · bid tab
inlet headwallEA10$4,750.00$52.65 to $6,150.00
Bids
  • 2026-04-17 · MoDOT · 260417-G01 · $52.65 per EA · qty 18.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $90.00 per EA · qty 21.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $6,075.00 per EA · qty 17.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $90.00 per EA · qty 33.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $5,780.00 per EA · qty 2.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $660.00 per EA · qty 1.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $6,150.00 per EA · qty 1.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $6,075.00 per EA · qty 3.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $5,100.00 per EA · qty 1.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $4,400.00 per EA · qty 1.0 · bid tab
inlet headwallFT7$1,020.00$617.00 to $1,500.00
Bids
  • 2026-04-17 · MoDOT · 260417-G01 · $617.00 per FT · qty 125.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $1,400.00 per FT · qty 3.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $840.00 per FT · qty 6.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $950.00 per FT · qty 54.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $1,300.00 per FT · qty 111.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $1,020.00 per FT · qty 4.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $1,500.00 per FT · qty 3.0 · bid tab
lime cement stabilizationSQFT1$102.75$102.75 to $102.75
Bids
  • 2026-04-17 · MoDOT · 260417-G01 · $102.75 per SQFT · qty 206.0 · bid tab
storm pipe 15-inchLF2$100.00$100.00 to $100.00
Bids
  • 2024-11-15 · MoDOT · 241115-G02 · $100.00 per LF · qty 33.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $100.00 per LF · qty 48.0 · bid tab
storm pipe 18-inchLF2$135.00$110.00 to $160.00
Bids
  • 2024-11-15 · MoDOT · 241115-G02 · $110.00 per LF · qty 283.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $160.00 per LF · qty 36.0 · bid tab
storm pipe 24-inchLF2$127.50$125.00 to $130.00
Bids
  • 2024-11-15 · MoDOT · 241115-G02 · $130.00 per LF · qty 136.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $125.00 per LF · qty 217.0 · bid tab
storm pipe 30-inchLF3$144.00$144.00 to $160.00
Bids
  • 2024-11-15 · MoDOT · 241115-G02 · $160.00 per LF · qty 72.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $144.00 per LF · qty 96.0 · bid tab
  • 2024-11-15 · MoDOT · 241115-G02 · $144.00 per LF · qty 287.0 · bid tab
storm pipe 34-inchLF1$275.00$275.00 to $275.00
Bids
  • 2024-11-15 · MoDOT · 241115-G02 · $275.00 per LF · qty 71.0 · bid tab
storm pipe 36-inchLF1$200.00$200.00 to $200.00
Bids
  • 2024-11-15 · MoDOT · 241115-G02 · $200.00 per LF · qty 43.0 · bid tab
water main 10-inchLF1$77.00$77.00 to $77.00
Bids
  • 2024-11-15 · MoDOT · 241115-G02 · $77.00 per LF · qty 2087.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.