Site-work prices, Wadena County, MN
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| concrete pavement | S Y | 1 | $38.85 | $38.85 to $38.85 | Bids
|
| curb gutter | L F | 2 | $26.25 | $17.50 to $35.00 | |
| fire hydrant | EACH | 1 | $10,778.95 | $10,778.95 to $10,778.95 | Bids
|
| flexible base | C Y | 2 | $33.73 | $32.46 to $35.00 | |
| flexible base | TON | 2 | $37.34 | $29.69 to $45.00 | |
| inlet headwall | EACH | 1 | $334.91 | $334.91 to $334.91 | Bids
|
| lime cement stabilization | ACRE | 1 | $500.00 | $500.00 to $500.00 | Bids
|
| lime cement stabilization | LB | 1 | $1.30 | $1.30 to $1.30 | Bids
|
| lime cement stabilization | LS | 1 | $1,500.00 | $1,500.00 to $1,500.00 | Bids
|
| lime cement stabilization | S Y | 2 | $2.78 | $2.70 to $2.85 | |
| lime cement stabilization | TON | 1 | $200.00 | $200.00 to $200.00 | Bids
|
| manhole | EACH | 1 | $1,813.28 | $1,813.28 to $1,813.28 | Bids
|
| sewer service | EACH | 1 | $574.20 | $574.20 to $574.20 | Bids
|
| sewer service | L F | 2 | $44.32 | $18.13 to $70.52 | |
| water service | L F | 1 | $19.14 | $19.14 to $19.14 | Bids
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.