Site-work prices, Red Lake County, MN

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
flexible baseC Y2$33.48$29.70 to $37.25
Bids
  • 2026-04-22 · MnDOT · 260058 · $29.70 per C Y · qty 669.0 · bid tab
  • 2025-06-24 · Red Lake County · 6301-56(TH 32) (Grading, Bituminous, Lighting) · $37.25 per C Y · qty 2063.0 · bid tab
lime cement stabilizationLS1$1,500.00$1,500.00 to $1,500.00
Bids
  • 2026-04-22 · MnDOT · 260058 · $1,500.00 per LS · qty 1.0 · bid tab
lime cement stabilizationMGAL1$700.00$700.00 to $700.00
Bids
  • 2026-04-22 · MnDOT · 260058 · $700.00 per MGAL · qty 11.0 · bid tab
lime cement stabilizationS Y1$3.50$3.50 to $3.50
Bids
  • 2026-04-22 · MnDOT · 260058 · $3.50 per S Y · qty 1259.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.