Site-work prices, Polk County, MN
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| concrete pavement | LS | 1 | $157,995.00 | $157,995.00 to $157,995.00 | Bids
|
| concrete pavement | S Y | 1 | $203.10 | $203.10 to $203.10 | Bids
|
| curb gutter | L F | 1 | $75.14 | $75.14 to $75.14 | Bids
|
| curb gutter | LS | 1 | $0.01 | $0.01 to $0.01 | Bids
|
| flexible base | C Y | 2 | $47.46 | $22.10 to $72.82 | |
| flexible base | TON | 1 | $15.50 | $15.50 to $15.50 | Bids
|
| lime cement stabilization | ACRE | 2 | $592.50 | $185.00 to $1,000.00 | |
| lime cement stabilization | LB | 2 | $1.48 | $1.20 to $1.75 |
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.