PadstakeGet the fee reports
Menu

Site-work prices, Polk County, MN

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
concrete pavementLS1$157,995.00$157,995.00 to $157,995.00
Bids
  • 2026-04-21 · MnDOT · 260703 · $157,995.00 per LS · qty 1.0 · bid tab
concrete pavementS Y1$203.10$203.10 to $203.10
Bids
  • 2024-03-22 · MnDOT · 240055 · $203.10 per S Y · qty 19.0 · bid tab
curb gutterL F1$75.14$75.14 to $75.14
Bids
  • 2024-03-22 · MnDOT · 240055 · $75.14 per L F · qty 151.0 · bid tab
curb gutterLS1$0.01$0.01 to $0.01
Bids
  • 2026-04-21 · MnDOT · 260703 · $0.01 per LS · qty 1.0 · bid tab
flexible baseC Y2$47.46$22.10 to $72.82
Bids
  • 2025-04-04 · Polk County · SAP 060-612-015 · $22.10 per C Y · qty 2296.0 · bid tab
  • 2024-03-22 · MnDOT · 240055 · $72.82 per C Y · qty 44.0 · bid tab
flexible baseTON1$15.50$15.50 to $15.50
Bids
  • 2025-04-04 · Polk County · SAP 060-612-015 · $15.50 per TON · qty 28000.0 · bid tab
lime cement stabilizationACRE2$592.50$185.00 to $1,000.00
Bids
  • 2026-05-15 · Polk County · CSAH 40, Grading & Aggregate Surfacing · $185.00 per ACRE · qty 1.0 · bid tab
  • 2025-04-04 · Polk County · SAP 060-612-015 · $1,000.00 per ACRE · qty 4.0 · bid tab
lime cement stabilizationLB2$1.48$1.20 to $1.75
Bids
  • 2026-05-15 · Polk County · CSAH 40, Grading & Aggregate Surfacing · $1.75 per LB · qty 2065.0 · bid tab
  • 2025-04-04 · Polk County · SAP 060-612-015 · $1.20 per LB · qty 14070.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.