| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| curb gutter | EA | 1 | $550.00 | $550.00 to $550.00 | Bids- 2023-11-15 · MaineDOT · 025293.00 · $550.00 per EA · qty 3.0 · bid tab
|
| curb gutter | LF | 5 | $85.00 | $38.00 to $237.73 | Bids- 2026-05-13 · MaineDOT · 028096.00 · $237.73 per LF · qty 45.0 · bid tab
- 2026-05-13 · MaineDOT · 028096.00 · $38.00 per LF · qty 1000.0 · bid tab
- 2024-05-22 · MaineDOT · 026966.00 · $40.00 per LF · qty 970.0 · bid tab
- 2023-11-15 · MaineDOT · 025293.00 · $85.00 per LF · qty 25.0 · bid tab
- 2023-11-15 · MaineDOT · 025293.00 · $175.00 per LF · qty 5.0 · bid tab
|
| curb gutter | SF | 1 | $5.28 | $5.28 to $5.28 | Bids- 2026-05-13 · MaineDOT · 028096.00 · $5.28 per SF · qty 410.0 · bid tab
|
| excavation embankment | CY | 7 | $48.00 | $21.28 to $165.00 | Bids- 2026-06-17 · MaineDOT · 025509.00 · $48.00 per CY · qty 60.0 · bid tab
- 2026-06-17 · MaineDOT · 025509.00 · $21.28 per CY · qty 470.0 · bid tab
- 2026-05-06 · MaineDOT · 029674.00 · $165.00 per CY · qty 45.0 · bid tab
- 2026-05-06 · MaineDOT · 029674.00 · $80.00 per CY · qty 400.0 · bid tab
- 2024-05-22 · MaineDOT · 026966.00 · $46.55 per CY · qty 4760.0 · bid tab
- 2023-12-27 · MaineDOT · 028690.00 · $40.00 per CY · qty 1300.0 · bid tab
- 2023-11-15 · MaineDOT · 025293.00 · $50.00 per CY · qty 70.0 · bid tab
|
| flexible base | CY | 4 | $63.38 | $40.00 to $200.00 | Bids- 2026-06-17 · MaineDOT · 025509.00 · $51.75 per CY · qty 400.0 · bid tab
- 2026-05-06 · MaineDOT · 029674.00 · $200.00 per CY · qty 45.0 · bid tab
- 2023-12-27 · MaineDOT · 028690.00 · $40.00 per CY · qty 3500.0 · bid tab
- 2023-11-15 · MaineDOT · 025293.00 · $75.00 per CY · qty 50.0 · bid tab
|
| flexible base | HR | 1 | $170.00 | $170.00 to $170.00 | Bids- 2024-05-22 · MaineDOT · 026966.00 · $170.00 per HR · qty 16.0 · bid tab
|
| lime cement stabilization | SY | 1 | $3.00 | $3.00 to $3.00 | Bids- 2023-12-27 · MaineDOT · 028690.00 · $3.00 per SY · qty 1500.0 · bid tab
|
| sidewalk | SF | 2 | $248.49 | $180.00 to $316.98 | Bids- 2026-05-13 · MaineDOT · 028096.00 · $316.98 per SF · qty 30.0 · bid tab
- 2023-11-15 · MaineDOT · 025293.00 · $180.00 per SF · qty 28.0 · bid tab
|
| sidewalk | SY | 3 | $175.00 | $105.66 to $550.00 | Bids- 2026-05-13 · MaineDOT · 028096.00 · $105.66 per SY · qty 25.0 · bid tab
- 2023-11-15 · MaineDOT · 025293.00 · $550.00 per SY · qty 6.0 · bid tab
- 2023-11-15 · MaineDOT · 025293.00 · $175.00 per SY · qty 12.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $264.15 | $264.15 to $266.01 | Bids- 2026-05-13 · MaineDOT · 028096.00 · $264.15 per LF · qty 88.0 · bid tab
- 2026-05-13 · MaineDOT · 028096.00 · $264.15 per LF · qty 309.0 · bid tab
- 2024-05-22 · MaineDOT · 026966.00 · $266.01 per LF · qty 360.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $320.42 | $280.00 to $344.60 | Bids- 2026-05-13 · MaineDOT · 028096.00 · $280.00 per LF · qty 152.0 · bid tab
- 2024-05-22 · MaineDOT · 026966.00 · $344.60 per LF · qty 60.0 · bid tab
- 2024-05-22 · MaineDOT · 026966.00 · $320.42 per LF · qty 80.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $380.88 | $380.88 to $380.88 | Bids- 2024-05-22 · MaineDOT · 026966.00 · $380.88 per LF · qty 40.0 · bid tab
|