Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON5$225.85$121.00 to $375.00
Bids
  • 2025-10-15 · LaDOTD · LA 421: THOM CREEK BRIDGE · $325.00 per TON · qty 228.6 · bid tab
  • 2025-10-15 · LaDOTD · LA 421: THOM CREEK BRIDGE · $375.00 per TON · qty 71.8 · bid tab
  • 2024-07-10 · LaDOTD · SLIGO ROAD OVER WALTER CREEK · $225.85 per TON · qty 124.2 · bid tab
  • 2024-06-26 · LaDOTD · LA 10: US 61 - 1.3 MI E US 61 · $121.00 per TON · qty 3521.9 · bid tab
  • 2024-06-26 · LaDOTD · LA 10: US 61 - 1.3 MI E US 61 · $200.00 per TON · qty 500.0 · bid tab
excavation embankmentCUYD2$43.50$42.00 to $45.00
Bids
  • 2025-10-15 · LaDOTD · LA 421: THOM CREEK BRIDGE · $42.00 per CUYD · qty 2028.0 · bid tab
  • 2024-06-26 · LaDOTD · LA 10: US 61 - 1.3 MI E US 61 · $45.00 per CUYD · qty 1200.0 · bid tab
inlet headwallEACH1$26,124.18$26,124.18 to $26,124.18
Bids
  • 2024-07-10 · LaDOTD · SLIGO ROAD OVER WALTER CREEK · $26,124.18 per EACH · qty 2.0 · bid tab
lime cement stabilizationSQYD2$19.41$0.65 to $38.17
Bids
  • 2024-07-10 · LaDOTD · SLIGO ROAD OVER WALTER CREEK · $0.65 per SQYD · qty 609.0 · bid tab
  • 2024-07-10 · LaDOTD · SLIGO ROAD OVER WALTER CREEK · $38.17 per SQYD · qty 609.0 · bid tab
lime cement stabilizationTON1$366.23$366.23 to $366.23
Bids
  • 2024-07-10 · LaDOTD · SLIGO ROAD OVER WALTER CREEK · $366.23 per TON · qty 8.58 · bid tab
sidewalkEACH1$2,000.00$2,000.00 to $2,000.00
Bids
  • 2025-10-15 · LaDOTD · LA 421: THOM CREEK BRIDGE · $2,000.00 per EACH · qty 1.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.