Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON10$192.00$100.00 to $850.00
Bids
  • 2025-12-10 · LaDOTD · LA 76: MULTI-USE PATH & SIDEWALKS, PH 1 · $258.00 per TON · qty 1291.2 · bid tab
  • 2025-06-25 · LaDOTD · I-10: W END OF BR 290 - W END OF LA 415 · $175.00 per TON · qty 388.3 · bid tab
  • 2025-06-25 · LaDOTD · I-10: W END OF BR 290 - W END OF LA 415 · $130.25 per TON · qty 69597.0 · bid tab
  • 2025-06-25 · LaDOTD · I-10: W END OF BR 290 - W END OF LA 415 · $100.00 per TON · qty 22270.3 · bid tab
  • 2025-06-11 · LaDOTD · LA 1: INTRACOASTAL BR - US 190 WB · $140.00 per TON · qty 16590.8 · bid tab
  • 2025-06-11 · LaDOTD · LA 1: INTRACOASTAL BR - US 190 WB · $220.00 per TON · qty 1031.6 · bid tab
  • 2025-02-12 · LaDOTD · LA 76: LA 415 - LA 1 · $310.00 per TON · qty 360.0 · bid tab
  • 2025-02-12 · LaDOTD · LA 76: LA 415 - LA 1 · $117.00 per TON · qty 6409.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $209.00 per TON · qty 2659.7 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $850.00 per TON · qty 13.8 · bid tab
concrete pavementEACH1$350.00$350.00 to $350.00
Bids
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $350.00 per EACH · qty 3.0 · bid tab
concrete pavementSQYD3$24.00$20.00 to $174.00
Bids
  • 2025-06-11 · LaDOTD · LA 1: INTRACOASTAL BR - US 190 WB · $24.00 per SQYD · qty 1104.0 · bid tab
  • 2025-06-11 · LaDOTD · LA 1: INTRACOASTAL BR - US 190 WB · $20.00 per SQYD · qty 1104.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $174.00 per SQYD · qty 10004.0 · bid tab
curb gutterLNFT2$63.00$26.00 to $100.00
Bids
  • 2025-12-10 · LaDOTD · LA 76: MULTI-USE PATH & SIDEWALKS, PH 1 · $26.00 per LNFT · qty 36.2 · bid tab
  • 2025-06-11 · LaDOTD · LA 1: INTRACOASTAL BR - US 190 WB · $100.00 per LNFT · qty 250.0 · bid tab
excavation embankmentCUYD4$156.50$66.00 to $206.00
Bids
  • 2025-06-11 · LaDOTD · LA 1: INTRACOASTAL BR - US 190 WB · $145.00 per CUYD · qty 407.0 · bid tab
  • 2025-02-12 · LaDOTD · LA 76: LA 415 - LA 1 · $168.00 per CUYD · qty 100.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $66.00 per CUYD · qty 18051.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $206.00 per CUYD · qty 337.0 · bid tab
flexible baseSQYD3$47.00$30.00 to $48.00
Bids
  • 2025-06-11 · LaDOTD · LA 1: INTRACOASTAL BR - US 190 WB · $48.00 per SQYD · qty 7640.2 · bid tab
  • 2025-02-12 · LaDOTD · LA 76: LA 415 - LA 1 · $30.00 per SQYD · qty 1326.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $47.00 per SQYD · qty 16400.2 · bid tab
inlet headwallEACH2$26,134.65$1,900.00 to $50,369.30
Bids
  • 2025-06-25 · LaDOTD · I-10: W END OF BR 290 - W END OF LA 415 · $50,369.30 per EACH · qty 1.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $1,900.00 per EACH · qty 2.0 · bid tab
lime cement stabilizationSQFT1$98.00$98.00 to $98.00
Bids
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $98.00 per SQFT · qty 6613.0 · bid tab
lime cement stabilizationSQYD2$20.00$20.00 to $20.00
Bids
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $20.00 per SQYD · qty 8910.9 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $20.00 per SQYD · qty 8910.9 · bid tab
lime cement stabilizationTON1$350.00$350.00 to $350.00
Bids
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $350.00 per TON · qty 11.1 · bid tab
manholeEACH4$1,380.86$1,276.25 to $1,589.90
Bids
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $1,438.38 per EACH · qty 3.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $1,323.34 per EACH · qty 6.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $1,589.90 per EACH · qty 14.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI) · $1,276.25 per EACH · qty 1.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.