PadstakeGet the fee reports
Menu

Site-work prices, Lincoln County, LA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON23$195.00$95.00 to $275.00
Bids
  • 2026-06-30 · LaDOTD · SPRING CREEK ROAD OVER WAFER CREEK · $220.00 per TON · qty 171.2 · bid tab
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $180.00 per TON · qty 193.6 · bid tab
  • 2026-03-11 · LaDOTD · LA 507: BIENVILLE P/L - LA 815 · $155.00 per TON · qty 6343.7 · bid tab
  • 2026-03-11 · LaDOTD · LA 507: BIENVILLE P/L - LA 815 · $105.00 per TON · qty 135.6 · bid tab
  • 2025-11-12 · LaDOTD · RUSTON DOWNTOWN REVITALIZATION PHASE IX · $250.00 per TON · qty 612.8 · bid tab
  • 2025-08-13 · LaDOTD · LA 150: US 80 - LA 149 · $95.00 per TON · qty 661.2 · bid tab
  • 2025-08-13 · LaDOTD · LA 150: US 80 - LA 149 · $142.00 per TON · qty 9468.5 · bid tab
  • 2025-07-09 · LaDOTD · LA 821: LA 820 - LA 145 · $265.00 per TON · qty 789.5 · bid tab
  • 2025-07-09 · LaDOTD · LA 821: LA 820 - LA 145 · $155.00 per TON · qty 9565.3 · bid tab
  • 2025-01-08 · LaDOTD · I-20: BIENVILLE P/L - 0.71 MILE W LA 149 · $132.00 per TON · qty 39474.4 · bid tab
(10 most recent of 23 shown; all in the Hubstake feed)
concrete pavementEACH2$500.00$350.00 to $650.00
Bids
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $650.00 per EACH · qty 5.0 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $350.00 per EACH · qty 45.0 · bid tab
concrete pavementSQYD5$185.00$160.00 to $300.00
Bids
  • 2026-09-09 · LaDOTD · LA 150: W OF MAPLE ST - N MONROE ST · $300.00 per SQYD · qty 8.9 · bid tab
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $170.00 per SQYD · qty 876.0 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $220.00 per SQYD · qty 3484.0 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $160.00 per SQYD · qty 24770.0 · bid tab
  • 2025-01-08 · LaDOTD · BONNER ST BRIDGE PED IMPR (RUSTON) · $185.00 per SQYD · qty 150.9 · bid tab
curb gutterLNFT8$50.00$9.00 to $95.00
Bids
  • 2026-09-09 · LaDOTD · LA 150: W OF MAPLE ST - N MONROE ST · $25.00 per LNFT · qty 1622.0 · bid tab
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $25.00 per LNFT · qty 259.0 · bid tab
  • 2025-11-12 · LaDOTD · RUSTON DOWNTOWN REVITALIZATION PHASE IX · $65.00 per LNFT · qty 141.3 · bid tab
  • 2025-11-12 · LaDOTD · RUSTON DOWNTOWN REVITALIZATION PHASE IX · $85.00 per LNFT · qty 1577.2 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $9.00 per LNFT · qty 10166.5 · bid tab
  • 2025-01-08 · LaDOTD · BONNER ST BRIDGE PED IMPR (RUSTON) · $65.00 per LNFT · qty 540.2 · bid tab
  • 2025-01-08 · LaDOTD · BONNER ST BRIDGE PED IMPR (RUSTON) · $95.00 per LNFT · qty 264.2 · bid tab
  • 2024-10-09 · LaDOTD · E. KENTUCKY AVE: GOODWIN TO LA 33 · $35.00 per LNFT · qty 11900.0 · bid tab
excavation embankmentCUYD13$55.00$20.00 to $106.55
Bids
  • 2026-09-09 · LaDOTD · LA 150: W OF MAPLE ST - N MONROE ST · $100.00 per CUYD · qty 18.0 · bid tab
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $35.00 per CUYD · qty 1328.0 · bid tab
  • 2026-03-11 · LaDOTD · LA 507: BIENVILLE P/L - LA 815 · $20.00 per CUYD · qty 3041.0 · bid tab
  • 2025-08-13 · LaDOTD · LA 150: US 80 - LA 149 · $29.75 per CUYD · qty 3840.0 · bid tab
  • 2025-07-09 · LaDOTD · LA 821: LA 820 - LA 145 · $95.00 per CUYD · qty 1312.0 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $55.00 per CUYD · qty 42600.0 · bid tab
  • 2025-01-08 · LaDOTD · I-20: BIENVILLE P/L - 0.71 MILE W LA 149 · $30.00 per CUYD · qty 357.0 · bid tab
  • 2024-10-09 · LaDOTD · LA 823: DRAINAGE IMPROVEMENTS · $20.00 per CUYD · qty 643.0 · bid tab
  • 2024-08-15 · LaDOTD · LA 33: DRAINAGE REPAIRS · $106.55 per CUYD · qty 100.0 · bid tab
  • 2024-07-10 · LaDOTD · LA 146: DRAINAGE IMPROVEMENTS · $95.00 per CUYD · qty 170.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
fire hydrantEACH1$8,000.00$8,000.00 to $8,000.00
Bids
  • 2024-10-09 · LaDOTD · E. KENTUCKY AVE: GOODWIN TO LA 33 · $8,000.00 per EACH · qty 6.0 · bid tab
flexible baseSQYD7$46.00$38.00 to $95.00
Bids
  • 2026-06-30 · LaDOTD · SPRING CREEK ROAD OVER WAFER CREEK · $46.00 per SQYD · qty 832.2 · bid tab
  • 2025-11-12 · LaDOTD · RUSTON DOWNTOWN REVITALIZATION PHASE IX · $38.00 per SQYD · qty 1510.1 · bid tab
  • 2025-11-12 · LaDOTD · RUSTON DOWNTOWN REVITALIZATION PHASE IX · $55.00 per SQYD · qty 1570.6 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $60.00 per SQYD · qty 35536.0 · bid tab
  • 2025-01-08 · LaDOTD · BONNER ST BRIDGE PED IMPR (RUSTON) · $95.00 per SQYD · qty 335.0 · bid tab
  • 2025-01-08 · LaDOTD · LA 818: BARNET SPRINGS & CREEK BRIDGES · $40.00 per SQYD · qty 5458.9 · bid tab
  • 2024-10-09 · LaDOTD · E. KENTUCKY AVE: GOODWIN TO LA 33 · $41.00 per SQYD · qty 25005.0 · bid tab
inlet headwallCUYD1$3,750.00$3,750.00 to $3,750.00
Bids
  • 2024-10-09 · LaDOTD · E. KENTUCKY AVE: GOODWIN TO LA 33 · $3,750.00 per CUYD · qty 42.0 · bid tab
lime cement stabilizationSQFT1$120.00$120.00 to $120.00
Bids
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $120.00 per SQFT · qty 16466.0 · bid tab
lime cement stabilizationSQYD9$6.00$2.00 to $12.35
Bids
  • 2026-06-30 · LaDOTD · SPRING CREEK ROAD OVER WAFER CREEK · $5.00 per SQYD · qty 832.2 · bid tab
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $9.75 per SQYD · qty 1359.3 · bid tab
  • 2026-03-11 · LaDOTD · LA 507: BIENVILLE P/L - LA 815 · $6.00 per SQYD · qty 16000.0 · bid tab
  • 2026-03-11 · LaDOTD · LA 507: BIENVILLE P/L - LA 815 · $12.35 per SQYD · qty 35056.3 · bid tab
  • 2025-08-13 · LaDOTD · LA 150: US 80 - LA 149 · $6.00 per SQYD · qty 7626.0 · bid tab
  • 2025-08-13 · LaDOTD · LA 150: US 80 - LA 149 · $12.25 per SQYD · qty 51877.3 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $2.00 per SQYD · qty 35536.0 · bid tab
  • 2025-01-08 · LaDOTD · LA 818: BARNET SPRINGS & CREEK BRIDGES · $2.25 per SQYD · qty 2732.0 · bid tab
  • 2024-10-09 · LaDOTD · E. KENTUCKY AVE: GOODWIN TO LA 33 · $6.00 per SQYD · qty 25005.0 · bid tab
lime cement stabilizationTON7$405.00$345.00 to $490.00
Bids
  • 2026-06-30 · LaDOTD · SPRING CREEK ROAD OVER WAFER CREEK · $415.00 per TON · qty 11.81 · bid tab
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $405.00 per TON · qty 18.3 · bid tab
  • 2026-03-11 · LaDOTD · LA 507: BIENVILLE P/L - LA 815 · $415.00 per TON · qty 151.2 · bid tab
  • 2025-08-13 · LaDOTD · LA 150: US 80 - LA 149 · $345.00 per TON · qty 96.1 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $360.00 per TON · qty 503.0 · bid tab
  • 2025-01-08 · LaDOTD · LA 818: BARNET SPRINGS & CREEK BRIDGES · $490.00 per TON · qty 38.72 · bid tab
  • 2024-10-09 · LaDOTD · E. KENTUCKY AVE: GOODWIN TO LA 33 · $365.00 per TON · qty 355.0 · bid tab
manholeEACH14$2,200.00$1,000.00 to $10,000.00
Bids
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $2,500.00 per EACH · qty 1.0 · bid tab
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $1,300.00 per EACH · qty 2.0 · bid tab
  • 2026-04-08 · LaDOTD · I-20 WB OFF RAMP: ADD TURN LANES @ LA 33 · $1,500.00 per EACH · qty 2.0 · bid tab
  • 2025-11-12 · LaDOTD · RUSTON DOWNTOWN REVITALIZATION PHASE IX · $6,000.00 per EACH · qty 2.0 · bid tab
  • 2025-08-13 · LaDOTD · LA 150: US 80 - LA 149 · $2,000.00 per EACH · qty 1.0 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $7,600.00 per EACH · qty 9.0 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $1,200.00 per EACH · qty 2.0 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $1,000.00 per EACH · qty 50.0 · bid tab
  • 2025-07-02 · LaDOTD · I-20: LA 544 OVERPASS REPLACEMENT · $1,200.00 per EACH · qty 42.0 · bid tab
  • 2025-01-08 · LaDOTD · BONNER ST BRIDGE PED IMPR (RUSTON) · $1,400.00 per EACH · qty 8.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
sidewalkEACH1$3,500.00$3,500.00 to $3,500.00
Bids
  • 2025-11-12 · LaDOTD · RUSTON DOWNTOWN REVITALIZATION PHASE IX · $3,500.00 per EACH · qty 1.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.