PadstakeGet the fee reports
Menu

Site-work prices, Jefferson County, LA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON42$204.50$1.00 to $1,100.00
Bids
  • 2026-09-09 · LaDOTD · PETERS ROAD BRIDGE & EXTENSION PHASE 2A · $400.00 per TON · qty 143.6 · bid tab
  • 2026-08-12 · LaDOTD · LA 49: JOE YENNI BLVD - I-10 · $220.00 per TON · qty 7183.8 · bid tab
  • 2026-08-12 · LaDOTD · LA 49: JOE YENNI BLVD - I-10 · $100.00 per TON · qty 1667.1 · bid tab
  • 2026-05-13 · LaDOTD · I-10: NEAR SPILLWAY BRIDGE OVERLAY · $220.00 per TON · qty 209.4 · bid tab
  • 2026-05-13 · LaDOTD · I-10: NEAR SPILLWAY BRIDGE OVERLAY · $220.00 per TON · qty 328.8 · bid tab
  • 2026-05-13 · LaDOTD · I-10: NEAR SPILLWAY BRIDGE OVERLAY · $220.00 per TON · qty 1022.5 · bid tab
  • 2026-02-11 · LaDOTD · LA 1: PLUM LN - CAMINADA BAY BRIDGE · $140.00 per TON · qty 11526.0 · bid tab
  • 2026-02-11 · LaDOTD · LA 1: PLUM LN - CAMINADA BAY BRIDGE · $270.00 per TON · qty 1461.9 · bid tab
  • 2026-02-11 · LaDOTD · LOYOLA DR: 31ST ST - W LOYOLA RESURFACE · $150.74 per TON · qty 3173.6 · bid tab
  • 2026-02-11 · LaDOTD · VETERANS MEMORIAL BLVD: LA 49 - ROOSEVELT · $175.00 per TON · qty 2506.1 · bid tab
(10 most recent of 42 shown; all in the Hubstake feed)
concrete pavementEACH1$250.00$250.00 to $250.00
Bids
  • 2025-02-12 · LaDOTD · RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR) · $250.00 per EACH · qty 4.0 · bid tab
concrete pavementSQYD10$121.50$27.64 to $160.00
Bids
  • 2026-04-08 · LaDOTD · EARHART AT DAKIN · $160.00 per SQYD · qty 690.0 · bid tab
  • 2026-02-11 · LaDOTD · LOYOLA DR: 31ST ST - W LOYOLA RESURFACE · $27.64 per SQYD · qty 62.0 · bid tab
  • 2025-11-12 · LaDOTD · JEFFERSON WB MISS RIVER MU PATH 3B + 3C · $150.00 per SQYD · qty 1015.7 · bid tab
  • 2025-10-15 · LaDOTD · US 61: CAUSEWAY - DAVID · $100.00 per SQYD · qty 44.4 · bid tab
  • 2025-09-10 · LaDOTD · SONIAT GREENWAY · $125.00 per SQYD · qty 66.7 · bid tab
  • 2025-05-14 · LaDOTD · ROOSEVELT BLVD: W NAPOLEON - W METAIRIE · $100.00 per SQYD · qty 670.4 · bid tab
  • 2025-05-14 · LaDOTD · ROOSEVELT BLVD: W NAPOLEON - W METAIRIE · $80.00 per SQYD · qty 16280.0 · bid tab
  • 2025-02-12 · LaDOTD · RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR) · $146.00 per SQYD · qty 1959.4 · bid tab
  • 2025-02-12 · LaDOTD · RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR) · $118.00 per SQYD · qty 7591.9 · bid tab
  • 2025-01-08 · LaDOTD · LA 466: 5TH STREET IMPROVEMENTS (GRETNA) · $155.00 per SQYD · qty 708.9 · bid tab
curb gutterLF1$50.00$50.00 to $50.00
Bids
  • 2025-02-12 · LaDOTD · VETERANS BLVD: DAVID DR - CLEARVIEW PKWY · $50.00 per LF · qty 230.0 · bid tab
curb gutterLNFT32$37.50$10.00 to $100.00
Bids
  • 2026-08-12 · LaDOTD · LA 49: JOE YENNI BLVD - I-10 · $60.00 per LNFT · qty 104.0 · bid tab
  • 2026-08-12 · LaDOTD · LA 49: JOE YENNI BLVD - I-10 · $75.00 per LNFT · qty 651.0 · bid tab
  • 2026-05-13 · LaDOTD · I-10: NEAR SPILLWAY BRIDGE OVERLAY · $65.00 per LNFT · qty 54.0 · bid tab
  • 2026-04-08 · LaDOTD · EARHART AT DAKIN · $20.00 per LNFT · qty 414.0 · bid tab
  • 2026-02-11 · LaDOTD · LA 1: PLUM LN - CAMINADA BAY BRIDGE · $35.00 per LNFT · qty 27.0 · bid tab
  • 2026-02-11 · LaDOTD · LOYOLA DR: 31ST ST - W LOYOLA RESURFACE · $67.48 per LNFT · qty 1374.6 · bid tab
  • 2026-02-11 · LaDOTD · VETERANS MEMORIAL BLVD: LA 49 - ROOSEVELT · $45.00 per LNFT · qty 26.2 · bid tab
  • 2026-01-14 · LaDOTD · US 90: AVONDALE PED IMPR · $30.00 per LNFT · qty 88.0 · bid tab
  • 2025-11-12 · LaDOTD · JEFFERSON WB MISS RIVER MU PATH 3B + 3C · $18.00 per LNFT · qty 94.0 · bid tab
  • 2025-10-15 · LaDOTD · US 61: CAUSEWAY - DAVID · $75.00 per LNFT · qty 114.0 · bid tab
(10 most recent of 32 shown; all in the Hubstake feed)
excavation embankmentCUYD26$77.50$25.00 to $500.00
Bids
  • 2026-09-09 · LaDOTD · PETERS ROAD BRIDGE & EXTENSION PHASE 2A · $27.50 per CUYD · qty 29523.0 · bid tab
  • 2026-08-12 · LaDOTD · LA 49: JOE YENNI BLVD - I-10 · $175.00 per CUYD · qty 9.0 · bid tab
  • 2026-05-13 · LaDOTD · I-10: NEAR SPILLWAY BRIDGE OVERLAY · $80.00 per CUYD · qty 80.0 · bid tab
  • 2026-04-08 · LaDOTD · EARHART AT DAKIN · $55.00 per CUYD · qty 170.0 · bid tab
  • 2026-02-11 · LaDOTD · LA 1: PLUM LN - CAMINADA BAY BRIDGE · $165.00 per CUYD · qty 165.0 · bid tab
  • 2026-02-11 · LaDOTD · LOYOLA DR: 31ST ST - W LOYOLA RESURFACE · $157.71 per CUYD · qty 35.0 · bid tab
  • 2026-02-11 · LaDOTD · VETERANS MEMORIAL BLVD: LA 49 - ROOSEVELT · $125.00 per CUYD · qty 28.0 · bid tab
  • 2026-01-14 · LaDOTD · US 90: AVONDALE PED IMPR · $70.00 per CUYD · qty 148.2 · bid tab
  • 2025-11-12 · LaDOTD · BROWN AVENUE MULTI-USE PATH · $97.00 per CUYD · qty 20.0 · bid tab
  • 2025-11-12 · LaDOTD · JEFFERSON WB MISS RIVER MU PATH 3B + 3C · $36.00 per CUYD · qty 1817.2 · bid tab
(10 most recent of 26 shown; all in the Hubstake feed)
fire hydrantEACH4$10,000.00$9,400.00 to $14,100.00
Bids
  • 2025-11-12 · LaDOTD · BROWN AVENUE MULTI-USE PATH · $14,100.00 per EACH · qty 4.0 · bid tab
  • 2025-03-12 · LaDOTD · KENNER DISCOVERY SCHOOL SIDEWALKS · $10,000.00 per EACH · qty 1.0 · bid tab
  • 2025-01-08 · LaDOTD · LA 466: 5TH STREET IMPROVEMENTS (GRETNA) · $9,400.00 per EACH · qty 10.0 · bid tab
  • 2024-05-08 · LaDOTD · LA 302: BAYOU BARATARIA MB REPL PHASE 2 · $10,000.00 per EACH · qty 5.0 · bid tab
flexible baseCUYD4$132.50$65.00 to $180.00
Bids
  • 2026-02-11 · LaDOTD · LA 1: PLUM LN - CAMINADA BAY BRIDGE · $180.00 per CUYD · qty 165.2 · bid tab
  • 2025-11-12 · LaDOTD · JEFFERSON WB MISS RIVER MU PATH 3B + 3C · $100.00 per CUYD · qty 507.9 · bid tab
  • 2025-09-10 · LaDOTD · SONIAT GREENWAY · $65.00 per CUYD · qty 3580.1 · bid tab
  • 2025-01-08 · LaDOTD · LA 466: 5TH STREET IMPROVEMENTS (GRETNA) · $165.00 per CUYD · qty 3599.4 · bid tab
flexible baseSQYD8$41.00$19.00 to $122.00
Bids
  • 2026-04-08 · LaDOTD · EARHART AT DAKIN · $30.00 per SQYD · qty 736.0 · bid tab
  • 2025-11-12 · LaDOTD · BROWN AVENUE MULTI-USE PATH · $33.00 per SQYD · qty 2767.56 · bid tab
  • 2025-09-10 · LaDOTD · SONIAT GREENWAY · $19.00 per SQYD · qty 5042.6 · bid tab
  • 2025-05-14 · LaDOTD · ROOSEVELT BLVD: W NAPOLEON - W METAIRIE · $45.00 per SQYD · qty 18600.2 · bid tab
  • 2025-02-12 · LaDOTD · RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR) · $37.00 per SQYD · qty 10132.3 · bid tab
  • 2024-09-18 · LaDOTD · BONNABEL BLVD: METAIRIE RD - I-10 · $122.00 per SQYD · qty 232.6 · bid tab
  • 2024-05-08 · LaDOTD · LA 302: BAYOU BARATARIA MB REPL PHASE 2 · $50.00 per SQYD · qty 10082.7 · bid tab
  • 2024-03-13 · LaDOTD · NINE MILE POINT ROAD: US 90 - LA 18 · $72.50 per SQYD · qty 79.0 · bid tab
inlet headwallCUYD2$7,500.00$7,500.00 to $7,500.00
Bids
  • 2024-05-08 · LaDOTD · LA 302: BAYOU BARATARIA MB REPL PHASE 2 · $7,500.00 per CUYD · qty 3.93 · bid tab
  • 2024-05-08 · LaDOTD · LA 302: BAYOU BARATARIA MB REPL PHASE 2 · $7,500.00 per CUYD · qty 4.93 · bid tab
inlet headwallEACH3$12,500.00$7,500.00 to $200,000.00
Bids
  • 2026-09-09 · LaDOTD · PETERS ROAD BRIDGE & EXTENSION PHASE 2A · $200,000.00 per EACH · qty 2.0 · bid tab
  • 2026-04-08 · LaDOTD · EARHART AT DAKIN · $12,500.00 per EACH · qty 2.0 · bid tab
  • 2026-04-08 · LaDOTD · EARHART AT DAKIN · $7,500.00 per EACH · qty 1.0 · bid tab
manholeEACH26$1,875.00$350.00 to $14,000.00
Bids
  • 2026-09-09 · LaDOTD · PETERS ROAD BRIDGE & EXTENSION PHASE 2A · $14,000.00 per EACH · qty 2.0 · bid tab
  • 2026-08-12 · LaDOTD · LA 49: JOE YENNI BLVD - I-10 · $1,250.00 per EACH · qty 64.0 · bid tab
  • 2026-08-12 · LaDOTD · LA 49: JOE YENNI BLVD - I-10 · $3,250.00 per EACH · qty 11.0 · bid tab
  • 2026-08-12 · LaDOTD · LA 49: JOE YENNI BLVD - I-10 · $1,250.00 per EACH · qty 4.0 · bid tab
  • 2026-08-12 · LaDOTD · LA 49: JOE YENNI BLVD - I-10 · $2,000.00 per EACH · qty 6.0 · bid tab
  • 2026-04-08 · LaDOTD · EARHART AT DAKIN · $8,900.00 per EACH · qty 1.0 · bid tab
  • 2026-02-11 · LaDOTD · LOYOLA DR: 31ST ST - W LOYOLA RESURFACE · $1,721.32 per EACH · qty 1.0 · bid tab
  • 2026-02-11 · LaDOTD · VETERANS MEMORIAL BLVD: LA 49 - ROOSEVELT · $1,700.00 per EACH · qty 1.0 · bid tab
  • 2026-01-14 · LaDOTD · US 90: AVONDALE PED IMPR · $1,400.00 per EACH · qty 1.0 · bid tab
  • 2026-01-14 · LaDOTD · US 90: AVONDALE PED IMPR · $1,500.00 per EACH · qty 4.0 · bid tab
(10 most recent of 26 shown; all in the Hubstake feed)
sewer serviceEACH4$1,800.00$400.00 to $5,000.00
Bids
  • 2025-02-12 · LaDOTD · RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR) · $1,800.00 per EACH · qty 15.0 · bid tab
  • 2025-02-12 · LaDOTD · RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR) · $1,800.00 per EACH · qty 57.0 · bid tab
  • 2025-02-12 · LaDOTD · RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR) · $5,000.00 per EACH · qty 3.0 · bid tab
  • 2025-02-12 · LaDOTD · RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR) · $400.00 per EACH · qty 75.0 · bid tab
sewer serviceLNFT1$115.00$115.00 to $115.00
Bids
  • 2025-02-12 · LaDOTD · RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR) · $115.00 per LNFT · qty 1874.0 · bid tab
sidewalkEACH2$38,525.00$450.00 to $76,600.00
Bids
  • 2026-02-11 · LaDOTD · VETERANS MEMORIAL BLVD: LA 49 - ROOSEVELT · $450.00 per EACH · qty 56.0 · bid tab
  • 2025-09-10 · LaDOTD · SONIAT GREENWAY · $76,600.00 per EACH · qty 2.0 · bid tab
water main 14-inchLF1$250.00$250.00 to $250.00
Bids
  • 2024-05-08 · LaDOTD · LA 302: BAYOU BARATARIA MB REPL PHASE 2 · $250.00 per LF · qty 50.0 · bid tab
water main 16-inchLF1$150.00$150.00 to $150.00
Bids
  • 2024-05-08 · LaDOTD · LA 302: BAYOU BARATARIA MB REPL PHASE 2 · $150.00 per LF · qty 2416.0 · bid tab
water serviceEACH1$100.00$100.00 to $100.00
Bids
  • 2025-05-14 · LaDOTD · ROOSEVELT BLVD: W NAPOLEON - W METAIRIE · $100.00 per EACH · qty 51.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.