PadstakeGet the fee reports
Menu

Site-work prices, East Feliciana County, LA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON8$210.50$50.00 to $385.00
Bids
  • 2025-11-12 · LaDOTD · LA 955: BRIDGES NEAR CLINTON · $175.00 per TON · qty 1189.9 · bid tab
  • 2025-11-12 · LaDOTD · LA 955: BRIDGES NEAR CLINTON · $307.00 per TON · qty 275.9 · bid tab
  • 2025-02-12 · LaDOTD · LA 422: BRIDGE OVER UNNAMED STREAM · $220.00 per TON · qty 358.3 · bid tab
  • 2025-02-12 · LaDOTD · LA 422: BRIDGE OVER UNNAMED STREAM · $385.00 per TON · qty 56.4 · bid tab
  • 2024-12-11 · LaDOTD · LA 10: LA 67 - SMITH RD · $50.00 per TON · qty 1260.5 · bid tab
  • 2024-12-11 · LaDOTD · LA 10: LA 67 - SMITH RD · $112.50 per TON · qty 26782.7 · bid tab
  • 2024-01-10 · LaDOTD · LA 63 BRIDGES NEAR BLUFF CREEK · $304.72 per TON · qty 704.0 · bid tab
  • 2024-01-10 · LaDOTD · LA 63 BRIDGES NEAR BLUFF CREEK · $201.00 per TON · qty 3166.4 · bid tab
excavation embankmentCUYD2$69.12$21.24 to $117.00
Bids
  • 2024-12-11 · LaDOTD · LA 10: LA 67 - SMITH RD · $117.00 per CUYD · qty 546.0 · bid tab
  • 2024-01-10 · LaDOTD · LA 63 BRIDGES NEAR BLUFF CREEK · $21.24 per CUYD · qty 18693.0 · bid tab
inlet headwallEACH1$70,400.00$70,400.00 to $70,400.00
Bids
  • 2025-11-12 · LaDOTD · LA 955: BRIDGES NEAR CLINTON · $70,400.00 per EACH · qty 2.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.