| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 26 | $200.00 | $145.00 to $575.00 | Bids- 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $219.50 per TON · qty 828.0 · bid tab
- 2026-08-12 · LaDOTD · LA 173: PINE ST TO HARTMAN ST · $179.35 per TON · qty 118.6 · bid tab
- 2026-08-12 · LaDOTD · LA 173: PINE ST TO HARTMAN ST · $176.75 per TON · qty 1998.9 · bid tab
- 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $325.00 per TON · qty 408.1 · bid tab
- 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $325.00 per TON · qty 408.1 · bid tab
- 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $375.00 per TON · qty 611.6 · bid tab
- 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $575.00 per TON · qty 48.5 · bid tab
- 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $575.00 per TON · qty 114.3 · bid tab
- 2025-10-15 · LaDOTD · LA 525: SPRING RIDGE TO US 171 · $153.00 per TON · qty 1518.8 · bid tab
- 2025-10-15 · LaDOTD · LA 525: SPRING RIDGE TO US 171 · $145.50 per TON · qty 37590.8 · bid tab
(10 most recent of 26 shown; all in the Hubstake feed) |
| concrete pavement | SQYD | 3 | $99.00 | $99.00 to $200.00 | Bids- 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $200.00 per SQYD · qty 975.4 · bid tab
- 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $99.00 per SQYD · qty 20339.7 · bid tab
- 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $99.00 per SQYD · qty 4134.6 · bid tab
|
| curb gutter | LNFT | 9 | $20.00 | $12.00 to $120.00 | Bids- 2026-08-12 · LaDOTD · LA 173: PINE ST TO HARTMAN ST · $100.00 per LNFT · qty 6341.0 · bid tab
- 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $42.00 per LNFT · qty 1476.6 · bid tab
- 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $12.00 per LNFT · qty 6435.3 · bid tab
- 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $75.00 per LNFT · qty 11.0 · bid tab
- 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $12.00 per LNFT · qty 1336.1 · bid tab
- 2025-10-15 · LaDOTD · LA 525: SPRING RIDGE TO US 171 · $20.00 per LNFT · qty 42.0 · bid tab
- 2025-10-02 · LaDOTD · LA 511: Jewella Ave to US 171 · $19.50 per LNFT · qty 2889.7 · bid tab
- 2025-04-09 · LaDOTD · US 171: LA 3132 - US 80 · $15.00 per LNFT · qty 3745.0 · bid tab
- 2024-01-10 · LaDOTD · LA 173: LEFT TURN LANES AT RUSSELL ROAD · $120.00 per LNFT · qty 407.3 · bid tab
|
| excavation embankment | CUYD | 10 | $42.50 | $25.00 to $135.00 | Bids- 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $40.00 per CUYD · qty 1592.0 · bid tab
- 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $30.00 per CUYD · qty 1592.0 · bid tab
- 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $120.00 per CUYD · qty 153.0 · bid tab
- 2025-10-15 · LaDOTD · LA 525: SPRING RIDGE TO US 171 · $25.00 per CUYD · qty 1508.0 · bid tab
- 2025-04-09 · LaDOTD · LA 530: LA 538 TO I-49 · $30.00 per CUYD · qty 2245.0 · bid tab
- 2025-04-09 · LaDOTD · US 171: LA 3132 - US 80 · $30.00 per CUYD · qty 923.8 · bid tab
- 2025-02-12 · LaDOTD · I-49: SB EXIT RAMP AT SOUTHERN LOOP · $55.00 per CUYD · qty 390.0 · bid tab
- 2024-07-10 · LaDOTD · LA 3049: BARTON DRIVE - WHITFIELD CIRCLE · $45.00 per CUYD · qty 3853.0 · bid tab
- 2024-01-10 · LaDOTD · LA 173: LEFT TURN LANES AT RUSSELL ROAD · $50.00 per CUYD · qty 987.0 · bid tab
- 2023-12-13 · LaDOTD · LA 3049: COWHIDE BAYOU TO LA 530 · $135.00 per CUYD · qty 204.0 · bid tab
|
| flexible base | CUYD | 1 | $190.00 | $190.00 to $190.00 | Bids- 2025-05-14 · LaDOTD · CRAWFORD ROAD OVER TIGER BRANCH · $190.00 per CUYD · qty 215.8 · bid tab
|
| flexible base | SQYD | 5 | $66.00 | $32.00 to $150.00 | Bids- 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $125.00 per SQYD · qty 751.8 · bid tab
- 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $150.00 per SQYD · qty 751.8 · bid tab
- 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $32.00 per SQYD · qty 4442.3 · bid tab
- 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $32.00 per SQYD · qty 21493.0 · bid tab
- 2025-02-12 · LaDOTD · I-49: SB EXIT RAMP AT SOUTHERN LOOP · $66.00 per SQYD · qty 2561.9 · bid tab
|
| lime cement stabilization | SQYD | 5 | $27.50 | $16.80 to $55.00 | Bids- 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $25.00 per SQYD · qty 752.0 · bid tab
- 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $45.00 per SQYD · qty 752.0 · bid tab
- 2025-04-09 · LaDOTD · LA 530: LA 538 TO I-49 · $16.80 per SQYD · qty 39274.0 · bid tab
- 2025-02-12 · LaDOTD · I-49: SB EXIT RAMP AT SOUTHERN LOOP · $27.50 per SQYD · qty 2562.0 · bid tab
- 2024-08-28 · LaDOTD · I-20: DECEL LANE EXT EX 8 · $55.00 per SQYD · qty 995.0 · bid tab
|
| lime cement stabilization | TON | 4 | $475.00 | $80.00 to $825.00 | Bids- 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $650.00 per TON · qty 10.66 · bid tab
- 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $80.00 per TON · qty 10.66 · bid tab
- 2025-02-12 · LaDOTD · I-49: SB EXIT RAMP AT SOUTHERN LOOP · $825.00 per TON · qty 36.3 · bid tab
- 2024-08-28 · LaDOTD · I-20: DECEL LANE EXT EX 8 · $300.00 per TON · qty 14.07 · bid tab
|
| manhole | EACH | 9 | $1,953.00 | $1,480.00 to $6,997.00 | Bids- 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $2,100.00 per EACH · qty 6.0 · bid tab
- 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $3,000.00 per EACH · qty 6.0 · bid tab
- 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $1,953.00 per EACH · qty 11.0 · bid tab
- 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $1,860.00 per EACH · qty 3.0 · bid tab
- 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $6,997.00 per EACH · qty 1.0 · bid tab
- 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $2,772.00 per EACH · qty 1.0 · bid tab
- 2024-11-13 · LaDOTD · LA 1: SOUTHFIELD ROAD TO STONER AVENUE · $1,550.00 per EACH · qty 2.0 · bid tab
- 2024-08-28 · LaDOTD · I-20: DECEL LANE EXT EX 8 · $1,480.00 per EACH · qty 3.0 · bid tab
- 2024-08-28 · LaDOTD · I-20: DECEL LANE EXT EX 8 · $1,535.00 per EACH · qty 2.0 · bid tab
|