Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON14$105.72$8.98 to $121.75
Bids
  • 2026-09-03 · KYTC · 26-2025 · $105.00 per TON · qty 216.0 · bid tab
  • 2026-09-03 · KYTC · 26-2025 · $105.00 per TON · qty 2395.0 · bid tab
  • 2026-09-03 · KYTC · 26-2025 · $105.00 per TON · qty 275.0 · bid tab
  • 2026-09-03 · KYTC · 26-2046 · $97.24 per TON · qty 16100.0 · bid tab
  • 2026-09-03 · KYTC · 26-2046 · $100.82 per TON · qty 1748.0 · bid tab
  • 2026-05-21 · KYTC · 26-3014 · $8.98 per TON · qty 750.0 · bid tab
  • 2026-05-21 · KYTC · 26-3014 · $112.67 per TON · qty 3420.0 · bid tab
  • 2026-03-26 · KYTC · 26-2076 · $118.80 per TON · qty 303.0 · bid tab
  • 2026-03-26 · KYTC · 26-2076 · $118.24 per TON · qty 2250.0 · bid tab
  • 2024-09-26 · KYTC · 24-2281 · $110.40 per TON · qty 224.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
curb gutterLF2$50.00$48.00 to $52.00
Bids
  • 2026-05-21 · KYTC · 26-3014 · $52.00 per LF · qty 59.0 · bid tab
  • 2026-05-21 · KYTC · 26-3014 · $48.00 per LF · qty 215.0 · bid tab
excavation embankmentCUYD3$75.00$31.00 to $181.17
Bids
  • 2024-02-22 · KYTC · 24-1303 · $31.00 per CUYD · qty 182544.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $181.17 per CUYD · qty 766.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $75.00 per CUYD · qty 7000.0 · bid tab
fire hydrantEACH1$21,000.00$21,000.00 to $21,000.00
Bids
  • 2024-02-22 · KYTC · 24-1303 · $21,000.00 per EACH · qty 3.0 · bid tab
flexible baseTON1$41.00$41.00 to $41.00
Bids
  • 2024-02-22 · KYTC · 24-1303 · $41.00 per TON · qty 96954.0 · bid tab
inlet headwallEACH19$5,500.00$600.00 to $40,000.00
Bids
  • 2024-02-22 · KYTC · 24-1303 · $1,700.00 per EACH · qty 21.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $5,500.00 per EACH · qty 2.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $12,000.00 per EACH · qty 2.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $40,000.00 per EACH · qty 2.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $9,000.00 per EACH · qty 2.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $22,000.00 per EACH · qty 2.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $20,000.00 per EACH · qty 2.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $2,000.00 per EACH · qty 16.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $8,500.00 per EACH · qty 2.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $1,500.00 per EACH · qty 23.0 · bid tab
(10 most recent of 19 shown; all in the Hubstake feed)
lime cement stabilizationSQYD1$4.25$4.25 to $4.25
Bids
  • 2024-02-22 · KYTC · 24-1303 · $4.25 per SQYD · qty 65605.0 · bid tab
manholeEACH2$5,000.00$5,000.00 to $5,000.00
Bids
  • 2024-02-22 · KYTC · 24-1303 · $5,000.00 per EACH · qty 2.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $5,000.00 per EACH · qty 1.0 · bid tab
storm pipe 15-inchLF2$132.50$130.00 to $135.00
Bids
  • 2024-02-22 · KYTC · 24-1303 · $135.00 per LF · qty 97.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $130.00 per LF · qty 297.0 · bid tab
storm pipe 18-inchLF2$172.50$150.00 to $195.00
Bids
  • 2024-02-22 · KYTC · 24-1303 · $150.00 per LF · qty 335.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $195.00 per LF · qty 1568.0 · bid tab
storm pipe 24-inchLF2$195.00$190.00 to $200.00
Bids
  • 2024-02-22 · KYTC · 24-1303 · $200.00 per LF · qty 301.0 · bid tab
  • 2024-02-22 · KYTC · 24-1303 · $190.00 per LF · qty 72.0 · bid tab
storm pipe 30-inchLF1$305.00$305.00 to $305.00
Bids
  • 2024-02-22 · KYTC · 24-1303 · $305.00 per LF · qty 156.0 · bid tab
storm pipe 36-inchLF1$355.00$355.00 to $355.00
Bids
  • 2024-02-22 · KYTC · 24-1303 · $355.00 per LF · qty 243.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.