PadstakeGet the fee reports
Menu

Site-work prices, Perry County, KY

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON53$135.15$114.55 to $341.85
Bids
  • 2026-09-03 · KYTC · 26-2108 · $150.55 per TON · qty 1110.0 · bid tab
  • 2026-09-03 · KYTC · 26-2108 · $150.55 per TON · qty 152.0 · bid tab
  • 2026-05-21 · KYTC · 26-1511 · $196.15 per TON · qty 1650.0 · bid tab
  • 2026-05-21 · KYTC · 26-1511 · $229.80 per TON · qty 475.0 · bid tab
  • 2026-05-21 · KYTC · 26-1511 · $218.10 per TON · qty 120.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $141.85 per TON · qty 10171.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $178.50 per TON · qty 921.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $152.40 per TON · qty 1949.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $166.85 per TON · qty 2883.0 · bid tab
  • 2025-11-20 · KYTC · 25-1125 · $273.75 per TON · qty 330.0 · bid tab
(10 most recent of 53 shown; all in the Hubstake feed)
curb gutterLF7$47.90$18.59 to $100.00
Bids
  • 2026-01-29 · KYTC · 26-1103 · $42.14 per LF · qty 1272.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $47.90 per LF · qty 298.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $36.95 per LF · qty 210.0 · bid tab
  • 2025-11-20 · KYTC · 25-1125 · $100.00 per LF · qty 98.0 · bid tab
  • 2024-10-24 · KYTC · 24-2353 · $80.00 per LF · qty 44.0 · bid tab
  • 2024-08-22 · KYTC · 24-2099 · $80.00 per LF · qty 44.0 · bid tab
  • 2024-05-23 · KYTC · 24-1311 · $18.59 per LF · qty 32379.0 · bid tab
excavation embankmentCUYD7$15.00$2.00 to $47.00
Bids
  • 2026-05-21 · KYTC · 26-1511 · $15.00 per CUYD · qty 87566.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $4.75 per CUYD · qty 1603406.0 · bid tab
  • 2024-10-24 · KYTC · 24-2353 · $47.00 per CUYD · qty 474.0 · bid tab
  • 2024-08-22 · KYTC · 24-1109 · $19.00 per CUYD · qty 5326.0 · bid tab
  • 2024-08-22 · KYTC · 24-2099 · $44.11 per CUYD · qty 474.0 · bid tab
  • 2024-05-23 · KYTC · 24-1311 · $6.75 per CUYD · qty 251024.0 · bid tab
  • 2024-05-23 · KYTC · 24-1311 · $2.00 per CUYD · qty 80000.0 · bid tab
fire hydrantEACH1$9,000.00$9,000.00 to $9,000.00
Bids
  • 2026-01-29 · KYTC · 26-1103 · $9,000.00 per EACH · qty 3.0 · bid tab
flexible baseTON7$56.23$47.35 to $66.00
Bids
  • 2026-05-21 · KYTC · 26-1511 · $56.76 per TON · qty 1875.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $47.35 per TON · qty 18001.0 · bid tab
  • 2025-11-20 · KYTC · 25-1125 · $66.00 per TON · qty 170.0 · bid tab
  • 2024-10-24 · KYTC · 24-2353 · $56.23 per TON · qty 507.0 · bid tab
  • 2024-08-22 · KYTC · 24-1109 · $48.00 per TON · qty 300.0 · bid tab
  • 2024-08-22 · KYTC · 24-2099 · $56.23 per TON · qty 507.0 · bid tab
  • 2024-05-23 · KYTC · 24-1311 · $47.50 per TON · qty 18651.0 · bid tab
inlet headwallEACH32$2,550.00$750.00 to $7,600.00
Bids
  • 2026-05-21 · KYTC · 26-1511 · $2,500.00 per EACH · qty 1.0 · bid tab
  • 2026-05-21 · KYTC · 26-1511 · $2,500.00 per EACH · qty 2.0 · bid tab
  • 2026-05-21 · KYTC · 26-1511 · $1,700.00 per EACH · qty 1.0 · bid tab
  • 2026-05-21 · KYTC · 26-1511 · $1,600.00 per EACH · qty 3.0 · bid tab
  • 2026-05-21 · KYTC · 26-1511 · $5,000.00 per EACH · qty 1.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $2,600.00 per EACH · qty 6.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $1,550.00 per EACH · qty 4.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $1,375.00 per EACH · qty 6.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $2,400.00 per EACH · qty 2.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $750.00 per EACH · qty 5.0 · bid tab
(10 most recent of 32 shown; all in the Hubstake feed)
inlet headwallLF1$525.00$525.00 to $525.00
Bids
  • 2025-11-20 · KYTC · 25-1125 · $525.00 per LF · qty 37.17 · bid tab
manholeEACH3$3,500.00$1,492.00 to $6,400.00
Bids
  • 2026-01-29 · KYTC · 26-1103 · $3,500.00 per EACH · qty 4.0 · bid tab
  • 2025-11-20 · KYTC · 25-1125 · $6,400.00 per EACH · qty 2.0 · bid tab
  • 2024-05-23 · KYTC · 24-1311 · $1,492.00 per EACH · qty 1.0 · bid tab
storm pipe 12-inchLF1$63.00$63.00 to $63.00
Bids
  • 2024-05-23 · KYTC · 24-1311 · $63.00 per LF · qty 228.0 · bid tab
storm pipe 18-inchLF7$228.02$70.00 to $255.00
Bids
  • 2026-05-21 · KYTC · 26-1511 · $110.00 per LF · qty 144.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $118.91 per LF · qty 352.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $228.02 per LF · qty 54.0 · bid tab
  • 2025-11-20 · KYTC · 25-1125 · $250.00 per LF · qty 129.0 · bid tab
  • 2024-10-24 · KYTC · 24-2353 · $255.00 per LF · qty 109.0 · bid tab
  • 2024-08-22 · KYTC · 24-2099 · $235.00 per LF · qty 109.0 · bid tab
  • 2024-05-23 · KYTC · 24-1311 · $70.00 per LF · qty 12955.0 · bid tab
storm pipe 24-inchLF3$135.00$85.00 to $152.61
Bids
  • 2026-05-21 · KYTC · 26-1511 · $135.00 per LF · qty 73.0 · bid tab
  • 2026-01-29 · KYTC · 26-1103 · $152.61 per LF · qty 379.0 · bid tab
  • 2024-05-23 · KYTC · 24-1311 · $85.00 per LF · qty 423.0 · bid tab
storm pipe 30-inchLF3$199.76$130.00 to $260.00
Bids
  • 2026-01-29 · KYTC · 26-1103 · $199.76 per LF · qty 272.0 · bid tab
  • 2025-11-20 · KYTC · 25-1125 · $260.00 per LF · qty 298.0 · bid tab
  • 2024-05-23 · KYTC · 24-1311 · $130.00 per LF · qty 101.0 · bid tab
storm pipe 36-inchLF1$242.78$242.78 to $242.78
Bids
  • 2026-01-29 · KYTC · 26-1103 · $242.78 per LF · qty 862.0 · bid tab
storm pipe 42-inchLF1$208.04$208.04 to $208.04
Bids
  • 2026-01-29 · KYTC · 26-1103 · $208.04 per LF · qty 86.0 · bid tab
storm pipe 48-inchLF2$376.51$236.00 to $517.02
Bids
  • 2026-01-29 · KYTC · 26-1103 · $517.02 per LF · qty 360.0 · bid tab
  • 2024-05-23 · KYTC · 24-1311 · $236.00 per LF · qty 100.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.