Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON1$134.46$134.46 to $134.46
Bids
  • 2023-11-15 · KDOT · 523112424 · $134.46 per TON · qty 3701.0 · bid tab
concrete pavementSQYD2$350.00$300.00 to $400.00
Bids
  • 2025-10-22 · KDOT · 525106414 · $400.00 per SQYD · qty 130.0 · bid tab
  • 2023-11-15 · KDOT · 523112424 · $300.00 per SQYD · qty 119.0 · bid tab
excavation embankmentCUYD7$13.44$1.00 to $35.00
Bids
  • 2026-07-22 · KDOT · 526072454 · $35.00 per CUYD · qty 433.0 · bid tab
  • 2026-07-22 · KDOT · 526072454 · $2.35 per CUYD · qty 1285.0 · bid tab
  • 2026-07-22 · KDOT · 526072454 · $24.00 per CUYD · qty 1280.0 · bid tab
  • 2023-11-15 · KDOT · 523112424 · $13.44 per CUYD · qty 15121.0 · bid tab
  • 2023-11-15 · KDOT · 523112424 · $2.25 per CUYD · qty 3227.0 · bid tab
  • 2023-11-15 · KDOT · 523112424 · $1.00 per CUYD · qty 11944.0 · bid tab
  • 2023-11-15 · KDOT · 523112424 · $13.44 per CUYD · qty 4731.0 · bid tab
flexible baseMGAL1$40.00$40.00 to $40.00
Bids
  • 2023-11-15 · KDOT · 523112424 · $40.00 per MGAL · qty 1.0 · bid tab
flexible baseSQYD1$9.20$9.20 to $9.20
Bids
  • 2023-11-15 · KDOT · 523112424 · $9.20 per SQYD · qty 8231.0 · bid tab
inlet headwallCUYD1$155.00$155.00 to $155.00
Bids
  • 2023-11-15 · KDOT · 523112424 · $155.00 per CUYD · qty 38.0 · bid tab
inlet headwallEACH1$4,000.00$4,000.00 to $4,000.00
Bids
  • 2023-11-15 · KDOT · 523112424 · $4,000.00 per EACH · qty 4.0 · bid tab
lime cement stabilizationCUYD3$40.00$40.00 to $150.00
Bids
  • 2026-07-22 · KDOT · 526072454 · $40.00 per CUYD · qty 1.0 · bid tab
  • 2023-11-15 · KDOT · 523112424 · $150.00 per CUYD · qty 6.0 · bid tab
  • 2023-11-15 · KDOT · 523112424 · $40.00 per CUYD · qty 1.0 · bid tab
lime cement stabilizationEACH3$5.00$0.10 to $200.00
Bids
  • 2025-10-22 · KDOT · 525106414 · $5.00 per EACH · qty 10.0 · bid tab
  • 2023-11-15 · KDOT · 523112424 · $200.00 per EACH · qty 10.0 · bid tab
  • 2023-11-15 · KDOT · 523112424 · $0.10 per EACH · qty 15.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.