PadstakeGet the fee reports
Menu

Site-work prices, Huntington, Wells County, IN

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON9$115.00$71.00 to $260.29
Bids
  • 2025-08-06 · INDOT · B-43797-A · $140.00 per TON · qty 38.0 · bid tab
  • 2025-08-06 · INDOT · B-43797-A · $96.00 per TON · qty 90.0 · bid tab
  • 2025-08-06 · INDOT · B-43797-A · $115.00 per TON · qty 310.0 · bid tab
  • 2025-08-06 · INDOT · B-43797-A · $156.00 per TON · qty 32.0 · bid tab
  • 2025-08-06 · INDOT · B-43797-A · $100.00 per TON · qty 76.0 · bid tab
  • 2024-10-09 · INDOT · R-42384-A · $71.00 per TON · qty 21519.0 · bid tab
  • 2024-10-09 · INDOT · R-42384-A · $165.00 per TON · qty 941.0 · bid tab
  • 2024-10-09 · INDOT · R-42384-A · $260.29 per TON · qty 26.0 · bid tab
  • 2024-10-09 · INDOT · R-42384-A · $75.00 per TON · qty 16278.0 · bid tab
curb gutterEACH2$3,000.00$2,850.00 to $3,150.00
Bids
  • 2025-08-06 · INDOT · B-43797-A · $2,850.00 per EACH · qty 7.0 · bid tab
  • 2024-10-09 · INDOT · R-42384-A · $3,150.00 per EACH · qty 20.0 · bid tab
excavation embankmentLS2$215,962.50$99,000.00 to $332,925.00
Bids
  • 2025-08-06 · INDOT · B-43797-A · $99,000.00 per LS · qty 1.0 · bid tab
  • 2024-10-09 · INDOT · R-42384-A · $332,925.00 per LS · qty 1.0 · bid tab
lime cement stabilizationSYS3$42.00$10.00 to $105.00
Bids
  • 2025-08-06 · INDOT · B-43797-A · $42.00 per SYS · qty 1109.0 · bid tab
  • 2024-10-09 · INDOT · R-42384-A · $10.00 per SYS · qty 5590.0 · bid tab
  • 2024-10-09 · INDOT · R-42384-A · $105.00 per SYS · qty 34.0 · bid tab
manholeEACH1$5,500.00$5,500.00 to $5,500.00
Bids
  • 2024-10-09 · INDOT · R-42384-A · $5,500.00 per EACH · qty 3.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.