PadstakeGet the fee reports
Menu

Site-work prices, Daviess, Martin, Pike County, IN

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON6$182.00$116.50 to $295.00
Bids
  • 2024-04-10 · INDOT · B-45053-A · $171.00 per TON · qty 248.0 · bid tab
  • 2024-04-10 · INDOT · B-45053-A · $295.00 per TON · qty 191.0 · bid tab
  • 2024-04-10 · INDOT · B-45053-A · $116.50 per TON · qty 1396.0 · bid tab
  • 2024-04-10 · INDOT · B-45053-A · $233.00 per TON · qty 26.0 · bid tab
  • 2024-04-10 · INDOT · B-45053-A · $193.00 per TON · qty 318.0 · bid tab
  • 2024-04-10 · INDOT · B-45053-A · $163.00 per TON · qty 346.0 · bid tab
curb gutterEACH1$3,500.00$3,500.00 to $3,500.00
Bids
  • 2024-04-10 · INDOT · B-45053-A · $3,500.00 per EACH · qty 3.0 · bid tab
curb gutterLFT1$325.00$325.00 to $325.00
Bids
  • 2024-04-10 · INDOT · B-45053-A · $325.00 per LFT · qty 138.0 · bid tab
excavation embankmentLS1$549,402.00$549,402.00 to $549,402.00
Bids
  • 2024-04-10 · INDOT · B-45053-A · $549,402.00 per LS · qty 1.0 · bid tab
inlet headwallEACH1$5,400.00$5,400.00 to $5,400.00
Bids
  • 2024-04-10 · INDOT · B-45053-A · $5,400.00 per EACH · qty 4.0 · bid tab
lime cement stabilizationSYS1$40.00$40.00 to $40.00
Bids
  • 2024-04-10 · INDOT · B-45053-A · $40.00 per SYS · qty 12797.0 · bid tab
manholeEACH1$6,000.00$6,000.00 to $6,000.00
Bids
  • 2024-04-10 · INDOT · B-45053-A · $6,000.00 per EACH · qty 2.0 · bid tab
sidewalkEACH1$2,500.00$2,500.00 to $2,500.00
Bids
  • 2024-04-10 · INDOT · B-45053-A · $2,500.00 per EACH · qty 1.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.