Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON5$179.22$96.64 to $202.82
Bids
  • 2026-01-14 · INDOT · R-46022-A · $190.00 per TON · qty 402.0 · bid tab
  • 2025-12-10 · INDOT · T-44353-A · $179.22 per TON · qty 111.0 · bid tab
  • 2025-12-10 · INDOT · T-44353-A · $140.18 per TON · qty 935.0 · bid tab
  • 2025-12-10 · INDOT · T-44353-A · $202.82 per TON · qty 569.0 · bid tab
  • 2025-12-10 · INDOT · T-44353-A · $96.64 per TON · qty 2991.0 · bid tab
excavation embankmentLS3$82,000.00$42,013.00 to $113,225.39
Bids
  • 2026-01-14 · INDOT · R-46022-A · $82,000.00 per LS · qty 1.0 · bid tab
  • 2025-12-10 · INDOT · T-44353-A · $113,225.39 per LS · qty 1.0 · bid tab
  • 2025-02-12 · INDOT · B-42955-A · $42,013.00 per LS · qty 1.0 · bid tab
inlet headwallEACH5$4,662.02$3,800.49 to $5,276.22
Bids
  • 2025-12-10 · INDOT · T-44353-A · $3,800.49 per EACH · qty 23.0 · bid tab
  • 2025-12-10 · INDOT · T-44353-A · $4,873.11 per EACH · qty 7.0 · bid tab
  • 2025-12-10 · INDOT · T-44353-A · $4,662.02 per EACH · qty 1.0 · bid tab
  • 2025-12-10 · INDOT · T-44353-A · $3,808.87 per EACH · qty 3.0 · bid tab
  • 2025-12-10 · INDOT · T-44353-A · $5,276.22 per EACH · qty 1.0 · bid tab
lime cement stabilizationSYS1$43.09$43.09 to $43.09
Bids
  • 2025-12-10 · INDOT · T-44353-A · $43.09 per SYS · qty 8022.0 · bid tab
manholeEACH1$5,495.40$5,495.40 to $5,495.40
Bids
  • 2025-12-10 · INDOT · T-44353-A · $5,495.40 per EACH · qty 1.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.