PadstakeGet the fee reports
Menu

Site-work prices, Clark County, IN

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON20$117.00$80.00 to $500.00
Bids
  • 2026-01-14 · INDOT · T-43756-A · $205.00 per TON · qty 128.0 · bid tab
  • 2026-01-14 · INDOT · T-43756-A · $86.00 per TON · qty 1788.0 · bid tab
  • 2026-01-14 · INDOT · T-43756-A · $114.00 per TON · qty 539.0 · bid tab
  • 2026-01-14 · INDOT · T-43756-A · $119.00 per TON · qty 672.0 · bid tab
  • 2026-01-14 · INDOT · T-43756-A · $125.00 per TON · qty 402.0 · bid tab
  • 2025-07-09 · INDOT · B-42813-A · $350.00 per TON · qty 18.0 · bid tab
  • 2025-07-09 · INDOT · B-42813-A · $240.00 per TON · qty 57.0 · bid tab
  • 2025-07-09 · INDOT · B-42813-A · $500.00 per TON · qty 11.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $107.00 per TON · qty 2096.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $105.00 per TON · qty 1901.0 · bid tab
(10 most recent of 20 shown; all in the Hubstake feed)
concrete pavementSYS1$250.00$250.00 to $250.00
Bids
  • 2025-07-09 · INDOT · B-40997-A · $250.00 per SYS · qty 392.0 · bid tab
curb gutterEACH2$3,337.50$3,225.00 to $3,450.00
Bids
  • 2025-07-09 · INDOT · B-40997-A · $3,225.00 per EACH · qty 4.0 · bid tab
  • 2025-07-09 · INDOT · B-42813-A · $3,450.00 per EACH · qty 4.0 · bid tab
curb gutterLFT9$32.73$0.98 to $288.96
Bids
  • 2026-01-14 · INDOT · T-43756-A · $31.26 per LFT · qty 1195.0 · bid tab
  • 2025-07-09 · INDOT · B-42813-A · $150.00 per LFT · qty 82.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $0.98 per LFT · qty 282.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $31.00 per LFT · qty 10730.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $38.62 per LFT · qty 296.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $32.73 per LFT · qty 2293.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $30.56 per LFT · qty 1108.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $37.73 per LFT · qty 202.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $288.96 per LFT · qty 14.0 · bid tab
curb gutterSYS2$305.31$161.70 to $448.92
Bids
  • 2024-09-11 · INDOT · R-40412-A · $161.70 per SYS · qty 126.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $448.92 per SYS · qty 9.0 · bid tab
excavation embankmentLS8$84,500.00$25,000.00 to $750,000.00
Bids
  • 2026-01-14 · INDOT · T-43756-A · $99,000.00 per LS · qty 1.0 · bid tab
  • 2025-08-06 · INDOT · R-43732-A · $25,000.00 per LS · qty 1.0 · bid tab
  • 2025-07-09 · INDOT · B-40997-A · $103,000.00 per LS · qty 1.0 · bid tab
  • 2025-07-09 · INDOT · B-42813-A · $56,500.00 per LS · qty 1.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $750,000.00 per LS · qty 1.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $100,000.00 per LS · qty 1.0 · bid tab
  • 2024-04-10 · INDOT · M-45425-A · $70,000.00 per LS · qty 1.0 · bid tab
  • 2024-01-18 · INDOT · R-45415-A · $29,500.00 per LS · qty 1.0 · bid tab
inlet headwallCYS1$6,000.00$6,000.00 to $6,000.00
Bids
  • 2025-08-06 · INDOT · R-43732-A · $6,000.00 per CYS · qty 0.5 · bid tab
inlet headwallEACH12$3,900.00$3,550.00 to $7,100.00
Bids
  • 2026-01-14 · INDOT · T-43756-A · $5,800.00 per EACH · qty 2.0 · bid tab
  • 2026-01-14 · INDOT · T-43756-A · $7,000.00 per EACH · qty 3.0 · bid tab
  • 2026-01-14 · INDOT · T-43756-A · $7,100.00 per EACH · qty 2.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $3,800.00 per EACH · qty 16.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $3,600.00 per EACH · qty 2.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $3,700.00 per EACH · qty 1.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $3,800.00 per EACH · qty 32.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $3,550.00 per EACH · qty 1.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $4,400.00 per EACH · qty 1.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $3,750.00 per EACH · qty 28.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
lime cement stabilizationSYS11$47.57$27.00 to $150.00
Bids
  • 2026-01-14 · INDOT · T-43756-A · $54.00 per SYS · qty 436.0 · bid tab
  • 2026-01-14 · INDOT · T-43756-A · $47.57 per SYS · qty 4912.0 · bid tab
  • 2025-07-09 · INDOT · B-40997-A · $43.00 per SYS · qty 1028.0 · bid tab
  • 2025-07-09 · INDOT · B-42813-A · $70.00 per SYS · qty 125.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $54.00 per SYS · qty 2648.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $33.00 per SYS · qty 28137.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $27.00 per SYS · qty 5216.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $35.00 per SYS · qty 149.0 · bid tab
  • 2024-05-09 · INDOT · R-41802-A · $33.00 per SYS · qty 1442.0 · bid tab
  • 2024-04-10 · INDOT · M-45425-A · $150.00 per SYS · qty 1600.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
manholeEACH13$9,150.00$6,300.00 to $29,000.00
Bids
  • 2026-01-14 · INDOT · T-43756-A · $6,670.00 per EACH · qty 2.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $7,200.00 per EACH · qty 17.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $6,300.00 per EACH · qty 32.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $9,150.00 per EACH · qty 15.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $9,950.00 per EACH · qty 1.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $29,000.00 per EACH · qty 1.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $7,050.00 per EACH · qty 1.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $12,000.00 per EACH · qty 1.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $6,300.00 per EACH · qty 1.0 · bid tab
  • 2024-09-11 · INDOT · R-40412-A · $20,000.00 per EACH · qty 3.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
sidewalkEACH1$10,000.00$10,000.00 to $10,000.00
Bids
  • 2025-07-09 · INDOT · B-40997-A · $10,000.00 per EACH · qty 2.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.