Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSQ YD65$5.00$0.93 to $135.00
Bids
  • 2026-07-31 · IDOT · Section 25-00078-00-RS · $40.00 per SQ YD · qty 344.0 · bid tab
  • 2026-07-31 · IDOT · Section 25-00078-00-RS · $120.00 per SQ YD · qty 101.0 · bid tab
  • 2026-07-31 · IDOT · Section 25-00078-00-RS · $135.00 per SQ YD · qty 279.0 · bid tab
  • 2026-04-24 · IDOT · Section 24-00133-00-SP · $37.00 per SQ YD · qty 154.0 · bid tab
  • 2026-04-24 · IDOT · Section 24-00133-00-SP · $70.00 per SQ YD · qty 1558.0 · bid tab
  • 2026-04-24 · IDOT · Section D9 BRIDGE OVERLAY 2026-8 · $27.00 per SQ YD · qty 214.0 · bid tab
  • 2026-02-27 · IDOT · Section 129RS-10 · $1.50 per SQ YD · qty 33557.0 · bid tab
  • 2026-02-27 · IDOT · Section 129RS-10 · $15.00 per SQ YD · qty 384.0 · bid tab
  • 2025-11-07 · IDOT · Section 101B-1 · $10.00 per SQ YD · qty 1575.0 · bid tab
  • 2025-11-07 · IDOT · Section 101B-1 · $120.00 per SQ YD · qty 211.0 · bid tab
(10 most recent of 65 shown; all in the Hubstake feed)
asphalt pavementTON64$94.74$66.67 to $650.00
Bids
  • 2026-07-31 · IDOT · Section 25-00078-00-RS · $97.00 per TON · qty 1977.0 · bid tab
  • 2026-07-31 · IDOT · Section 25-00078-00-RS · $99.00 per TON · qty 1977.0 · bid tab
  • 2026-07-31 · IDOT · Section 25-00078-00-RS · $550.00 per TON · qty 22.0 · bid tab
  • 2026-04-24 · IDOT · Section 24-00133-00-SP · $168.00 per TON · qty 344.0 · bid tab
  • 2026-04-24 · IDOT · Section 24-00133-00-SP · $140.00 per TON · qty 741.0 · bid tab
  • 2026-04-24 · IDOT · Section 24-00133-00-SP · $650.00 per TON · qty 41.0 · bid tab
  • 2026-04-24 · IDOT · Section D9 BRIDGE OVERLAY 2026-8 · $120.00 per TON · qty 9.0 · bid tab
  • 2026-02-27 · IDOT · Section 129RS-10 · $400.00 per TON · qty 37.0 · bid tab
  • 2026-02-27 · IDOT · Section 129RS-10 · $77.00 per TON · qty 2268.0 · bid tab
  • 2026-02-27 · IDOT · Section 129RS-10 · $76.00 per TON · qty 1035.0 · bid tab
(10 most recent of 64 shown; all in the Hubstake feed)
curb gutterFOOT43$53.00$1.05 to $128.16
Bids
  • 2026-04-24 · IDOT · Section 24-00133-00-SP · $7.00 per FOOT · qty 79.0 · bid tab
  • 2026-04-24 · IDOT · Section 24-00133-00-SP · $53.00 per FOOT · qty 1283.0 · bid tab
  • 2026-02-27 · IDOT · Section 21-00164-00-PV · $42.00 per FOOT · qty 210.0 · bid tab
  • 2026-02-27 · IDOT · Section 21-00164-00-PV · $47.00 per FOOT · qty 4567.0 · bid tab
  • 2026-02-27 · IDOT · Section 21-00164-00-PV · $60.00 per FOOT · qty 331.0 · bid tab
  • 2025-08-01 · IDOT · Section 06-00054-00-FP · $55.00 per FOOT · qty 371.0 · bid tab
  • 2025-08-01 · IDOT · Section 23-00131-00-BT · $35.00 per FOOT · qty 194.0 · bid tab
  • 2025-08-01 · IDOT · Section 23-00131-00-BT · $17.00 per FOOT · qty 113.0 · bid tab
  • 2025-08-01 · IDOT · Section 23-00131-00-BT · $65.00 per FOOT · qty 1348.0 · bid tab
  • 2025-08-01 · IDOT · Section 23-00131-00-BT · $19.00 per FOOT · qty 383.0 · bid tab
(10 most recent of 43 shown; all in the Hubstake feed)
excavation embankmentCU YD1$20.07$20.07 to $20.07
Bids
  • 2025-06-13 · IDOT · Section X1-4(HB-3) · $20.07 per CU YD · qty 21235.0 · bid tab
inlet headwallEACH13$200.00$100.00 to $16,150.00
Bids
  • 2026-04-24 · IDOT · Section 24-00133-00-SP · $153.00 per EACH · qty 4.0 · bid tab
  • 2026-02-27 · IDOT · Section 21-00164-00-PV · $135.00 per EACH · qty 7.0 · bid tab
  • 2025-08-01 · IDOT · Section 06-00054-00-FP · $200.00 per EACH · qty 31.0 · bid tab
  • 2025-08-01 · IDOT · Section 23-00131-00-BT · $200.00 per EACH · qty 14.0 · bid tab
  • 2025-06-13 · IDOT · Section X1-4(HB-3) · $5,999.15 per EACH · qty 4.0 · bid tab
  • 2025-06-13 · IDOT · Section X1-4(HB-3) · $243.89 per EACH · qty 3.0 · bid tab
  • 2025-04-25 · IDOT · Section (1-4)R-5,RS-2,B-1,B-2,B-3,B-4 · $16,150.00 per EACH · qty 5.0 · bid tab
  • 2025-04-25 · IDOT · Section (1-4)R-5,RS-2,B-1,B-2,B-3,B-4 · $206.00 per EACH · qty 15.0 · bid tab
  • 2025-01-17 · IDOT · Section 19-00156-00-SP · $100.00 per EACH · qty 6.0 · bid tab
  • 2024-12-13 · IDOT · Section (X1-8,X1-7-1,X1-7,X1-6-1)R-2 · $140.00 per EACH · qty 114.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
lime cement stabilizationTON1$240.00$240.00 to $240.00
Bids
  • 2024-12-13 · IDOT · Section (X1-8,X1-7-1,X1-7,X1-6-1)R-2 · $240.00 per TON · qty 265.0 · bid tab
manholeEACH2$4,550.00$3,000.00 to $6,100.00
Bids
  • 2026-04-24 · IDOT · Section 24-00133-00-SP · $3,000.00 per EACH · qty 3.0 · bid tab
  • 2025-08-01 · IDOT · Section 23-00131-00-BT · $6,100.00 per EACH · qty 8.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.