PadstakeGet the fee reports
Menu

Site-work prices, Tazewell County, IL

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSQ YD98$20.08$1.00 to $821.32
Bids
  • 2026-07-31 · IDOT · Section 32RS-6;29RS-5;28RS-3 · $14.00 per SQ YD · qty 2041.5 · bid tab
  • 2026-07-31 · IDOT · Section 32RS-6;29RS-5;28RS-3 · $20.00 per SQ YD · qty 791.0 · bid tab
  • 2026-07-31 · IDOT · Section 32RS-6;29RS-5;28RS-3 · $1.50 per SQ YD · qty 103787.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $22.68 per SQ YD · qty 1480.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $36.68 per SQ YD · qty 6479.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $175.30 per SQ YD · qty 1958.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $145.32 per SQ YD · qty 1318.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $7.60 per SQ YD · qty 6465.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $3.39 per SQ YD · qty 62442.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $6.74 per SQ YD · qty 9970.0 · bid tab
(10 most recent of 98 shown; all in the Hubstake feed)
asphalt pavementTON77$197.70$112.00 to $1,202.95
Bids
  • 2026-07-31 · IDOT · Section 32RS-6;29RS-5;28RS-3 · $145.00 per TON · qty 33.0 · bid tab
  • 2026-07-31 · IDOT · Section 32RS-6;29RS-5;28RS-3 · $140.00 per TON · qty 315.0 · bid tab
  • 2026-07-31 · IDOT · Section 32RS-6;29RS-5;28RS-3 · $175.00 per TON · qty 283.4 · bid tab
  • 2026-07-31 · IDOT · Section 32RS-6;29RS-5;28RS-3 · $112.00 per TON · qty 8287.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $195.00 per TON · qty 1009.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $189.30 per TON · qty 8759.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $428.39 per TON · qty 894.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $668.25 per TON · qty 426.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $176.65 per TON · qty 5245.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $713.39 per TON · qty 10.0 · bid tab
(10 most recent of 77 shown; all in the Hubstake feed)
concrete pavementFOOT1$8.00$8.00 to $8.00
Bids
  • 2025-06-13 · IDOT · Section 37-PP · $8.00 per FOOT · qty 630.0 · bid tab
curb gutterEACH5$13.32$5.50 to $20.00
Bids
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $6.60 per EACH · qty 20.0 · bid tab
  • 2026-06-12 · IDOT · Section (18HB)BRR;35RS-12;17RS-8 · $15.40 per EACH · qty 133.0 · bid tab
  • 2024-09-20 · IDOT · Section (M-15D,4)RS-1 · $5.50 per EACH · qty 6.0 · bid tab
  • 2024-06-14 · IDOT · Section D4 BRIDGE JOINT REPAIR 2024 · $13.32 per EACH · qty 194.0 · bid tab
  • 2023-11-17 · IDOT · Section 13-[(HB,HB-1,2)BR-1]RS-2 · $20.00 per EACH · qty 6.0 · bid tab
curb gutterFOOT54$103.44$4.63 to $616.40
Bids
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $19.35 per FOOT · qty 762.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $163.94 per FOOT · qty 330.0 · bid tab
  • 2026-06-12 · IDOT · Section (126X)RS-4;127RS-5;(108-HB)BRR · $196.28 per FOOT · qty 432.0 · bid tab
  • 2026-06-12 · IDOT · Section (18HB)BRR;35RS-12;17RS-8 · $174.90 per FOOT · qty 60.0 · bid tab
  • 2026-06-12 · IDOT · Section (18HB)BRR;35RS-12;17RS-8 · $135.30 per FOOT · qty 22.0 · bid tab
  • 2026-06-12 · IDOT · Section 11RS-13 · $285.90 per FOOT · qty 17.0 · bid tab
  • 2026-06-12 · IDOT · Section 11RS-13 · $106.06 per FOOT · qty 25.0 · bid tab
  • 2026-06-12 · IDOT · Section 11RS-13 · $275.92 per FOOT · qty 25.0 · bid tab
  • 2026-06-12 · IDOT · Section 11RS-13 · $616.40 per FOOT · qty 7.0 · bid tab
  • 2026-01-16 · IDOT · Section 17(RS-6,TS-2);18(RS,TS)-2 · $111.42 per FOOT · qty 526.0 · bid tab
(10 most recent of 54 shown; all in the Hubstake feed)
curb gutterSQ FT2$24.42$17.50 to $31.34
Bids
  • 2025-06-13 · IDOT · Section 20-00196-01-RS · $31.34 per SQ FT · qty 295.0 · bid tab
  • 2025-04-25 · IDOT · Section 22-00130-00-SW · $17.50 per SQ FT · qty 154.0 · bid tab
excavation embankmentCU YD1$40.57$40.57 to $40.57
Bids
  • 2024-03-08 · IDOT · Section PEKIN MUNICIPAL · $40.57 per CU YD · qty 1749.0 · bid tab
flexible baseSQ YD1$19.75$19.75 to $19.75
Bids
  • 2024-03-08 · IDOT · Section PEKIN MUNICIPAL · $19.75 per SQ YD · qty 5638.0 · bid tab
inlet headwallEACH11$410.89$149.38 to $8,943.29
Bids
  • 2026-06-12 · IDOT · Section (18HB)BRR;35RS-12;17RS-8 · $149.38 per EACH · qty 1.0 · bid tab
  • 2026-01-16 · IDOT · Section 17(RS-6,TS-2);18(RS,TS)-2 · $8,943.29 per EACH · qty 1.0 · bid tab
  • 2025-04-25 · IDOT · Section 118RS-8,W-2 · $410.89 per EACH · qty 61.0 · bid tab
  • 2025-04-25 · IDOT · Section 20-00130-00-RS · $620.98 per EACH · qty 5.0 · bid tab
  • 2025-04-25 · IDOT · Section 22-00130-00-SW · $160.00 per EACH · qty 18.0 · bid tab
  • 2025-03-07 · IDOT · Section 19-00171-00-RP · $217.50 per EACH · qty 2.0 · bid tab
  • 2024-09-20 · IDOT · Section (M-15D,4)RS-1 · $942.09 per EACH · qty 15.0 · bid tab
  • 2024-06-14 · IDOT · Section (R)RS-2;126RS-3 · $878.48 per EACH · qty 3.0 · bid tab
  • 2024-03-08 · IDOT · Section 21-00198-00-BT · $275.89 per EACH · qty 3.0 · bid tab
  • 2024-03-08 · IDOT · Section 21-00198-00-BT · $7,616.31 per EACH · qty 2.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
manholeEACH3$3,792.96$2,670.66 to $5,780.59
Bids
  • 2025-06-13 · IDOT · Section 20-00196-01-RS · $2,670.66 per EACH · qty 6.0 · bid tab
  • 2025-04-25 · IDOT · Section 118RS-8,W-2 · $5,780.59 per EACH · qty 4.0 · bid tab
  • 2025-03-07 · IDOT · Section 19-00171-00-RP · $3,792.96 per EACH · qty 1.0 · bid tab
sidewalkEACH1$1,260.72$1,260.72 to $1,260.72
Bids
  • 2025-06-13 · IDOT · Section 20-00196-01-RS · $1,260.72 per EACH · qty 2.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.