Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSQ YD38$8.32$0.91 to $122.62
Bids
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $6.50 per SQ YD · qty 63.0 · bid tab
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $3.75 per SQ YD · qty 5053.0 · bid tab
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $4.00 per SQ YD · qty 4163.0 · bid tab
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $2.50 per SQ YD · qty 14627.0 · bid tab
  • 2026-02-27 · IDOT · Section 130B-1 · $122.62 per SQ YD · qty 124.0 · bid tab
  • 2026-02-27 · IDOT · Section 130B-1 · $12.62 per SQ YD · qty 725.0 · bid tab
  • 2026-02-27 · IDOT · Section 130B-1 · $99.65 per SQ YD · qty 432.0 · bid tab
  • 2026-02-27 · IDOT · Section D9 BRIDGE OVERLAY 2026-4 · $40.00 per SQ YD · qty 271.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00149-00-PV · $38.00 per SQ YD · qty 4869.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00149-00-PV · $15.00 per SQ YD · qty 1020.0 · bid tab
(10 most recent of 38 shown; all in the Hubstake feed)
asphalt pavementTON37$106.71$70.89 to $650.00
Bids
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $100.00 per TON · qty 1914.0 · bid tab
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $108.00 per TON · qty 1671.0 · bid tab
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $650.00 per TON · qty 21.0 · bid tab
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $95.00 per TON · qty 163.0 · bid tab
  • 2026-02-27 · IDOT · Section 130B-1 · $519.49 per TON · qty 37.0 · bid tab
  • 2026-02-27 · IDOT · Section 130B-1 · $316.90 per TON · qty 24.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00149-00-PV · $82.00 per TON · qty 2848.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00149-00-PV · $96.00 per TON · qty 637.0 · bid tab
  • 2026-01-16 · IDOT · Section 3VB-3 · $218.54 per TON · qty 57.0 · bid tab
  • 2026-01-16 · IDOT · Section 3VB-3 · $173.97 per TON · qty 187.0 · bid tab
(10 most recent of 37 shown; all in the Hubstake feed)
curb gutterFOOT26$55.00$7.21 to $115.00
Bids
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $10.00 per FOOT · qty 809.0 · bid tab
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $60.00 per FOOT · qty 56.0 · bid tab
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $55.00 per FOOT · qty 701.0 · bid tab
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $115.00 per FOOT · qty 55.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00151-00-BT · $75.00 per FOOT · qty 40.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00151-00-BT · $75.00 per FOOT · qty 40.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00151-00-BT · $10.00 per FOOT · qty 362.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00151-00-BT · $50.00 per FOOT · qty 282.0 · bid tab
  • 2026-01-16 · IDOT · Section 3VB-3 · $12.23 per FOOT · qty 18.0 · bid tab
  • 2025-06-13 · IDOT · Section (12-1)N-2 · $65.00 per FOOT · qty 36.0 · bid tab
(10 most recent of 26 shown; all in the Hubstake feed)
excavation embankmentCU YD2$23.20$21.66 to $24.74
Bids
  • 2026-01-16 · IDOT · Section 3VB-3 · $21.66 per CU YD · qty 10879.0 · bid tab
  • 2025-03-07 · IDOT · Section SOUTHERN ILLINOIS · $24.74 per CU YD · qty 1295.0 · bid tab
flexible baseTON1$30.76$30.76 to $30.76
Bids
  • 2025-03-07 · IDOT · Section SOUTHERN ILLINOIS · $30.76 per TON · qty 2085.0 · bid tab
inlet headwallEACH12$200.00$62.00 to $6,000.00
Bids
  • 2026-09-18 · IDOT · Section (12,12-2)R-1,RS-3 · $200.00 per EACH · qty 11.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00149-00-PV · $125.00 per EACH · qty 7.0 · bid tab
  • 2026-01-16 · IDOT · Section 22-00151-00-BT · $200.00 per EACH · qty 14.0 · bid tab
  • 2025-06-13 · IDOT · Section (12-1)SLP-1 · $148.00 per EACH · qty 1.0 · bid tab
  • 2025-04-25 · IDOT · Section 23-00160-00-RS · $1,200.00 per EACH · qty 2.0 · bid tab
  • 2025-04-25 · IDOT · Section 23-00160-00-RS · $150.00 per EACH · qty 20.0 · bid tab
  • 2025-03-07 · IDOT · Section SOUTHERN ILLINOIS · $4,185.09 per EACH · qty 1.0 · bid tab
  • 2024-11-08 · IDOT · Section (12-1)TS-2 · $6,000.00 per EACH · qty 1.0 · bid tab
  • 2024-11-08 · IDOT · Section (12-1)TS-2 · $62.00 per EACH · qty 7.0 · bid tab
  • 2024-04-26 · IDOT · Section 21-00147-00-BT · $2,900.00 per EACH · qty 2.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
lime cement stabilizationTON2$269.11$169.35 to $368.87
Bids
  • 2025-06-13 · IDOT · Section (1R)SLP-1 · $368.87 per TON · qty 34.0 · bid tab
  • 2025-03-07 · IDOT · Section SOUTHERN ILLINOIS · $169.35 per TON · qty 140.0 · bid tab
manholeEACH3$1,637.55$500.00 to $11,100.77
Bids
  • 2026-01-16 · IDOT · Section 22-00151-00-BT · $500.00 per EACH · qty 2.0 · bid tab
  • 2025-03-07 · IDOT · Section SOUTHERN ILLINOIS · $11,100.77 per EACH · qty 1.0 · bid tab
  • 2023-11-17 · IDOT · Section 19-00141-00-BR · $1,637.55 per EACH · qty 1.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.