Site-work prices, Douglas County, IL

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSQ YD11$16.20$7.81 to $93.72
Bids
  • 2025-04-25 · IDOT · Section WALNUT POINT 2025 · $31.00 per SQ YD · qty 447.0 · bid tab
  • 2024-12-13 · IDOT · Section (21-27B-2)BR · $18.18 per SQ YD · qty 509.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $47.52 per SQ YD · qty 95346.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $12.34 per SQ YD · qty 32887.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $55.77 per SQ YD · qty 648.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $10.72 per SQ YD · qty 32539.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $10.74 per SQ YD · qty 114912.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $7.81 per SQ YD · qty 62990.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $9.98 per SQ YD · qty 234399.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $93.72 per SQ YD · qty 3200.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
asphalt pavementTON5$155.54$150.00 to $610.69
Bids
  • 2025-04-25 · IDOT · Section WALNUT POINT 2025 · $150.00 per TON · qty 257.0 · bid tab
  • 2025-04-25 · IDOT · Section WALNUT POINT 2025 · $160.00 per TON · qty 4904.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $150.01 per TON · qty 67053.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $155.54 per TON · qty 2529.0 · bid tab
  • 2024-04-26 · IDOT · Section (15,21-25,21-26,27)RS-2 · $610.69 per TON · qty 55.0 · bid tab
curb gutterFOOT2$94.85$77.00 to $112.70
Bids
  • 2025-04-25 · IDOT · Section WALNUT POINT 2025 · $77.00 per FOOT · qty 213.0 · bid tab
  • 2024-12-13 · IDOT · Section (21-27B-2)BR · $112.70 per FOOT · qty 60.0 · bid tab
fire hydrantEACH1$2,850.00$2,850.00 to $2,850.00
Bids
  • 2025-04-25 · IDOT · Section WALNUT POINT 2025 · $2,850.00 per EACH · qty 4.0 · bid tab
flexible baseSQ YD1$129.75$129.75 to $129.75
Bids
  • 2026-02-27 · IDOT · Section (22)BR-1,(115)BR-1 · $129.75 per SQ YD · qty 242.0 · bid tab
inlet headwallEACH1$590.00$590.00 to $590.00
Bids
  • 2025-04-25 · IDOT · Section WALNUT POINT 2025 · $590.00 per EACH · qty 37.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.