Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSQ YD23$32.00$1.70 to $474.00
Bids
  • 2025-11-07 · IDOT · Section (FXX-B)B · $11.00 per SQ YD · qty 516.0 · bid tab
  • 2025-11-07 · IDOT · Section (FXX-B)B · $89.00 per SQ YD · qty 1007.0 · bid tab
  • 2025-11-07 · IDOT · Section (FXX-B)B · $9.00 per SQ YD · qty 663.0 · bid tab
  • 2025-11-07 · IDOT · Section (FXX-B)B · $236.00 per SQ YD · qty 85.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $281.33 per SQ YD · qty 1082.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $102.57 per SQ YD · qty 10550.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $1.71 per SQ YD · qty 2792.0 · bid tab
  • 2025-08-01 · IDOT · Section 25-00088-00-RS · $25.99 per SQ YD · qty 148.0 · bid tab
  • 2024-12-13 · IDOT · Section D7 BRIDGE REPAIRS 2024-12 · $32.30 per SQ YD · qty 1240.0 · bid tab
  • 2024-12-13 · IDOT · Section D7 BRIDGE REPAIRS 2024-12 · $68.70 per SQ YD · qty 544.0 · bid tab
(10 most recent of 23 shown; all in the Hubstake feed)
asphalt pavementTON21$198.00$117.94 to $810.00
Bids
  • 2025-11-07 · IDOT · Section (FXX-B)B · $209.00 per TON · qty 207.0 · bid tab
  • 2025-11-07 · IDOT · Section (FXX-B)B · $198.00 per TON · qty 481.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $185.23 per TON · qty 3876.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $173.64 per TON · qty 8409.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $153.99 per TON · qty 25412.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $273.36 per TON · qty 1214.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $184.92 per TON · qty 5973.0 · bid tab
  • 2025-08-01 · IDOT · Section 25-00088-00-RS · $446.49 per TON · qty 39.0 · bid tab
  • 2025-08-01 · IDOT · Section 25-00088-00-RS · $117.94 per TON · qty 2855.0 · bid tab
  • 2024-12-13 · IDOT · Section D7 BRIDGE REPAIRS 2024-12 · $724.00 per TON · qty 60.0 · bid tab
(10 most recent of 21 shown; all in the Hubstake feed)
curb gutterFOOT5$9.54$6.00 to $95.17
Bids
  • 2025-11-07 · IDOT · Section (FXX-B)B · $6.00 per FOOT · qty 344.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $95.17 per FOOT · qty 675.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $9.04 per FOOT · qty 631.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $9.54 per FOOT · qty 1540.0 · bid tab
  • 2024-04-26 · IDOT · Section 21-00008-01-SW · $75.00 per FOOT · qty 218.0 · bid tab
inlet headwallEACH2$4,693.75$251.00 to $9,136.50
Bids
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $251.00 per EACH · qty 19.0 · bid tab
  • 2025-09-19 · IDOT · Section (18-1VB,18-20HB)B · $9,136.50 per EACH · qty 1.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.