PadstakeGet the fee reports
Menu

Site-work prices, Teton County, ID

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON1$135.70$135.70 to $135.70
Bids
  • 2025-03-04 · ITD · 21983241213 · $135.70 per TON · qty 7820.0 · bid tab
excavation embankmentCY1$16.75$16.75 to $16.75
Bids
  • 2025-03-04 · ITD · 21983241213 · $16.75 per CY · qty 2714.0 · bid tab
storm pipe 18-inchFT1$105.00$105.00 to $105.00
Bids
  • 2025-03-04 · ITD · 21983241213 · $105.00 per FT · qty 655.0 · bid tab
storm pipe 24-inchFT1$270.00$270.00 to $270.00
Bids
  • 2025-03-04 · ITD · 21983241213 · $270.00 per FT · qty 7.0 · bid tab
storm pipe 30-inchFT1$285.00$285.00 to $285.00
Bids
  • 2025-03-04 · ITD · 21983241213 · $285.00 per FT · qty 21.0 · bid tab
storm pipe 36-inchFT1$165.00$165.00 to $165.00
Bids
  • 2025-03-04 · ITD · 21983241213 · $165.00 per FT · qty 168.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.