Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSY23$51.58$8.45 to $275.55
Bids
  • 2026-02-17 · Iowa DOT · 92-2183-091 · $88.46 per SY · qty 1255.8 · bid tab
  • 2026-02-17 · Iowa DOT · 92-2183-091 · $23.14 per SY · qty 5168.63 · bid tab
  • 2026-02-17 · Iowa DOT · 92-2183-091 · $74.78 per SY · qty 4781.91 · bid tab
  • 2026-02-17 · Iowa DOT · 92-2183-091 · $73.21 per SY · qty 1693.8 · bid tab
  • 2025-08-19 · Iowa DOT · 92-C092-129 · $39.70 per SY · qty 8249.0 · bid tab
  • 2025-01-22 · Iowa DOT · 92-8140-615-A · $130.00 per SY · qty 150.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $51.58 per SY · qty 21595.6 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $66.95 per SY · qty 66.7 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $40.85 per SY · qty 166.7 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $8.45 per SY · qty 129577.0 · bid tab
(10 most recent of 23 shown; all in the Hubstake feed)
asphalt pavementTON6$100.80$54.90 to $842.91
Bids
  • 2026-02-17 · Iowa DOT · 92-2183-091 · $59.75 per TON · qty 1726.49 · bid tab
  • 2026-02-17 · Iowa DOT · 92-2183-091 · $57.34 per TON · qty 21899.43 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $842.91 per TON · qty 198.812 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $842.91 per TON · qty 163.291 · bid tab
  • 2024-02-20 · Iowa DOT · 92-2183-090 · $141.85 per TON · qty 398.4 · bid tab
  • 2024-02-20 · Iowa DOT · 92-2183-090 · $54.90 per TON · qty 12555.4 · bid tab
concrete pavementSY3$100.00$100.00 to $133.10
Bids
  • 2025-12-16 · Iowa DOT · 92-0222-085 · $100.00 per SY · qty 6.2 · bid tab
  • 2025-01-22 · Iowa DOT · 92-8140-615-A · $100.00 per SY · qty 327.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-2183-090 · $133.10 per SY · qty 1155.6 · bid tab
curb gutterEACH1$50.00$50.00 to $50.00
Bids
  • 2025-01-22 · Iowa DOT · 92-8140-615-A · $50.00 per EACH · qty 4.0 · bid tab
curb gutterLF3$80.00$30.00 to $120.00
Bids
  • 2025-12-16 · Iowa DOT · 92-0222-085 · $80.00 per LF · qty 93.0 · bid tab
  • 2025-01-22 · Iowa DOT · 92-8140-615-A · $30.00 per LF · qty 40.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $120.00 per LF · qty 200.0 · bid tab
excavation embankmentCY9$12.00$3.23 to $126.50
Bids
  • 2026-02-17 · Iowa DOT · 92-2183-091 · $105.00 per CY · qty 15.0 · bid tab
  • 2026-02-17 · Iowa DOT · 92-2183-091 · $80.00 per CY · qty 192.0 · bid tab
  • 2025-07-15 · Iowa DOT · 92-C092-130 · $6.75 per CY · qty 1017.0 · bid tab
  • 2024-09-17 · Iowa DOT · 92-8222-602 · $7.70 per CY · qty 465.0 · bid tab
  • 2024-09-17 · Iowa DOT · 92-C092-125 · $7.75 per CY · qty 507.0 · bid tab
  • 2024-06-18 · Iowa DOT · 92-C092-126 · $3.23 per CY · qty 133175.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $16.25 per CY · qty 3547.9 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $12.00 per CY · qty 636.9 · bid tab
  • 2024-02-20 · Iowa DOT · 92-2183-090 · $126.50 per CY · qty 603.1 · bid tab
fire hydrantEACH1$8,750.00$8,750.00 to $8,750.00
Bids
  • 2025-01-22 · Iowa DOT · 92-8140-615-A · $8,750.00 per EACH · qty 1.0 · bid tab
lime cement stabilizationACRE8$375.00$200.00 to $2,000.00
Bids
  • 2025-12-16 · Iowa DOT · 92-0222-085 · $2,000.00 per ACRE · qty 0.2 · bid tab
  • 2025-07-15 · Iowa DOT · 92-C092-130 · $200.00 per ACRE · qty 1.4 · bid tab
  • 2024-09-17 · Iowa DOT · 92-8222-602 · $400.00 per ACRE · qty 0.6 · bid tab
  • 2024-06-18 · Iowa DOT · 92-C092-126 · $300.00 per ACRE · qty 25.7 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $1,000.00 per ACRE · qty 1.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $250.00 per ACRE · qty 1.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $350.00 per ACRE · qty 1.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $575.00 per ACRE · qty 1.0 · bid tab
lime cement stabilizationLF1$65.00$65.00 to $65.00
Bids
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $65.00 per LF · qty 200.0 · bid tab
lime cement stabilizationSY1$6.60$6.60 to $6.60
Bids
  • 2024-02-20 · Iowa DOT · 92-2183-090 · $6.60 per SY · qty 1233.2 · bid tab
sidewalkEACH3$5,500.00$3,350.00 to $7,750.00
Bids
  • 2025-12-16 · Iowa DOT · 92-0222-085 · $5,500.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 92-8140-615-A · $7,750.00 per EACH · qty 1.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $3,350.00 per EACH · qty 1.0 · bid tab
sidewalkSY5$85.00$57.50 to $150.00
Bids
  • 2025-12-16 · Iowa DOT · 92-0222-085 · $70.00 per SY · qty 91.5 · bid tab
  • 2025-12-16 · Iowa DOT · 92-0222-085 · $57.50 per SY · qty 496.1 · bid tab
  • 2025-12-16 · Iowa DOT · 92-0222-085 · $150.00 per SY · qty 24.0 · bid tab
  • 2025-12-16 · Iowa DOT · 92-0222-085 · $85.00 per SY · qty 86.7 · bid tab
  • 2025-01-22 · Iowa DOT · 92-8140-615-A · $105.00 per SY · qty 66.0 · bid tab
storm pipe 15-inchLF1$250.00$250.00 to $250.00
Bids
  • 2025-01-22 · Iowa DOT · 92-8140-615-A · $250.00 per LF · qty 8.0 · bid tab
storm pipe 18-inchLF7$44.00$38.00 to $150.00
Bids
  • 2024-09-17 · Iowa DOT · 92-8222-602 · $38.00 per LF · qty 48.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $44.00 per LF · qty 73.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $67.00 per LF · qty 45.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $150.00 per LF · qty 5.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $39.00 per LF · qty 42.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $70.00 per LF · qty 14.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $39.00 per LF · qty 145.0 · bid tab
storm pipe 24-inchLF7$83.00$45.00 to $522.50
Bids
  • 2026-02-17 · Iowa DOT · 92-2183-091 · $350.00 per LF · qty 32.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $83.00 per LF · qty 67.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $83.00 per LF · qty 27.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $45.00 per LF · qty 69.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $45.00 per LF · qty 12.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-0929-166 · $110.00 per LF · qty 86.0 · bid tab
  • 2024-02-20 · Iowa DOT · 92-2183-090 · $522.50 per LF · qty 12.0 · bid tab
storm pipe 30-inchLF1$65.00$65.00 to $65.00
Bids
  • 2024-02-20 · Iowa DOT · 92-0014-062 · $65.00 per LF · qty 100.0 · bid tab
storm pipe 36-inchLF2$150.00$150.00 to $150.00
Bids
  • 2024-06-18 · Iowa DOT · 92-C092-126 · $150.00 per LF · qty 72.0 · bid tab
  • 2024-06-18 · Iowa DOT · 92-C092-126 · $150.00 per LF · qty 40.0 · bid tab
storm pipe 54-inchLF1$505.00$505.00 to $505.00
Bids
  • 2025-08-19 · Iowa DOT · 92-C092-131 · $505.00 per LF · qty 110.0 · bid tab
water serviceLF1$100.00$100.00 to $100.00
Bids
  • 2024-09-17 · Iowa DOT · 92-8222-602 · $100.00 per LF · qty 70.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.