| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | SY | 6 | $85.50 | $2.68 to $113.00 | Bids- 2026-02-17 · Iowa DOT · 90-0632-176 · $95.00 per SY · qty 407.2 · bid tab
- 2026-02-17 · Iowa DOT · 90-0632-176 · $90.00 per SY · qty 1351.3 · bid tab
- 2025-12-16 · Iowa DOT · 90-C090-115 · $2.68 per SY · qty 32256.0 · bid tab
- 2025-12-16 · Iowa DOT · 90-C090-115 · $2.68 per SY · qty 48366.0 · bid tab
- 2024-10-15 · Iowa DOT · 90-0347-148 · $113.00 per SY · qty 349.6 · bid tab
- 2024-10-15 · Iowa DOT · 90-0347-148 · $81.00 per SY · qty 420.4 · bid tab
|
| asphalt pavement | TON | 2 | $600.00 | $600.00 to $600.00 | Bids- 2025-12-16 · Iowa DOT · 90-C090-115 · $600.00 per TON · qty 160.0 · bid tab
- 2025-12-16 · Iowa DOT · 90-C090-115 · $600.00 per TON · qty 107.0 · bid tab
|
| concrete pavement | SY | 2 | $77.60 | $65.20 to $90.00 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $65.20 per SY · qty 12616.9 · bid tab
- 2024-10-15 · Iowa DOT · 90-0347-148 · $90.00 per SY · qty 464.6 · bid tab
|
| excavation embankment | CY | 10 | $17.62 | $2.00 to $40.00 | Bids- 2026-02-17 · Iowa DOT · 90-0632-176 · $25.00 per CY · qty 830.0 · bid tab
- 2025-12-16 · Iowa DOT · 90-0632-172 · $2.00 per CY · qty 2803.0 · bid tab
- 2025-12-16 · Iowa DOT · 90-0632-172 · $21.00 per CY · qty 8093.0 · bid tab
- 2025-11-18 · Iowa DOT · 90-0635-502 · $40.00 per CY · qty 35.3 · bid tab
- 2025-11-18 · Iowa DOT · 90-1491-102 · $25.00 per CY · qty 225.0 · bid tab
- 2025-08-19 · Iowa DOT · 90-C090-107 · $8.30 per CY · qty 2300.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $8.24 per CY · qty 970.0 · bid tab
- 2024-10-15 · Iowa DOT · 90-0347-148 · $5.00 per CY · qty 1065.0 · bid tab
- 2024-10-15 · Iowa DOT · 90-0347-148 · $14.25 per CY · qty 7078.0 · bid tab
- 2024-05-21 · Iowa DOT · 90-0347-150 · $35.00 per CY · qty 500.0 · bid tab
|
| inlet headwall | EACH | 1 | $3,090.00 | $3,090.00 to $3,090.00 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $3,090.00 per EACH · qty 2.0 · bid tab
|
| lime cement stabilization | ACRE | 5 | $515.00 | $300.00 to $650.00 | Bids- 2025-12-16 · Iowa DOT · 90-0632-172 · $650.00 per ACRE · qty 2.3 · bid tab
- 2025-11-18 · Iowa DOT · 90-1491-102 · $650.00 per ACRE · qty 0.5 · bid tab
- 2025-08-19 · Iowa DOT · 90-C090-107 · $350.00 per ACRE · qty 1.1 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $515.00 per ACRE · qty 2.4 · bid tab
- 2024-10-15 · Iowa DOT · 90-0347-148 · $300.00 per ACRE · qty 2.09 · bid tab
|
| lime cement stabilization | LF | 2 | $48.00 | $40.00 to $56.00 | Bids- 2025-12-16 · Iowa DOT · 90-0632-172 · $56.00 per LF · qty 200.0 · bid tab
- 2025-11-18 · Iowa DOT · 90-1491-102 · $40.00 per LF · qty 100.0 · bid tab
|
| manhole | EACH | 3 | $11,845.00 | $2,060.00 to $12,875.00 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $12,875.00 per EACH · qty 1.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $2,060.00 per EACH · qty 4.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $11,845.00 per EACH · qty 9.0 · bid tab
|
| sewer main 8-inch | LF | 2 | $102.23 | $65.40 to $139.05 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $139.05 per LF · qty 20.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $65.40 per LF · qty 2713.0 · bid tab
|
| sewer service | EACH | 1 | $51.50 | $51.50 to $51.50 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $51.50 per EACH · qty 16.0 · bid tab
|
| sewer service | LF | 1 | $66.95 | $66.95 to $66.95 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $66.95 per LF · qty 1832.0 · bid tab
|
| sidewalk | EACH | 7 | $6,750.00 | $4,600.00 to $12,500.00 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $6,750.00 per EACH · qty 11.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $4,600.00 per EACH · qty 2.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $5,250.00 per EACH · qty 1.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $5,000.00 per EACH · qty 3.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $7,000.00 per EACH · qty 2.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $9,250.00 per EACH · qty 12.0 · bid tab
- 2024-05-21 · Iowa DOT · 90-0347-150 · $12,500.00 per EACH · qty 2.0 · bid tab
|
| sidewalk | SY | 3 | $63.86 | $51.50 to $72.10 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $63.86 per SY · qty 1677.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $72.10 per SY · qty 82.5 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $51.50 per SY · qty 619.1 · bid tab
|
| storm pipe 15-inch | LF | 1 | $61.80 | $61.80 to $61.80 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $61.80 per LF · qty 763.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $66.95 | $66.95 to $66.95 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $66.95 per LF · qty 303.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $82.40 | $82.40 to $82.40 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $82.40 per LF · qty 1194.0 · bid tab
|
| storm pipe 30-inch | LF | 1 | $149.35 | $149.35 to $149.35 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $149.35 per LF · qty 71.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $154.50 | $154.50 to $154.50 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $154.50 per LF · qty 316.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $257.50 | $257.50 to $257.50 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $257.50 per LF · qty 62.0 · bid tab
|
| water main 12-inch | LF | 1 | $77.25 | $77.25 to $77.25 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $77.25 per LF · qty 434.6 · bid tab
|
| water service | EACH | 4 | $1,017.12 | $566.50 to $1,442.00 | Bids- 2025-03-18 · Iowa DOT · 90-5825-650 · $1,416.25 per EACH · qty 3.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $618.00 per EACH · qty 3.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $566.50 per EACH · qty 3.0 · bid tab
- 2025-03-18 · Iowa DOT · 90-5825-650 · $1,442.00 per EACH · qty 3.0 · bid tab
|