Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSY1$95.00$95.00 to $95.00
Bids
  • 2024-01-17 · Iowa DOT · 70-0224-079 · $95.00 per SY · qty 309.4 · bid tab
asphalt pavementTON1$220.00$220.00 to $220.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $220.00 per TON · qty 93.0 · bid tab
concrete pavementEACH1$1.00$1.00 to $1.00
Bids
  • 2026-08-18 · Iowa DOT · 70-C070-078 · $1.00 per EACH · qty 12855.0 · bid tab
concrete pavementLS2$5,500.00$3,000.00 to $8,000.00
Bids
  • 2026-08-18 · Iowa DOT · 70-C070-078 · $8,000.00 per LS · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $3,000.00 per LS · qty 1.0 · bid tab
concrete pavementSY3$64.00$62.20 to $69.70
Bids
  • 2026-08-18 · Iowa DOT · 70-C070-078 · $62.20 per SY · qty 17140.0 · bid tab
  • 2026-08-18 · Iowa DOT · 70-C070-078 · $69.70 per SY · qty 635.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $64.00 per SY · qty 22286.0 · bid tab
curb gutterEACH1$22.00$22.00 to $22.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $22.00 per EACH · qty 50.0 · bid tab
curb gutterLF1$16.00$16.00 to $16.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $16.00 per LF · qty 720.0 · bid tab
excavation embankmentCY7$10.00$4.50 to $25.00
Bids
  • 2026-08-18 · Iowa DOT · 70-C070-078 · $4.75 per CY · qty 714.0 · bid tab
  • 2025-12-16 · Iowa DOT · 70-C070-073 · $4.50 per CY · qty 262.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $10.00 per CY · qty 44887.0 · bid tab
  • 2024-07-16 · Iowa DOT · 70-C070-071 · $19.40 per CY · qty 1422.0 · bid tab
  • 2024-07-16 · Iowa DOT · 70-C070-071 · $15.00 per CY · qty 100.0 · bid tab
  • 2024-07-16 · Iowa DOT · 70-C070-071 · $7.00 per CY · qty 511.0 · bid tab
  • 2024-01-17 · Iowa DOT · 70-0224-079 · $25.00 per CY · qty 92.0 · bid tab
fire hydrantEACH1$8,500.00$8,500.00 to $8,500.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $8,500.00 per EACH · qty 8.0 · bid tab
lime cement stabilizationACRE4$400.00$250.00 to $1,190.00
Bids
  • 2026-08-18 · Iowa DOT · 70-C070-078 · $500.00 per ACRE · qty 0.5 · bid tab
  • 2025-12-16 · Iowa DOT · 70-C070-073 · $300.00 per ACRE · qty 0.6 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $1,190.00 per ACRE · qty 4.0 · bid tab
  • 2024-07-16 · Iowa DOT · 70-C070-071 · $250.00 per ACRE · qty 1.65 · bid tab
lime cement stabilizationLF1$20.00$20.00 to $20.00
Bids
  • 2024-01-17 · Iowa DOT · 70-0224-079 · $20.00 per LF · qty 200.0 · bid tab
lime cement stabilizationSY1$1.80$1.80 to $1.80
Bids
  • 2026-08-18 · Iowa DOT · 70-C070-078 · $1.80 per SY · qty 19508.5 · bid tab
manholeEACH4$8,700.00$1,550.00 to $14,000.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $14,000.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $4,400.00 per EACH · qty 2.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $13,000.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $1,550.00 per EACH · qty 10.0 · bid tab
sidewalkEACH10$7,500.00$2,000.00 to $12,000.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $8,000.00 per EACH · qty 4.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $8,000.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $9,000.00 per EACH · qty 5.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $7,000.00 per EACH · qty 2.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $7,000.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $2,000.00 per EACH · qty 6.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $4,000.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $6,000.00 per EACH · qty 3.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $12,000.00 per EACH · qty 9.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $9,000.00 per EACH · qty 26.0 · bid tab
sidewalkSY3$100.00$67.00 to $106.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $67.00 per SY · qty 4106.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $106.00 per SY · qty 10.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $100.00 per SY · qty 13.0 · bid tab
storm pipe 15-inchLF2$91.50$88.00 to $95.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $95.00 per LF · qty 263.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $88.00 per LF · qty 1425.0 · bid tab
storm pipe 18-inchLF2$103.00$91.00 to $115.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $115.00 per LF · qty 203.0 · bid tab
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $91.00 per LF · qty 188.0 · bid tab
storm pipe 24-inchLF1$120.00$120.00 to $120.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $120.00 per LF · qty 631.0 · bid tab
storm pipe 30-inchLF1$145.00$145.00 to $145.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $145.00 per LF · qty 1176.0 · bid tab
storm pipe 36-inchLF1$175.00$175.00 to $175.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $175.00 per LF · qty 834.0 · bid tab
storm pipe 42-inchLF1$240.00$240.00 to $240.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $240.00 per LF · qty 492.0 · bid tab
storm pipe 48-inchLF1$305.00$305.00 to $305.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $305.00 per LF · qty 105.0 · bid tab
storm pipe 60-inchLF1$615.00$615.00 to $615.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $615.00 per LF · qty 10.0 · bid tab
water main 16-inchLF1$760.00$760.00 to $760.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $760.00 per LF · qty 3.0 · bid tab
water main 6-inchLF1$71.00$71.00 to $71.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $71.00 per LF · qty 3877.0 · bid tab
water serviceLF1$50.00$50.00 to $50.00
Bids
  • 2025-01-22 · Iowa DOT · 70-8471-603 · $50.00 per LF · qty 295.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.