Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSY4$30.16$1.98 to $100.00
Bids
  • 2026-02-17 · Iowa DOT · 66-C066-091 · $1.98 per SY · qty 98550.2 · bid tab
  • 2025-12-16 · Iowa DOT · 66-0096-086 · $2.18 per SY · qty 286059.0 · bid tab
  • 2025-12-16 · Iowa DOT · 66-0096-086 · $58.14 per SY · qty 216.4 · bid tab
  • 2025-03-18 · Iowa DOT · 66-C066-088 · $100.00 per SY · qty 224.5 · bid tab
asphalt pavementTON3$59.80$35.57 to $469.93
Bids
  • 2025-12-16 · Iowa DOT · 66-0096-086 · $35.57 per TON · qty 30749.0 · bid tab
  • 2025-12-16 · Iowa DOT · 66-0096-086 · $469.93 per TON · qty 1262.71 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $59.80 per TON · qty 152.042 · bid tab
concrete pavementEACH1$1.00$1.00 to $1.00
Bids
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $1.00 per EACH · qty 5414.0 · bid tab
concrete pavementLS1$2,500.00$2,500.00 to $2,500.00
Bids
  • 2025-03-18 · Iowa DOT · 66-C066-086 · $2,500.00 per LS · qty 1.0 · bid tab
concrete pavementSY3$79.00$65.64 to $125.00
Bids
  • 2025-03-18 · Iowa DOT · 66-C066-086 · $65.64 per SY · qty 1436.0 · bid tab
  • 2025-03-18 · Iowa DOT · 66-C066-088 · $125.00 per SY · qty 146.6 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $79.00 per SY · qty 4627.1 · bid tab
curb gutterEACH2$30.00$30.00 to $30.00
Bids
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $30.00 per EACH · qty 50.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $30.00 per EACH · qty 68.0 · bid tab
curb gutterLF5$36.00$28.00 to $46.00
Bids
  • 2026-04-21 · Iowa DOT · 66-7250-602-A · $40.00 per LF · qty 270.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $46.00 per LF · qty 904.8 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $28.00 per LF · qty 108.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $28.00 per LF · qty 200.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $36.00 per LF · qty 1917.6 · bid tab
excavation embankmentCY5$15.00$10.00 to $30.00
Bids
  • 2026-04-21 · Iowa DOT · 66-7250-602-A · $10.00 per CY · qty 234.0 · bid tab
  • 2025-12-16 · Iowa DOT · 66-0096-086 · $30.00 per CY · qty 517.9 · bid tab
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $20.00 per CY · qty 5170.0 · bid tab
  • 2025-03-18 · Iowa DOT · 66-C066-088 · $12.00 per CY · qty 797.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $15.00 per CY · qty 464.0 · bid tab
lime cement stabilizationACRE2$980.00$980.00 to $980.00
Bids
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $980.00 per ACRE · qty 1.39 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $980.00 per ACRE · qty 3.18 · bid tab
lime cement stabilizationLF1$20.00$20.00 to $20.00
Bids
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $20.00 per LF · qty 150.0 · bid tab
manholeEACH3$4,600.00$3,000.00 to $7,133.00
Bids
  • 2026-04-21 · Iowa DOT · 66-7250-602-A · $4,600.00 per EACH · qty 1.0 · bid tab
  • 2025-12-16 · Iowa DOT · 66-0096-086 · $3,000.00 per EACH · qty 1.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $7,133.00 per EACH · qty 1.0 · bid tab
sidewalkEACH8$3,500.00$2,000.00 to $8,800.00
Bids
  • 2026-04-21 · Iowa DOT · 66-7250-602-A · $3,000.00 per EACH · qty 2.0 · bid tab
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $4,000.00 per EACH · qty 1.0 · bid tab
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $2,000.00 per EACH · qty 3.0 · bid tab
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $2,600.00 per EACH · qty 1.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $6,385.00 per EACH · qty 1.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $8,800.00 per EACH · qty 2.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $2,800.00 per EACH · qty 9.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $5,465.00 per EACH · qty 1.0 · bid tab
sidewalkSY16$82.00$58.00 to $190.00
Bids
  • 2026-04-21 · Iowa DOT · 66-7250-602-A · $84.00 per SY · qty 12.0 · bid tab
  • 2026-04-21 · Iowa DOT · 66-7250-602-A · $80.00 per SY · qty 73.0 · bid tab
  • 2026-04-21 · Iowa DOT · 66-7250-602-A · $82.00 per SY · qty 134.0 · bid tab
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $190.00 per SY · qty 780.0 · bid tab
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $68.00 per SY · qty 276.0 · bid tab
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $58.00 per SY · qty 7996.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $89.00 per SY · qty 642.8 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $82.00 per SY · qty 1425.3 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $82.00 per SY · qty 283.6 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $74.00 per SY · qty 3194.2 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed)
storm pipe 15-inchLF2$65.50$50.00 to $81.00
Bids
  • 2026-04-21 · Iowa DOT · 66-7250-602-A · $81.00 per LF · qty 118.0 · bid tab
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $50.00 per LF · qty 101.0 · bid tab
storm pipe 18-inchLF1$88.00$88.00 to $88.00
Bids
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $88.00 per LF · qty 38.0 · bid tab
storm pipe 24-inchLF2$89.25$76.50 to $102.00
Bids
  • 2025-12-16 · Iowa DOT · 66-0096-086 · $76.50 per LF · qty 80.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $102.00 per LF · qty 318.0 · bid tab
storm pipe 27-inchLF1$117.00$117.00 to $117.00
Bids
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $117.00 per LF · qty 183.0 · bid tab
storm pipe 6-inchLF1$38.00$38.00 to $38.00
Bids
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $38.00 per LF · qty 63.0 · bid tab
storm pipe 8-inchLF1$40.00$40.00 to $40.00
Bids
  • 2025-05-20 · Iowa DOT · 66-C066-085 · $40.00 per LF · qty 178.0 · bid tab
water serviceEACH2$150.00$150.00 to $150.00
Bids
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $150.00 per EACH · qty 30.0 · bid tab
  • 2024-11-19 · Iowa DOT · 66-0096-084 · $150.00 per EACH · qty 50.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.