| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | SY | 1 | $70.00 | $70.00 to $70.00 | Bids- 2025-01-22 · Iowa DOT · 65-0291-147 · $70.00 per SY · qty 189.88 · bid tab
|
| asphalt pavement | TON | 10 | $59.25 | $48.50 to $63.50 | Bids- 2026-02-17 · Iowa DOT · 65-C065-124 · $58.00 per TON · qty 3030.0 · bid tab
- 2026-02-17 · Iowa DOT · 65-C065-124 · $57.00 per TON · qty 3364.0 · bid tab
- 2026-02-17 · Iowa DOT · 65-C065-124 · $61.00 per TON · qty 5115.0 · bid tab
- 2026-02-17 · Iowa DOT · 65-C065-124 · $57.50 per TON · qty 5115.0 · bid tab
- 2025-06-17 · Iowa DOT · 65-C065-123-A · $60.00 per TON · qty 951.971 · bid tab
- 2025-06-17 · Iowa DOT · 65-C065-123-A · $63.50 per TON · qty 2394.979 · bid tab
- 2025-06-17 · Iowa DOT · 65-C065-123-A · $63.50 per TON · qty 2299.775 · bid tab
- 2025-06-17 · Iowa DOT · 65-C065-123-A · $58.50 per TON · qty 2895.42 · bid tab
- 2025-01-22 · Iowa DOT · 65-0291-147 · $62.00 per TON · qty 15951.81 · bid tab
- 2024-03-19 · Iowa DOT · 65-C065-120 · $48.50 per TON · qty 1805.4 · bid tab
|
| concrete pavement | SY | 4 | $88.57 | $55.45 to $100.00 | Bids- 2026-03-17 · Iowa DOT · 65-0341-133 · $97.96 per SY · qty 2699.6 · bid tab
- 2025-11-18 · Iowa DOT · 65-0341-124 · $100.00 per SY · qty 2330.0 · bid tab
- 2025-07-15 · Iowa DOT · 65-7060-018 · $79.18 per SY · qty 6664.3 · bid tab
- 2025-07-15 · Iowa DOT · 65-7060-018 · $55.45 per SY · qty 12664.1 · bid tab
|
| curb gutter | EACH | 1 | $54.66 | $54.66 to $54.66 | Bids- 2025-07-15 · Iowa DOT · 65-7060-018 · $54.66 per EACH · qty 18.0 · bid tab
|
| curb gutter | LF | 1 | $20.77 | $20.77 to $20.77 | Bids- 2025-07-15 · Iowa DOT · 65-7060-018 · $20.77 per LF · qty 144.0 · bid tab
|
| excavation embankment | CY | 6 | $12.72 | $3.04 to $66.50 | Bids- 2026-03-17 · Iowa DOT · 65-0341-133 · $13.44 per CY · qty 2812.8 · bid tab
- 2026-03-17 · Iowa DOT · 65-0341-133 · $10.75 per CY · qty 1030.2 · bid tab
- 2025-11-18 · Iowa DOT · 65-0341-124 · $12.00 per CY · qty 370.0 · bid tab
- 2025-11-18 · Iowa DOT · 65-0341-124 · $30.00 per CY · qty 205.0 · bid tab
- 2025-07-15 · Iowa DOT · 65-7060-018 · $3.04 per CY · qty 21327.0 · bid tab
- 2025-01-22 · Iowa DOT · 65-0291-147 · $66.50 per CY · qty 125.0 · bid tab
|
| lime cement stabilization | ACRE | 2 | $438.79 | $382.59 to $495.00 | Bids- 2026-03-17 · Iowa DOT · 65-0341-133 · $495.00 per ACRE · qty 1.0 · bid tab
- 2025-07-15 · Iowa DOT · 65-7060-018 · $382.59 per ACRE · qty 5.85 · bid tab
|
| lime cement stabilization | LF | 1 | $86.00 | $86.00 to $86.00 | Bids- 2026-03-17 · Iowa DOT · 65-0341-133 · $86.00 per LF · qty 400.0 · bid tab
|
| sidewalk | EACH | 2 | $7,937.98 | $5,875.96 to $10,000.00 | Bids- 2025-11-18 · Iowa DOT · 65-0341-124 · $10,000.00 per EACH · qty 2.0 · bid tab
- 2025-07-15 · Iowa DOT · 65-7060-018 · $5,875.96 per EACH · qty 18.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $100.00 | $55.86 to $120.00 | Bids- 2025-11-18 · Iowa DOT · 65-0341-124 · $100.00 per LF · qty 220.0 · bid tab
- 2025-11-18 · Iowa DOT · 65-0341-124 · $120.00 per LF · qty 20.0 · bid tab
- 2025-07-15 · Iowa DOT · 65-7060-018 · $55.86 per LF · qty 1038.0 · bid tab
|
| storm pipe 24-inch | LF | 4 | $91.47 | $64.00 to $113.45 | Bids- 2025-07-15 · Iowa DOT · 65-7060-018 · $113.45 per LF · qty 30.0 · bid tab
- 2025-07-15 · Iowa DOT · 65-7060-018 · $94.38 per LF · qty 102.0 · bid tab
- 2025-07-15 · Iowa DOT · 65-7060-018 · $88.56 per LF · qty 141.0 · bid tab
- 2025-01-22 · Iowa DOT · 65-0291-147 · $64.00 per LF · qty 30.0 · bid tab
|
| storm pipe 30-inch | LF | 3 | $91.68 | $77.00 to $164.03 | Bids- 2025-07-15 · Iowa DOT · 65-7060-018 · $91.68 per LF · qty 40.0 · bid tab
- 2025-07-15 · Iowa DOT · 65-7060-018 · $164.03 per LF · qty 8.0 · bid tab
- 2025-01-22 · Iowa DOT · 65-0291-147 · $77.00 per LF · qty 78.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $88.00 | $88.00 to $88.00 | Bids- 2025-01-22 · Iowa DOT · 65-0291-147 · $88.00 per LF · qty 24.0 · bid tab
|
| storm pipe 42-inch | LF | 1 | $115.00 | $115.00 to $115.00 | Bids- 2025-01-22 · Iowa DOT · 65-0291-147 · $115.00 per LF · qty 18.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $305.32 | $305.32 to $305.32 | Bids- 2025-07-15 · Iowa DOT · 65-7060-018 · $305.32 per LF · qty 32.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 1 | $25.60 | $25.60 to $25.60 | Bids- 2025-01-22 · Iowa DOT · 65-0291-147 · $25.60 per LF · qty 250.0 · bid tab
|