Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSY9$75.00$7.32 to $105.00
Bids
  • 2024-12-17 · Iowa DOT · 63-0053-069 · $75.00 per SY · qty 465.2 · bid tab
  • 2024-11-19 · Iowa DOT · 63-0053-071 · $85.00 per SY · qty 389.9 · bid tab
  • 2024-11-19 · Iowa DOT · 63-0053-071 · $80.00 per SY · qty 1584.3 · bid tab
  • 2024-11-19 · Iowa DOT · 63-0143-060 · $79.00 per SY · qty 1240.9 · bid tab
  • 2024-02-20 · Iowa DOT · 63-1633-060 · $51.25 per SY · qty 1870.5 · bid tab
  • 2024-02-20 · Iowa DOT · 63-1633-060 · $31.40 per SY · qty 40667.7 · bid tab
  • 2024-02-20 · Iowa DOT · 63-C063-147 · $7.32 per SY · qty 972.0 · bid tab
  • 2024-02-20 · Iowa DOT · 63-C063-147 · $38.66 per SY · qty 1292.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-0926-038 · $105.00 per SY · qty 392.2 · bid tab
asphalt pavementTON3$59.52$58.57 to $71.71
Bids
  • 2025-04-15 · Iowa DOT · 63-C063-150 · $71.71 per TON · qty 1900.0 · bid tab
  • 2025-01-22 · Iowa DOT · 63-C063-149 · $59.52 per TON · qty 3600.0 · bid tab
  • 2024-02-20 · Iowa DOT · 63-C063-147 · $58.57 per TON · qty 5962.0 · bid tab
concrete pavementLS1$9,900.00$9,900.00 to $9,900.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $9,900.00 per LS · qty 1.0 · bid tab
concrete pavementSY5$83.00$65.75 to $174.00
Bids
  • 2024-11-19 · Iowa DOT · 63-0143-060 · $90.00 per SY · qty 624.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $82.00 per SY · qty 3695.3 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $83.00 per SY · qty 484.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $174.00 per SY · qty 239.5 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $65.75 per SY · qty 2191.9 · bid tab
curb gutterLF3$38.50$33.30 to $41.60
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $33.30 per LF · qty 117.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $41.60 per LF · qty 35.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $38.50 per LF · qty 1662.0 · bid tab
excavation embankmentCY11$12.60$5.75 to $250.00
Bids
  • 2025-11-18 · Iowa DOT · 63-C063-151 · $12.60 per CY · qty 387.0 · bid tab
  • 2025-11-18 · Iowa DOT · 63-C063-151 · $27.50 per CY · qty 734.0 · bid tab
  • 2024-12-17 · Iowa DOT · 63-0053-069 · $6.70 per CY · qty 1508.0 · bid tab
  • 2024-12-17 · Iowa DOT · 63-0053-069 · $19.30 per CY · qty 197.0 · bid tab
  • 2024-11-19 · Iowa DOT · 63-0053-071 · $40.00 per CY · qty 74.2 · bid tab
  • 2024-11-19 · Iowa DOT · 63-0143-060 · $5.75 per CY · qty 19535.0 · bid tab
  • 2024-02-20 · Iowa DOT · 63-1633-060 · $250.00 per CY · qty 5.0 · bid tab
  • 2024-02-20 · Iowa DOT · 63-1633-060 · $12.00 per CY · qty 1438.0 · bid tab
  • 2024-02-20 · Iowa DOT · 63-1633-060 · $12.00 per CY · qty 827.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-0926-038 · $40.00 per CY · qty 80.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
fire hydrantEACH1$6,760.00$6,760.00 to $6,760.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $6,760.00 per EACH · qty 3.0 · bid tab
lime cement stabilizationACRE2$300.00$300.00 to $300.00
Bids
  • 2024-12-17 · Iowa DOT · 63-0053-069 · $300.00 per ACRE · qty 0.6 · bid tab
  • 2024-02-20 · Iowa DOT · 63-1633-060 · $300.00 per ACRE · qty 3.0 · bid tab
lime cement stabilizationLF4$56.25$35.00 to $75.00
Bids
  • 2024-12-17 · Iowa DOT · 63-0053-069 · $75.00 per LF · qty 200.0 · bid tab
  • 2024-11-19 · Iowa DOT · 63-0143-060 · $55.50 per LF · qty 200.0 · bid tab
  • 2024-02-20 · Iowa DOT · 63-1633-060 · $35.00 per LF · qty 200.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $57.00 per LF · qty 600.0 · bid tab
lime cement stabilizationSY1$5.20$5.20 to $5.20
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $5.20 per SY · qty 1000.0 · bid tab
manholeEACH2$9,100.00$6,760.00 to $11,440.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $6,760.00 per EACH · qty 2.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $11,440.00 per EACH · qty 1.0 · bid tab
sewer main 10-inchLF1$88.40$88.40 to $88.40
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $88.40 per LF · qty 1038.0 · bid tab
sewer main 18-inchLF1$260.00$260.00 to $260.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $260.00 per LF · qty 62.0 · bid tab
sewer main 8-inchLF1$208.00$208.00 to $208.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $208.00 per LF · qty 68.5 · bid tab
sewer serviceEACH1$3,950.00$3,950.00 to $3,950.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $3,950.00 per EACH · qty 5.0 · bid tab
sewer serviceLF2$101.40$93.60 to $109.20
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $109.20 per LF · qty 1400.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $93.60 per LF · qty 160.0 · bid tab
sidewalkEACH3$4,160.00$1,404.00 to $6,240.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $1,404.00 per EACH · qty 64.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $6,240.00 per EACH · qty 5.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $4,160.00 per EACH · qty 2.0 · bid tab
sidewalkSF1$47.00$47.00 to $47.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $47.00 per SF · qty 122.0 · bid tab
sidewalkSY8$73.75$44.75 to $157.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $65.50 per SY · qty 554.5 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $157.00 per SY · qty 173.6 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $105.00 per SY · qty 188.8 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $89.45 per SY · qty 1044.2 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $44.75 per SY · qty 173.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $82.00 per SY · qty 5.3 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $62.40 per SY · qty 318.6 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $58.25 per SY · qty 667.5 · bid tab
storm pipe 15-inchLF1$135.20$135.20 to $135.20
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $135.20 per LF · qty 179.8 · bid tab
storm pipe 24-inchLF1$225.00$225.00 to $225.00
Bids
  • 2024-02-20 · Iowa DOT · 63-1633-060 · $225.00 per LF · qty 24.0 · bid tab
water main 10-inchLF1$156.00$156.00 to $156.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $156.00 per LF · qty 325.2 · bid tab
water main 4-inchLF1$239.00$239.00 to $239.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $239.00 per LF · qty 95.0 · bid tab
water main 6-inchLF1$249.00$249.00 to $249.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $249.00 per LF · qty 43.0 · bid tab
water main 8-inchLF1$114.00$114.00 to $114.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $114.00 per LF · qty 785.5 · bid tab
water serviceEACH2$754.00$572.00 to $936.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $936.00 per EACH · qty 27.0 · bid tab
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $572.00 per EACH · qty 27.0 · bid tab
water serviceLF1$27.00$27.00 to $27.00
Bids
  • 2024-01-17 · Iowa DOT · 63-4040-613 · $27.00 per LF · qty 1057.5 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.