| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | SY | 13 | $34.39 | $1.94 to $68.62 | Bids- 2026-03-17 · Iowa DOT · 55-C055-213 · $41.53 per SY · qty 292.0 · bid tab
- 2026-03-17 · Iowa DOT · 55-C055-213 · $38.46 per SY · qty 182.0 · bid tab
- 2026-03-17 · Iowa DOT · 55-C055-213 · $1.94 per SY · qty 87347.0 · bid tab
- 2026-03-17 · Iowa DOT · 55-C055-213 · $68.62 per SY · qty 47.0 · bid tab
- 2026-03-17 · Iowa DOT · 55-C055-213 · $40.92 per SY · qty 277.8 · bid tab
- 2025-05-20 · Iowa DOT · 55-0183-116 · $2.23 per SY · qty 79737.9 · bid tab
- 2025-03-18 · Iowa DOT · 55-C055-211 · $17.93 per SY · qty 5063.0 · bid tab
- 2025-03-18 · Iowa DOT · 55-C055-211 · $22.33 per SY · qty 1513.0 · bid tab
- 2025-03-18 · Iowa DOT · 55-C055-211 · $47.64 per SY · qty 208.0 · bid tab
- 2024-03-19 · Iowa DOT · 55-C055-206 · $1.95 per SY · qty 88865.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed) |
| asphalt pavement | TON | 5 | $571.67 | $49.10 to $639.49 | Bids- 2026-03-17 · Iowa DOT · 55-C055-213 · $79.05 per TON · qty 125.7 · bid tab
- 2026-03-17 · Iowa DOT · 55-C055-213 · $639.49 per TON · qty 384.0 · bid tab
- 2025-05-20 · Iowa DOT · 55-0183-116 · $597.90 per TON · qty 352.6 · bid tab
- 2025-03-18 · Iowa DOT · 55-C055-211 · $49.10 per TON · qty 526.0 · bid tab
- 2024-03-19 · Iowa DOT · 55-C055-206 · $571.67 per TON · qty 391.0 · bid tab
|
| excavation embankment | CY | 1 | $6.00 | $6.00 to $6.00 | Bids- 2025-05-20 · Iowa DOT · 55-0183-116 · $6.00 per CY · qty 27592.0 · bid tab
|
| lime cement stabilization | ACRE | 1 | $120.00 | $120.00 to $120.00 | Bids- 2025-05-20 · Iowa DOT · 55-0183-116 · $120.00 per ACRE · qty 21.66 · bid tab
|
| storm pipe 15-inch | LF | 1 | $45.00 | $45.00 to $45.00 | Bids- 2025-05-20 · Iowa DOT · 55-0183-116 · $45.00 per LF · qty 32.0 · bid tab
|
| storm pipe 18-inch | LF | 2 | $87.50 | $50.00 to $125.00 | Bids- 2025-05-20 · Iowa DOT · 55-0183-116 · $50.00 per LF · qty 192.0 · bid tab
- 2025-05-20 · Iowa DOT · 55-0183-116 · $125.00 per LF · qty 12.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $155.00 | $155.00 to $155.00 | Bids- 2025-05-20 · Iowa DOT · 55-0183-116 · $155.00 per LF · qty 44.0 · bid tab
|
| storm pipe 30-inch | LF | 1 | $170.00 | $170.00 to $170.00 | Bids- 2025-05-20 · Iowa DOT · 55-0183-116 · $170.00 per LF · qty 34.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $180.00 | $180.00 to $180.00 | Bids- 2025-05-20 · Iowa DOT · 55-0183-116 · $180.00 per LF · qty 186.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $240.00 | $240.00 to $240.00 | Bids- 2025-05-20 · Iowa DOT · 55-0183-116 · $240.00 per LF · qty 48.0 · bid tab
|