Site-work prices, Keokuk County, IA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSY7$90.00$25.27 to $134.14
Bids
  • 2026-06-16 · Iowa DOT · 54-0211-046-A · $112.00 per SY · qty 384.3 · bid tab
  • 2026-01-21 · Iowa DOT · 54-0928-042 · $90.00 per SY · qty 796.0 · bid tab
  • 2025-01-22 · Iowa DOT · 54-1491-080 · $25.27 per SY · qty 48760.3 · bid tab
  • 2025-01-22 · Iowa DOT · 54-1491-080 · $69.43 per SY · qty 617.8 · bid tab
  • 2025-01-22 · Iowa DOT · 54-1491-080 · $134.14 per SY · qty 591.8 · bid tab
  • 2025-01-22 · Iowa DOT · 54-1491-080 · $120.23 per SY · qty 115.6 · bid tab
  • 2025-01-22 · Iowa DOT · 54-1491-080 · $57.76 per SY · qty 88.9 · bid tab
asphalt pavementTON1$46.00$46.00 to $46.00
Bids
  • 2026-06-16 · Iowa DOT · 54-0211-046-A · $46.00 per TON · qty 331.9 · bid tab
concrete pavementSY2$128.50$115.00 to $142.00
Bids
  • 2026-07-21 · Iowa DOT · 54-0928-044 · $115.00 per SY · qty 525.4 · bid tab
  • 2026-06-16 · Iowa DOT · 54-0211-046-A · $142.00 per SY · qty 251.9 · bid tab
curb gutterLF1$110.00$110.00 to $110.00
Bids
  • 2025-01-22 · Iowa DOT · 54-1491-080 · $110.00 per LF · qty 10.0 · bid tab
excavation embankmentCY7$11.00$8.00 to $50.00
Bids
  • 2026-07-21 · Iowa DOT · 54-0928-044 · $11.00 per CY · qty 411.0 · bid tab
  • 2026-06-16 · Iowa DOT · 54-0211-046-A · $10.00 per CY · qty 792.0 · bid tab
  • 2026-02-17 · Iowa DOT · 54-0781-026-A · $8.00 per CY · qty 1981.0 · bid tab
  • 2026-02-17 · Iowa DOT · 54-0781-026-A · $13.00 per CY · qty 277.0 · bid tab
  • 2025-01-22 · Iowa DOT · 54-0928-041 · $50.00 per CY · qty 122.6 · bid tab
  • 2025-01-22 · Iowa DOT · 54-1491-080 · $22.00 per CY · qty 361.2 · bid tab
  • 2024-11-19 · Iowa DOT · 54-C054-122 · $9.20 per CY · qty 7224.0 · bid tab
lime cement stabilizationACRE3$450.00$320.00 to $500.00
Bids
  • 2026-06-16 · Iowa DOT · 54-0211-046-A · $320.00 per ACRE · qty 2.0 · bid tab
  • 2026-02-17 · Iowa DOT · 54-0781-026-A · $450.00 per ACRE · qty 1.1 · bid tab
  • 2025-01-22 · Iowa DOT · 54-1491-080 · $500.00 per ACRE · qty 1.0 · bid tab
lime cement stabilizationLF3$56.00$55.00 to $61.00
Bids
  • 2026-06-16 · Iowa DOT · 54-0211-046-A · $56.00 per LF · qty 400.0 · bid tab
  • 2026-02-17 · Iowa DOT · 54-0781-026-A · $61.00 per LF · qty 200.0 · bid tab
  • 2024-08-20 · Iowa DOT · 54-0215-505 · $55.00 per LF · qty 200.0 · bid tab
storm pipe 24-inchLF3$79.00$75.00 to $82.00
Bids
  • 2024-11-19 · Iowa DOT · 54-C054-122 · $75.00 per LF · qty 1050.0 · bid tab
  • 2024-11-19 · Iowa DOT · 54-C054-122 · $82.00 per LF · qty 302.0 · bid tab
  • 2024-11-19 · Iowa DOT · 54-C054-122 · $79.00 per LF · qty 238.0 · bid tab
storm pipe 30-inchLF1$99.00$99.00 to $99.00
Bids
  • 2024-11-19 · Iowa DOT · 54-C054-122 · $99.00 per LF · qty 232.0 · bid tab
storm pipe 36-inchLF1$122.00$122.00 to $122.00
Bids
  • 2024-11-19 · Iowa DOT · 54-C054-122 · $122.00 per LF · qty 204.0 · bid tab
storm pipe 48-inchLF2$242.50$235.00 to $250.00
Bids
  • 2026-07-21 · Iowa DOT · 54-0928-044 · $250.00 per LF · qty 392.0 · bid tab
  • 2026-07-21 · Iowa DOT · 54-0928-044 · $235.00 per LF · qty 172.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.