| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | SY | 7 | $59.00 | $1.72 to $235.35 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $42.00 per SY · qty 5491.5 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-144 · $30.00 per SY · qty 10364.7 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-144 · $59.00 per SY · qty 881.7 · bid tab
- 2024-08-06 · Iowa DOT · 50-0805-402 · $84.35 per SY · qty 776.7 · bid tab
- 2024-01-17 · Iowa DOT · 50-0144-069 · $1.72 per SY · qty 151862.5 · bid tab
- 2024-01-17 · Iowa DOT · 50-0144-069 · $77.00 per SY · qty 1046.5 · bid tab
- 2024-01-17 · Iowa DOT · 50-0805-382-A · $235.35 per SY · qty 334.0 · bid tab
|
| asphalt pavement | TON | 8 | $67.08 | $58.00 to $90.00 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $80.00 per TON · qty 4531.1 · bid tab
- 2026-04-21 · Iowa DOT · 50-C050-154 · $90.00 per TON · qty 1171.2 · bid tab
- 2024-12-17 · Iowa DOT · 50-C050-138-A · $58.00 per TON · qty 1040.0 · bid tab
- 2024-12-17 · Iowa DOT · 50-C050-139-A · $63.15 per TON · qty 586.0 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-140 · $61.35 per TON · qty 1028.0 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-140 · $71.35 per TON · qty 1028.0 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-144 · $60.00 per TON · qty 2441.1 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-144 · $71.00 per TON · qty 2291.4 · bid tab
|
| concrete pavement | EACH | 1 | $35,904.00 | $35,904.00 to $35,904.00 | Bids- 2024-01-17 · Iowa DOT · 50-0805-382-A · $35,904.00 per EACH · qty 1.0 · bid tab
|
| concrete pavement | LB | 1 | $1.00 | $1.00 to $1.00 | Bids- 2024-01-17 · Iowa DOT · 50-0805-382-A · $1.00 per LB · qty 21553.6 · bid tab
|
| concrete pavement | LS | 2 | $3,750.00 | $2,500.00 to $5,000.00 | Bids- 2025-06-17 · Iowa DOT · 50-C050-133 · $5,000.00 per LS · qty 1.0 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-144 · $2,500.00 per LS · qty 1.0 · bid tab
|
| concrete pavement | MILE | 1 | $16,500.00 | $16,500.00 to $16,500.00 | Bids- 2024-01-17 · Iowa DOT · 50-0805-382-A · $16,500.00 per MILE · qty 10.1 · bid tab
|
| concrete pavement | SY | 4 | $94.50 | $86.75 to $165.00 | Bids- 2026-05-19 · Iowa DOT · 50-C050-151-A · $95.00 per SY · qty 1478.2 · bid tab
- 2026-03-17 · Iowa DOT · 50-0064-200 · $165.00 per SY · qty 248.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $86.75 per SY · qty 795.0 · bid tab
- 2025-01-22 · Iowa DOT · 50-C050-132 · $94.00 per SY · qty 96.7 · bid tab
|
| curb gutter | EACH | 1 | $25.00 | $25.00 to $25.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $25.00 per EACH · qty 4.0 · bid tab
|
| curb gutter | LF | 3 | $40.00 | $25.00 to $40.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $40.00 per LF · qty 1847.2 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $40.00 per LF · qty 500.0 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $25.00 per LF · qty 16.0 · bid tab
|
| excavation embankment | CY | 15 | $11.00 | $3.75 to $45.00 | Bids- 2026-07-21 · Iowa DOT · 50-164 · $35.00 per CY · qty 150.0 · bid tab
- 2026-07-21 · Iowa DOT · 50-164 · $45.00 per CY · qty 250.0 · bid tab
- 2026-05-19 · Iowa DOT · 50-C050-151-A · $12.75 per CY · qty 1882.0 · bid tab
- 2026-04-21 · Iowa DOT · 50-C050-154 · $3.75 per CY · qty 38187.9 · bid tab
- 2026-04-21 · Iowa DOT · 50-C050-154 · $11.00 per CY · qty 15711.6 · bid tab
- 2026-04-21 · Iowa DOT · 50-C050-154 · $25.00 per CY · qty 305.1 · bid tab
- 2026-03-17 · Iowa DOT · 50-0064-200 · $7.25 per CY · qty 312.0 · bid tab
- 2026-03-17 · Iowa DOT · 50-0064-200 · $17.50 per CY · qty 2843.0 · bid tab
- 2025-11-18 · Iowa DOT · 50-C050-150 · $30.00 per CY · qty 270.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $7.15 per CY · qty 7679.0 · bid tab
(10 most recent of 15 shown; all in the Hubstake feed) |
| lime cement stabilization | ACRE | 3 | $450.00 | $200.00 to $1,250.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $1,250.00 per ACRE · qty 1.0 · bid tab
- 2025-11-18 · Iowa DOT · 50-C050-150 · $450.00 per ACRE · qty 1.17 · bid tab
- 2025-01-22 · Iowa DOT · 50-C050-132 · $200.00 per ACRE · qty 3.5 · bid tab
|
| lime cement stabilization | LF | 1 | $30.00 | $30.00 to $30.00 | Bids- 2026-09-15 · Iowa DOT · 50-3301-034 · $30.00 per LF · qty 100.0 · bid tab
|
| lime cement stabilization | MGAL | 2 | $24.32 | $13.65 to $35.00 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $35.00 per MGAL · qty 50.9 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $13.65 per MGAL · qty 256.0 · bid tab
|
| lime cement stabilization | SY | 4 | $4.25 | $2.59 to $4.50 | Bids- 2026-07-21 · Iowa DOT · 50-164 · $4.50 per SY · qty 6376.5 · bid tab
- 2026-07-21 · Iowa DOT · 50-164 · $4.50 per SY · qty 8902.1 · bid tab
- 2026-04-21 · Iowa DOT · 50-C050-154 · $2.59 per SY · qty 13320.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $4.00 per SY · qty 67033.0 · bid tab
|
| lime cement stabilization | TON | 3 | $185.00 | $179.52 to $195.00 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $195.00 per TON · qty 424.4 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $179.52 per TON · qty 2136.0 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-140 · $185.00 per TON · qty 656.0 · bid tab
|
| manhole | EACH | 1 | $8,750.00 | $8,750.00 to $8,750.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $8,750.00 per EACH · qty 1.0 · bid tab
|
| sidewalk | EACH | 2 | $5,250.00 | $4,500.00 to $6,000.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $6,000.00 per EACH · qty 3.0 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $4,500.00 per EACH · qty 4.0 · bid tab
|
| sidewalk | SY | 6 | $80.00 | $65.00 to $115.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $115.00 per SY · qty 312.8 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $85.00 per SY · qty 1479.4 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $75.00 per SY · qty 1270.7 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $75.00 per SY · qty 271.4 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $90.00 per SY · qty 119.9 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $65.00 per SY · qty 320.1 · bid tab
|
| storm pipe 12-inch | LF | 1 | $120.00 | $120.00 to $120.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $120.00 per LF · qty 74.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $130.00 | $130.00 to $130.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $130.00 per LF · qty 63.5 · bid tab
|
| storm pipe 18-inch | LF | 6 | $69.00 | $50.00 to $216.62 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $50.00 per LF · qty 58.3 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $170.00 per LF · qty 32.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $59.49 per LF · qty 66.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $216.62 per LF · qty 10.0 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-144 · $73.00 per LF · qty 125.0 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-144 · $65.00 per LF · qty 53.0 · bid tab
|
| storm pipe 24-inch | LF | 4 | $113.30 | $62.75 to $307.17 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $105.00 per LF · qty 130.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $121.60 per LF · qty 4.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $307.17 per LF · qty 22.0 · bid tab
- 2025-01-22 · Iowa DOT · 50-C050-132 · $62.75 per LF · qty 46.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $468.06 | $450.00 to $486.11 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $450.00 per LF · qty 18.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $486.11 per LF · qty 4.0 · bid tab
|
| storm pipe 36-inch | LF | 3 | $115.55 | $77.85 to $465.00 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $465.00 per LF · qty 21.5 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $115.55 per LF · qty 62.0 · bid tab
- 2025-01-22 · Iowa DOT · 50-C050-132 · $77.85 per LF · qty 104.0 · bid tab
|
| storm pipe 42-inch | LF | 2 | $542.71 | $511.42 to $574.00 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $574.00 per LF · qty 8.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $511.42 per LF · qty 5.0 · bid tab
|
| storm pipe 48-inch | LF | 3 | $315.00 | $230.00 to $600.00 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $600.00 per LF · qty 15.0 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-144 · $315.00 per LF · qty 12.0 · bid tab
- 2024-11-19 · Iowa DOT · 50-C050-144 · $230.00 per LF · qty 14.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $625.00 | $625.00 to $625.00 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $625.00 per LF · qty 43.0 · bid tab
|
| storm pipe 8-inch | LF | 1 | $50.00 | $50.00 to $50.00 | Bids- 2026-05-19 · Iowa DOT · 50-C050-151-A · $50.00 per LF · qty 118.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 3 | $905.00 | $44.05 to $1,893.00 | Bids- 2026-04-21 · Iowa DOT · 50-C050-154 · $1,893.00 per LF · qty 180.0 · bid tab
- 2026-03-17 · Iowa DOT · 50-0064-200 · $905.00 per LF · qty 142.0 · bid tab
- 2025-06-17 · Iowa DOT · 50-C050-133 · $44.05 per LF · qty 416.0 · bid tab
|
| water service | EACH | 2 | $700.00 | $250.00 to $1,150.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $250.00 per EACH · qty 28.0 · bid tab
- 2026-01-21 · Iowa DOT · 50-1171-038 · $1,150.00 per EACH · qty 5.0 · bid tab
|
| water service | LF | 1 | $250.00 | $250.00 to $250.00 | Bids- 2026-01-21 · Iowa DOT · 50-1171-038 · $250.00 per LF · qty 90.0 · bid tab
|