PadstakeGet the fee reports
Menu

Site-work prices, Franklin County, IA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSY1$2.20$2.20 to $2.20
Bids
  • 2024-11-19 · Iowa DOT · 35-0035-096 · $2.20 per SY · qty 97919.7 · bid tab
asphalt pavementTON5$45.10$40.42 to $560.00
Bids
  • 2026-02-17 · Iowa DOT · 35-C035-123 · $49.36 per TON · qty 8330.0 · bid tab
  • 2024-11-19 · Iowa DOT · 35-0035-096 · $40.42 per TON · qty 11899.0 · bid tab
  • 2024-11-19 · Iowa DOT · 35-0035-096 · $560.00 per TON · qty 429.85 · bid tab
  • 2024-03-19 · Iowa DOT · 35-C035-121 · $43.53 per TON · qty 4290.0 · bid tab
  • 2024-03-19 · Iowa DOT · 35-C035-121 · $45.10 per TON · qty 5612.0 · bid tab
concrete pavementEACH4$1.00$1.00 to $1.00
Bids
  • 2025-10-22 · Iowa DOT · 35-0356-143 · $1.00 per EACH · qty 112195.28 · bid tab
  • 2025-10-22 · Iowa DOT · 35-0356-143 · $1.00 per EACH · qty 71920.05 · bid tab
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $1.00 per EACH · qty 71916.1 · bid tab
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $1.00 per EACH · qty 112189.1 · bid tab
concrete pavementSY2$44.39$43.86 to $44.93
Bids
  • 2025-10-22 · Iowa DOT · 35-0356-143 · $44.93 per SY · qty 95893.4 · bid tab
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $43.86 per SY · qty 95888.1 · bid tab
excavation embankmentCY4$12.50$2.55 to $80.00
Bids
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $3.85 per CY · qty 6217.5 · bid tab
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $21.15 per CY · qty 3670.0 · bid tab
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $2.55 per CY · qty 19256.4 · bid tab
  • 2024-11-19 · Iowa DOT · 35-0035-096 · $80.00 per CY · qty 88.0 · bid tab
lime cement stabilizationACRE1$250.00$250.00 to $250.00
Bids
  • 2025-10-22 · Iowa DOT · 35-0356-143 · $250.00 per ACRE · qty 9.6 · bid tab
lime cement stabilizationLF1$49.55$49.55 to $49.55
Bids
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $49.55 per LF · qty 400.0 · bid tab
lime cement stabilizationSY3$1.90$1.43 to $20.00
Bids
  • 2025-10-22 · Iowa DOT · 35-0356-143 · $20.00 per SY · qty 445.0 · bid tab
  • 2025-10-22 · Iowa DOT · 35-0356-143 · $1.90 per SY · qty 156011.2 · bid tab
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $1.43 per SY · qty 156006.5 · bid tab
storm pipe 18-inchLF1$31.50$31.50 to $31.50
Bids
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $31.50 per LF · qty 388.0 · bid tab
storm pipe 24-inchLF3$73.00$60.00 to $150.00
Bids
  • 2025-10-22 · Iowa DOT · 35-0356-143 · $60.00 per LF · qty 35.0 · bid tab
  • 2025-10-22 · Iowa DOT · 35-0356-143 · $150.00 per LF · qty 336.0 · bid tab
  • 2025-02-18 · Iowa DOT · 35-0356-140 · $73.00 per LF · qty 1446.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.