| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | SY | 6 | $37.95 | $29.85 to $84.00 | Bids- 2026-02-17 · Iowa DOT · 31-C031-128 · $29.85 per SY · qty 12243.9 · bid tab
- 2025-10-22 · Iowa DOT · 31-0209-286 · $84.00 per SY · qty 1491.8 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $59.00 per SY · qty 621.8 · bid tab
- 2024-12-17 · Iowa DOT · 31-C031-123 · $31.85 per SY · qty 15652.3 · bid tab
- 2024-11-19 · Iowa DOT · 31-0209-281 · $34.10 per SY · qty 1889.0 · bid tab
- 2024-05-21 · Iowa DOT · 31-0209-275 · $41.80 per SY · qty 404.0 · bid tab
|
| asphalt pavement | TON | 26 | $69.62 | $50.40 to $192.87 | Bids- 2026-04-21 · Iowa DOT · 31-C031-131 · $120.00 per TON · qty 124.0 · bid tab
- 2026-04-21 · Iowa DOT · 31-C031-131 · $59.25 per TON · qty 2650.0 · bid tab
- 2026-04-21 · Iowa DOT · 31-C031-131 · $56.35 per TON · qty 4400.0 · bid tab
- 2026-04-21 · Iowa DOT · 31-C031-131 · $120.00 per TON · qty 30.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-127 · $135.00 per TON · qty 850.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-130 · $58.95 per TON · qty 3220.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-130 · $119.19 per TON · qty 171.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-130 · $63.25 per TON · qty 2200.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-130 · $120.50 per TON · qty 30.0 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-124 · $152.00 per TON · qty 25.0 · bid tab
(10 most recent of 26 shown; all in the Hubstake feed) |
| concrete pavement | EACH | 4 | $1.00 | $1.00 to $1.00 | Bids- 2026-03-17 · Iowa DOT · 31-C031-127 · $1.00 per EACH · qty 67293.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $1.00 per EACH · qty 3874.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $1.00 per EACH · qty 108050.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $1.00 per EACH · qty 69263.0 · bid tab
|
| concrete pavement | LS | 1 | $1,500.00 | $1,500.00 to $1,500.00 | Bids- 2025-12-16 · Iowa DOT · 31-0252-606 · $1,500.00 per LS · qty 1.0 · bid tab
|
| concrete pavement | SY | 5 | $81.70 | $44.00 to $173.00 | Bids- 2026-05-19 · Iowa DOT · 31-0209-261 · $108.55 per SY · qty 892.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-127 · $44.00 per SY · qty 5158.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $81.70 per SY · qty 3570.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $173.00 per SY · qty 304.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $53.00 per SY · qty 92514.7 · bid tab
|
| curb gutter | EACH | 4 | $27.50 | $11.00 to $52.00 | Bids- 2026-05-19 · Iowa DOT · 31-2100-711 · $13.00 per EACH · qty 10.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $11.00 per EACH · qty 4.0 · bid tab
- 2024-02-20 · Iowa DOT · 31-0039-031 · $52.00 per EACH · qty 1.0 · bid tab
- 2024-02-20 · Iowa DOT · 31-0039-031 · $42.00 per EACH · qty 7.0 · bid tab
|
| curb gutter | LF | 10 | $26.00 | $12.40 to $40.00 | Bids- 2026-05-19 · Iowa DOT · 31-2100-711 · $12.40 per LF · qty 72.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $30.00 per LF · qty 163.4 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $26.00 per LF · qty 2143.1 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-124 · $33.00 per LF · qty 476.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $15.00 per LF · qty 55.0 · bid tab
- 2024-09-24 · Iowa DOT · 31-0209-284 · $15.00 per LF · qty 20.0 · bid tab
- 2024-02-20 · Iowa DOT · 31-0039-031 · $26.00 per LF · qty 52.0 · bid tab
- 2024-02-20 · Iowa DOT · 31-0039-031 · $40.00 per LF · qty 1051.5 · bid tab
- 2024-02-20 · Iowa DOT · 31-0039-031 · $40.00 per LF · qty 1137.0 · bid tab
- 2024-02-20 · Iowa DOT · 31-0039-031 · $26.00 per LF · qty 3.0 · bid tab
|
| excavation embankment | CY | 16 | $13.25 | $3.50 to $55.00 | Bids- 2026-05-19 · Iowa DOT · 31-0209-261 · $25.00 per CY · qty 720.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $8.50 per CY · qty 1823.0 · bid tab
- 2025-10-22 · Iowa DOT · 31-0209-286 · $37.00 per CY · qty 644.0 · bid tab
- 2025-07-15 · Iowa DOT · 31-0039-040 · $9.00 per CY · qty 225.0 · bid tab
- 2025-07-15 · Iowa DOT · 31-0209-288 · $10.00 per CY · qty 340.0 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-124 · $44.00 per CY · qty 12.0 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-125 · $33.00 per CY · qty 550.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $6.50 per CY · qty 71200.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $3.50 per CY · qty 20346.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $11.00 per CY · qty 66005.0 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed) |
| fire hydrant | EACH | 1 | $5,000.00 | $5,000.00 to $5,000.00 | Bids- 2025-12-16 · Iowa DOT · 31-0252-606 · $5,000.00 per EACH · qty 1.0 · bid tab
|
| lime cement stabilization | ACRE | 10 | $615.00 | $300.00 to $1,300.00 | Bids- 2026-02-17 · Iowa DOT · 31-C031-122 · $500.00 per ACRE · qty 0.4 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-125 · $600.00 per ACRE · qty 0.66 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $650.00 per ACRE · qty 47.6 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $650.00 per ACRE · qty 6.4 · bid tab
- 2024-09-24 · Iowa DOT · 31-0209-284 · $1,300.00 per ACRE · qty 0.4 · bid tab
- 2024-08-20 · Iowa DOT · 31-C031-121 · $300.00 per ACRE · qty 2.06 · bid tab
- 2024-07-16 · Iowa DOT · 31-C031-119 · $500.00 per ACRE · qty 0.5 · bid tab
- 2024-02-20 · Iowa DOT · 31-0039-031 · $630.00 per ACRE · qty 0.4 · bid tab
- 2024-02-20 · Iowa DOT · 31-0039-031 · $1,000.00 per ACRE · qty 0.17 · bid tab
- 2024-02-20 · Iowa DOT · 31-C031-118 · $500.00 per ACRE · qty 0.3 · bid tab
|
| lime cement stabilization | LF | 3 | $12.00 | $10.00 to $100.00 | Bids- 2026-05-19 · Iowa DOT · 31-0209-261 · $100.00 per LF · qty 400.0 · bid tab
- 2025-07-15 · Iowa DOT · 31-0209-288 · $10.00 per LF · qty 200.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $12.00 per LF · qty 2100.0 · bid tab
|
| lime cement stabilization | SY | 7 | $2.20 | $1.17 to $42.25 | Bids- 2026-03-17 · Iowa DOT · 31-C031-127 · $2.20 per SY · qty 1600.0 · bid tab
- 2026-02-17 · Iowa DOT · 31-C031-128 · $22.00 per SY · qty 500.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $1.17 per SY · qty 5440.0 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-125 · $2.00 per SY · qty 150.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $1.50 per SY · qty 114959.0 · bid tab
- 2024-12-17 · Iowa DOT · 31-C031-123 · $42.25 per SY · qty 500.0 · bid tab
- 2024-08-20 · Iowa DOT · 31-C031-121 · $3.00 per SY · qty 151.0 · bid tab
|
| lime cement stabilization | TON | 14 | $23.00 | $9.00 to $44.00 | Bids- 2026-04-21 · Iowa DOT · 31-C031-131 · $25.00 per TON · qty 250.0 · bid tab
- 2026-04-21 · Iowa DOT · 31-C031-131 · $25.00 per TON · qty 500.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-127 · $21.00 per TON · qty 1000.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-127 · $21.00 per TON · qty 500.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-130 · $23.00 per TON · qty 250.0 · bid tab
- 2026-03-17 · Iowa DOT · 31-C031-130 · $23.00 per TON · qty 500.0 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-124 · $44.00 per TON · qty 100.0 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-124 · $44.00 per TON · qty 50.0 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-125 · $21.00 per TON · qty 500.0 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-125 · $14.00 per TON · qty 250.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed) |
| manhole | EACH | 4 | $5,490.00 | $1,900.00 to $8,370.00 | Bids- 2025-12-16 · Iowa DOT · 31-0252-606 · $3,000.00 per EACH · qty 1.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $8,370.00 per EACH · qty 1.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $7,980.00 per EACH · qty 2.0 · bid tab
- 2024-09-24 · Iowa DOT · 31-0209-284 · $1,900.00 per EACH · qty 1.0 · bid tab
|
| sidewalk | EACH | 7 | $6,300.00 | $2,800.00 to $8,780.00 | Bids- 2025-12-16 · Iowa DOT · 31-0252-606 · $2,800.00 per EACH · qty 1.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $6,300.00 per EACH · qty 1.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $8,060.00 per EACH · qty 1.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $3,070.00 per EACH · qty 4.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $8,780.00 per EACH · qty 1.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $8,560.00 per EACH · qty 5.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $6,080.00 per EACH · qty 2.0 · bid tab
|
| sidewalk | SY | 17 | $66.00 | $50.00 to $110.00 | Bids- 2026-05-19 · Iowa DOT · 31-2100-711 · $75.00 per SY · qty 16.0 · bid tab
- 2026-05-19 · Iowa DOT · 31-2100-711 · $110.00 per SY · qty 18.8 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $60.00 per SY · qty 169.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $64.00 per SY · qty 695.0 · bid tab
- 2025-10-22 · Iowa DOT · 31-0209-273 · $100.00 per SY · qty 25.6 · bid tab
- 2025-04-15 · Iowa DOT · 31-C031-124 · $74.00 per SY · qty 210.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $63.00 per SY · qty 2152.6 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $93.00 per SY · qty 100.3 · bid tab
- 2024-08-20 · Iowa DOT · 31-C031-121 · $65.25 per SY · qty 123.0 · bid tab
- 2024-02-20 · Iowa DOT · 31-0039-031 · $51.00 per SY · qty 1718.8 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed) |
| storm pipe 18-inch | LF | 6 | $62.50 | $42.00 to $105.00 | Bids- 2025-12-16 · Iowa DOT · 31-0252-606 · $105.00 per LF · qty 155.0 · bid tab
- 2025-07-15 · Iowa DOT · 31-0209-288 · $75.00 per LF · qty 172.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $50.00 per LF · qty 98.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $77.00 per LF · qty 499.0 · bid tab
- 2024-07-16 · Iowa DOT · 31-C031-119 · $42.00 per LF · qty 156.0 · bid tab
- 2024-02-20 · Iowa DOT · 31-C031-118 · $44.00 per LF · qty 240.0 · bid tab
|
| storm pipe 24-inch | LF | 12 | $91.00 | $50.00 to $150.00 | Bids- 2026-02-17 · Iowa DOT · 31-C031-122 · $50.00 per LF · qty 240.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $125.00 per LF · qty 9.0 · bid tab
- 2025-07-15 · Iowa DOT · 31-0209-288 · $95.00 per LF · qty 140.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $115.00 per LF · qty 216.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $87.00 per LF · qty 429.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $99.00 per LF · qty 730.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $54.00 per LF · qty 63.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $52.00 per LF · qty 1120.0 · bid tab
- 2024-09-24 · Iowa DOT · 31-0209-284 · $150.00 per LF · qty 110.0 · bid tab
- 2024-08-20 · Iowa DOT · 31-C031-121 · $55.00 per LF · qty 115.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| storm pipe 30-inch | LF | 6 | $147.50 | $96.15 to $225.00 | Bids- 2025-04-15 · Iowa DOT · 31-C031-125 · $161.00 per LF · qty 161.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $145.00 per LF · qty 142.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $130.00 per LF · qty 222.0 · bid tab
- 2024-09-24 · Iowa DOT · 31-0209-284 · $150.00 per LF · qty 250.0 · bid tab
- 2024-08-20 · Iowa DOT · 31-C031-121 · $96.15 per LF · qty 130.0 · bid tab
- 2024-08-20 · Iowa DOT · 31-C031-121 · $225.00 per LF · qty 8.0 · bid tab
|
| storm pipe 36-inch | LF | 7 | $160.00 | $82.00 to $279.00 | Bids- 2025-04-15 · Iowa DOT · 31-C031-125 · $279.00 per LF · qty 12.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $82.00 per LF · qty 20.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $155.00 per LF · qty 232.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $215.00 per LF · qty 54.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $245.00 per LF · qty 110.0 · bid tab
- 2024-09-24 · Iowa DOT · 31-0209-284 · $160.00 per LF · qty 46.0 · bid tab
- 2024-08-20 · Iowa DOT · 31-C031-121 · $136.00 per LF · qty 20.0 · bid tab
|
| storm pipe 42-inch | LF | 3 | $210.00 | $140.00 to $312.00 | Bids- 2025-04-15 · Iowa DOT · 31-C031-125 · $312.00 per LF · qty 19.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $210.00 per LF · qty 186.0 · bid tab
- 2024-05-21 · Iowa DOT · 31-0209-275 · $140.00 per LF · qty 12.0 · bid tab
|
| storm pipe 48-inch | LF | 3 | $235.00 | $100.00 to $305.00 | Bids- 2025-02-18 · Iowa DOT · 31-0039-025 · $235.00 per LF · qty 192.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $305.00 per LF · qty 54.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $100.00 per LF · qty 25.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $290.00 | $290.00 to $290.00 | Bids- 2025-02-18 · Iowa DOT · 31-0039-025 · $290.00 per LF · qty 50.0 · bid tab
|
| storm pipe 60-inch | LF | 2 | $267.50 | $200.00 to $335.00 | Bids- 2025-02-18 · Iowa DOT · 31-0039-025 · $335.00 per LF · qty 92.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $200.00 per LF · qty 86.0 · bid tab
|
| storm pipe 72-inch | LF | 2 | $543.50 | $507.00 to $580.00 | Bids- 2025-04-15 · Iowa DOT · 31-C031-125 · $507.00 per LF · qty 64.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $580.00 per LF · qty 54.0 · bid tab
|
| storm pipe 84-inch | LF | 2 | $732.50 | $665.00 to $800.00 | Bids- 2025-02-18 · Iowa DOT · 31-0039-025 · $665.00 per LF · qty 92.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $800.00 per LF · qty 56.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 3 | $1,120.00 | $2.80 to $2,350.00 | Bids- 2025-02-18 · Iowa DOT · 31-0039-025 · $2,350.00 per LF · qty 308.0 · bid tab
- 2025-02-18 · Iowa DOT · 31-0039-025 · $1,120.00 per LF · qty 73.0 · bid tab
- 2024-09-24 · Iowa DOT · 31-0209-284 · $2.80 per LF · qty 46.0 · bid tab
|
| water main 12-inch | LF | 1 | $230.00 | $230.00 to $230.00 | Bids- 2025-12-16 · Iowa DOT · 31-0252-606 · $230.00 per LF · qty 34.0 · bid tab
|
| water main 6-inch | LF | 1 | $230.00 | $230.00 to $230.00 | Bids- 2025-12-16 · Iowa DOT · 31-0252-606 · $230.00 per LF · qty 9.0 · bid tab
|
| water service | EACH | 2 | $675.00 | $350.00 to $1,000.00 | Bids- 2025-12-16 · Iowa DOT · 31-0252-606 · $1,000.00 per EACH · qty 1.0 · bid tab
- 2025-12-16 · Iowa DOT · 31-0252-606 · $350.00 per EACH · qty 1.0 · bid tab
|
| water service | LF | 1 | $100.00 | $100.00 to $100.00 | Bids- 2025-12-16 · Iowa DOT · 31-0252-606 · $100.00 per LF · qty 2.5 · bid tab
|